Weil-McLain Series 2 manual Chart 4 Flame & Power lights flashing

Page 54

GOLD CGi Gas-Fired Water Boiler — Boiler Manual

11c Troubleshooting — control module lights (cont.)

CHART 4 FLAME & POWER lights flashing

— Usually indicates flame sensed when it shouldn't be there —

Electrical shock hazard — Wherever you see TURN OFF POWER , follow the instructions. Failure to follow instructions could result in severe personal injury, death or substantial property damage.

Are manual main shutoff valve and gas valve open?

No

Yes

• Leave main manual gas valve closed.

 

 

 

• Turn off power to the boiler at service switch or breaker.

 

 

 

• Wait at least 45 seconds.

 

 

• Turn off power to boiler at service switch or breaker.

 

 

 

 

• Turn on power to boiler.

 

 

• Wait at least 45 seconds.

 

 

 

 

 

 

 

 

• Restart boiler, following Operating instructions in this

• Turn on power to boiler.

 

 

 

 

 

 

manual (Section 9c).

 

 

• Restart boiler, following Operating instructions in this

 

 

 

 

• Look through the pilot inspection port to see if the pilot is

manual (Section 9c).

 

 

 

 

 

 

burning during the prepurge period (first 30 seconds of

Do FLAME and POWER lights still flash?

 

 

operation).

 

 

 

 

 

 

 

 

Is pilot burning during prepurge period?

No

 

 

Yes

 

 

 

 

 

 

 

No

 

Yes

 

 

 

 

 

 

 

 

 

Replace control module.

Retest.

 

 

 

• Allow boiler to continue cycling.

 

Replace gas valve.

 

 

 

 

 

 

 

 

Retest boiler.

 

 

 

 

 

 

 

 

Are FLAME & POWER lights flashing?

 

 

 

 

 

 

 

 

 

 

 

Are FLAME and POWER lights flashing?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

Yes

 

 

No

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TURN OFF POWER

 

Boiler may now be

 

Replace control

 

Boiler should now

 

Replace control

 

 

operating

 

 

module.

 

 

operate normally.

 

 

module.

 

to boiler at service switch

 

 

 

 

 

 

 

 

 

 

 

normally.

 

 

 

 

 

 

 

 

 

 

 

 

 

or breaker.

 

 

 

Retest.

 

Original flashing

 

Retest.

 

 

 

 

 

 

 

 

Open main manual gas

 

Perform start-up

 

 

 

 

 

 

FLAME light

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

valve.

 

 

procedures in

 

 

 

 

 

 

caused by gas

 

 

 

 

• Turn on power to boiler

 

 

boiler manual to

 

 

 

 

 

 

valve not

 

 

 

 

 

at service switch or

 

 

verify proper

 

 

 

 

 

 

operating properly.

 

 

 

 

 

breaker.

 

 

operation.

 

 

 

 

 

See normal

 

 

 

 

• Restart boiler per lighting

 

 

 

 

 

 

 

 

 

 

 

 

 

 

instructions.

 

 

 

 

 

 

 

 

 

 

sequence of

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Perform start-up

 

 

 

 

 

 

 

 

 

 

operation,

 

 

 

 

 

procedures in boiler

 

 

 

 

 

 

 

 

 

 

Figure 30,

 

 

 

 

 

manual to verify proper

 

 

 

 

 

 

 

 

 

 

page 37.

 

 

 

 

 

operation.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

54

Part Number 550-110-710/0107

 

