Weil-McLain Series 2 manual Item 8

Page 56

GOLD CGi Gas-Fired Water Boiler — Boiler Manual

11c Troubleshooting — control module lights (cont.)

CHART 6 FLAME light flashing and POWER light on steady

ALSO — Troubleshooting failure to establish main flame

 

 

 

 

 

 

Electrical shock hazard — Wherever you see TURN OFF POWER

, follow the instructions. Failure to follow

 

 

 

 

 

 

 

 

 

 

 

instructions could result in severe personal injury, death or substantial property damage.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Are main manual shutoff valve and boiler gas valve open?

 

 

 

 

 

 

Is pilot flame visible through inspection port?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

Yes

 

 

 

 

No

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TURN OFF POWER

to boiler at service switch or breaker.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check the voltage across

 

Make sure ground wire

• Open main manual shutoff valve and boiler gas valve (per

 

 

 

 

 

 

 

 

 

 

 

 

 

 

terminals PV and PV/MV of

 

 

terminal is securely fastened

 

Operating instructions in this manual).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the gas valve.

 

 

 

 

 

 

to control module mounting

• Turn on power at service switch or breaker. A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Is 24 VAC present there?

 

 

screw.

 

 

 

 

 

 

 

 

Does FLAME light flash now?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Boiler should be in

 

• Verify inlet gas pressure at gas

 

 

 

 

 

 

If the wiring from the

 

 

Check the voltage across

 

 

 

valve:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

control module to gas

 

 

 

terminals MV and PV/MV of

 

normal operating

 

 

 

Natural gas — 5.0" w.c. min/14.0"

 

 

 

 

 

 

 

valve is intact, replace the

 

 

 

 

the gas valve.

 

 

 

sequence.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

w.c. max

 

 

 

 

 

 

 

control module.

 

 

 

 

Is 24 VAC present there?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Observe operation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Retest.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Propane — 11.0" w.c. min/14.0"

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

Yes

 

until thermostat is

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

w.c. max

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

satisfied and blower

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Is gas present at gas valve inlet and

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

has completed its

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

post-purge cycle.

 

 

 

 

 

 

within above range?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Verify inlet gas pressure at gas valve:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Natural gas — 5.0" w.c. min/14.0" w.c. max

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Propane — 11.0" w.c. min/14.0" w.c. max

 

 

TURN OFF POWER

to

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

boiler at service switch or

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Is gas present at gas valve inlet and within above range?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

breaker.

 

 

 

 

 

Contact gas supplier to correct

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Remove burner shield (see

 

 

 

 

pressure or gas supply.

 

 

 

 

No

 

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 40, item 4, page 60

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

for location).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TURN OFF POWER to boiler

 

 

 

TURN OFF POWER to boiler at service switch or breaker.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

at service switch or breaker.

 

 

 

Check flame signal — Detach sense lead from ignition control

• Verify pilot gas line is not

 

 

 

 

 

 

 

 

 

 

kinked, obstructed or

 

 

 

 

 

Remove burner shield (see

 

 

 

 

(Figure 38, item 8, page 50).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

damaged and is correctly

 

 

 

 

 

 

Figure 40, item 4, page 60 for

 

 

 

Connect negative lead of MICROAMMETER to control sense

 

attached to pilot and gas

 

 

 

 

 

 

location).

 

 

 

 

terminal (Figure 38, item 8, page 50). Connect positive lead of

 

valve.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MICROAMMETER to sense wire.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Verify pilot ignition electrode,

 

 

 

Verify pilot burner is securely

 

 

 

DISCONNECT red wire connected to terminal MV of the gas

 

electrode ceramic and spark

 

 

 

 

attached to pilot bracket, bracket

 

 

 

 

valve.

 

 

 

 

 

 

 

 

 

 

 

 

 

lead wire from control are in

 

 

 

 

is securely attached to cross tie,

 

 

 

Turn on power to boiler and allow to cycle. As soon as pilot is

 

good condition. Spark gap

 

 

 

 

 

 

and there is no corrosion on the

 

 

 

 

burning, the MICROAMMETER should read at least 1.0

 

should be approximately 1/8".

 

 

 

parts which would affect the

 

 

 

 

microamp.

 

 

 

 

 

 

 

 

 

 

 

 

• Correct any above problems,

 

 

 

 

ground path for flame sense.

 

 

 

 

 

Is flame signal at least 1.0 microamp?

 

 

 

replacing pilot if burner or

 

 

 

 

 

Verify that pilot flame rod, flame

 

 

 

 

 

 

 

 

wiring is damaged.

 

 

 

 

 

 

rod ceramic and lead wire from

 

 

 

 

No

 

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Reinstall burner shield to

 

 

 

 

 

 

control module to flame rod are in

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

operate boiler for retest after

 

 

 

 

good condition.

 

 

 

If none of the previous steps

 

• If the wiring from the

 

any changes or corrections.