Image 54
Contents Gold CGi How it works Gold CGi Gas-Fired Induced-Draft Water Boiler Contents Please read before proceeding 1a Prepare boiler location codes & checklist Installations must follow these codesBefore locating the boiler, check the following 1b Prepare boiler location clearances When removing boiler from an existing common vent system 1c Prepare boiler location vent systemChimney or vent require- ments 1d Prepare boiler location air contamination Products to avoidAir opening options 1e Prepare boiler location air openingsAir openings must be provided Two openings Air supply from inside the buildingSingle air opening option Exhaust fans and air moversMotorized air dampers Exception for large spacesPlace boiler/crate near position 2a Prepare boiler placement & setupOrifice replacement procedure Inspect orifices and burnersDrain and remove fittings 2b Prepare boiler pressure testHydrostatic pressure test Prepare boiler for testCGi venting methods Chimney draft or Direct exhaust 3a Venting general informationVenting chimney draft venting Chimney draft venting3c Venting Direct exhaust components Obtain vent system components3d Venting direct exhaust vent starter 3e Venting direct exhaust termination Vent termination minimum clearances3f Venting direct exhaust installation Direct exhaust vertical ventingUsing any termination other than one of those shown 4a Water piping general information 4b Water piping single-zone system Diaphragm-type or bladder- type expansion tank FigureClosed-type expansion tank 4c Water piping multiple zones Piping multiple zonesZoning with circulators Valve adjustment 4d Piping low temperature systemsTemperature gauges Primary/secondary preferred bypass piping methodPrimary/secondary piping Valve adjustment BOILER-bypass piping methodBoiler-bypass piping Zoning with SYSTEM-bypass piping method 4e Water piping refrigeration system Prevent chilled water from entering boilerNatural Gas Connecting gas supply piping to boilerGas piping Propane GasWiring connections Field wiringElectrical installation must comply with ThermostatCheck for gas leaks Freeze protection when used7a Start-up preparation Determine if water treatment is neededFill the system with water Inspect system water pipingInspect base insulation 7b Start-up operate boiler Start the boilerCheck system and boiler Check for 7c Start-up if boiler doesn’t startCheck burner flames Pilot burner flame FigureCheck-out procedure checklist Installation and service certificate9a Operation sequence 9b Operation wiring diagrams Schematic wiring diagramLadder wiring diagram 9c Operating instructions CGi-25 to CGi-6 9c Operating instructions CGi-25 to CGi-6 9c Operating instructions CGi-25 to CGi-8 10a Service and maintenance schedule Verify Proper Operation After Servicing10b Service and maintenance annual start-up Condensate drain system 10b Service & maintenance annual start-upBurners and base Inducer motorAir vents and air elimination Gas pipingCold fill and operating pressures Limit controls and cutoffsReview with owner Boiler relief valveBefore troubleshooting 11a Troubleshooting procedure11b Troubleshooting components Air pressure switchControl indicator lights Lockout modes Control indicator lightsTroubleshooting the control module Control moduleControl module connections 11c Troubleshooting control module lights Chart 1- Troubleshooting Power light statusChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Does blower motor operate? Item 8 , Verify Sequence 12a Replacement parts Section assembly Base Jacket Trim Controls12b Replacement parts section assembly Section assembly12c Replacement parts base Base assemblyDescription Weil-McLain Part number 12d Replacement parts jacket Jacket assemblyBoiler 12e Replacement parts trim Fittings shown are included with boiler12f Replacement parts controls Propane gas components13a Dimensions Dimensional drawing13b Ratings DOEHandling ceramic fiber and fiberglass materials Removal of Combustion Chamber Lining or Base Panels
Related manuals
Manual 12 pages 22.83 Kb

Series 2 specifications

The Weil-McLain Series 2 is a highly regarded boiler system known for its robustness, efficiency, and ease of installation. Designed primarily for residential and light commercial applications, the Series 2 boasts a variety of features that cater to diverse heating needs.

One of the standout characteristics of the Series 2 is its cast iron construction, which provides durability and longevity. Cast iron is well-suited for heat retention, allowing the boiler to operate more efficiently and deliver consistent warmth. The Series 2 is available in multi-fuel options, accommodating both natural gas and propane, making it versatile for various installations.

Efficiency is a key feature of the Weil-McLain Series 2, with annual fuel utilization efficiency (AFUE) ratings that meet or exceed industry standards. This ensures that homeowners can enjoy not only a comfortable living environment but also reduced energy bills. The Series 2 is designed to provide optimal performance, minimizing fuel consumption while maximizing heat output.

Another innovative aspect of the Series 2 is its user-friendly control system. Equipped with advanced controls, the boiler allows for precise temperature management and can easily be integrated with existing heating systems. This adaptability is crucial for ensuring that the boiler matches the specific heating demands of any space, increasing overall comfort levels.

Installation is straightforward, thanks to the boiler's thoughtful design. The Series 2 features a compact footprint, allowing for flexible placement in various settings. Additionally, Weil-McLain provides comprehensive documentation and customer support, making it easier for technicians to install and maintain the system.

The Series 2 also includes features aimed at ease of maintenance. Its clean-out ports facilitate quick access for servicing, ensuring that the boiler remains in peak operating condition throughout its lifespan. Weil-McLain’s commitment to quality means users can expect reliable performance year after year.

Overall, the Weil-McLain Series 2 stands out as an excellent choice for those seeking a dependable, efficient, and straightforward heating solution. Its combination of durable construction, high efficiency, and user-centric design makes it a leading option in the boiler market, appealing to both homeowners and professionals alike. Whether for a new installation or a replacement, the Series 2 is poised to deliver exceptional heating performance.