 

 

 

Correct any above problems,

 

 

 

 

(including replacing pilot)

 

 

 

 

 

 

 

 

 

 

control module to gas

• If none of the above corrects

 

 

 

 

replacing pilot if burner or wiring

 

 

 

 

corrects problem, then replace

 

 

 

 

 

 

 

 

 

 

valve is intact, replace the

 

problem, then replace the

 

 

 

 

 

 

is damaged.

 

 

 

 

the control module, reinstall

 

 

 

 

 

 

 

 

 

 

 

 

 

control module and retest.

 

control module and retest.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

burner shield and retest.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

56

Part Number 550-110-710/0107

 

Image 56
Contents Gold CGi How it works Gold CGi Gas-Fired Induced-Draft Water Boiler Contents Please read before proceeding Before locating the boiler, check the following 1a Prepare boiler location codes & checklistInstallations must follow these codes 1b Prepare boiler location clearances Chimney or vent require- ments When removing boiler from an existing common vent system1c Prepare boiler location vent system 1d Prepare boiler location air contamination Products to avoid1e Prepare boiler location air openings Air openings must be providedAir opening options Two openings Air supply from inside the buildingExhaust fans and air movers Motorized air dampersSingle air opening option Exception for large spaces2a Prepare boiler placement & setup Orifice replacement procedurePlace boiler/crate near position Inspect orifices and burners2b Prepare boiler pressure test Hydrostatic pressure testDrain and remove fittings Prepare boiler for test3a Venting general information Venting chimney draft ventingCGi venting methods Chimney draft or Direct exhaust Chimney draft venting3c Venting Direct exhaust components Obtain vent system components3d Venting direct exhaust vent starter 3e Venting direct exhaust termination Vent termination minimum clearances3f Venting direct exhaust installation Direct exhaust vertical ventingUsing any termination other than one of those shown 4a Water piping general information Closed-type expansion tank 4b Water piping single-zone systemDiaphragm-type or bladder- type expansion tank Figure 4c Water piping multiple zones Piping multiple zonesZoning with circulators 4d Piping low temperature systems Temperature gaugesValve adjustment Primary/secondary preferred bypass piping methodPrimary/secondary piping Valve adjustment BOILER-bypass piping methodBoiler-bypass piping Zoning with SYSTEM-bypass piping method 4e Water piping refrigeration system Prevent chilled water from entering boilerConnecting gas supply piping to boiler Gas pipingNatural Gas Propane GasField wiring Electrical installation must comply withWiring connections ThermostatFreeze protection when used 7a Start-up preparationCheck for gas leaks Determine if water treatment is neededInspect base insulation Fill the system with waterInspect system water piping Check system and boiler 7b Start-up operate boilerStart the boiler 7c Start-up if boiler doesn’t start Check burner flamesCheck for Pilot burner flame FigureCheck-out procedure checklist Installation and service certificate9a Operation sequence 9b Operation wiring diagrams Schematic wiring diagramLadder wiring diagram 9c Operating instructions CGi-25 to CGi-6 9c Operating instructions CGi-25 to CGi-6 9c Operating instructions CGi-25 to CGi-8 10a Service and maintenance schedule Verify Proper Operation After Servicing10b Service and maintenance annual start-up 10b Service & maintenance annual start-up Burners and baseCondensate drain system Inducer motorGas piping Cold fill and operating pressuresAir vents and air elimination Limit controls and cutoffsReview with owner Boiler relief valve11a Troubleshooting procedure 11b Troubleshooting componentsBefore troubleshooting Air pressure switchControl indicator lights Troubleshooting the control moduleControl indicator lights Lockout modes Control moduleControl module connections 11c Troubleshooting control module lights Chart 1- Troubleshooting Power light statusChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Does blower motor operate? Item 8 , Verify Sequence 12a Replacement parts Section assembly Base Jacket Trim Controls12b Replacement parts section assembly Section assembly12c Replacement parts base Base assemblyDescription Weil-McLain Part number 12d Replacement parts jacket Jacket assemblyBoiler 12e Replacement parts trim Fittings shown are included with boiler12f Replacement parts controls Propane gas components13a Dimensions Dimensional drawing13b Ratings DOEHandling ceramic fiber and fiberglass materials Removal of Combustion Chamber Lining or Base Panels
Related manuals
Manual 12 pages 22.83 Kb

Series 2 specifications

The Weil-McLain Series 2 is a highly regarded boiler system known for its robustness, efficiency, and ease of installation. Designed primarily for residential and light commercial applications, the Series 2 boasts a variety of features that cater to diverse heating needs.

One of the standout characteristics of the Series 2 is its cast iron construction, which provides durability and longevity. Cast iron is well-suited for heat retention, allowing the boiler to operate more efficiently and deliver consistent warmth. The Series 2 is available in multi-fuel options, accommodating both natural gas and propane, making it versatile for various installations.

Efficiency is a key feature of the Weil-McLain Series 2, with annual fuel utilization efficiency (AFUE) ratings that meet or exceed industry standards. This ensures that homeowners can enjoy not only a comfortable living environment but also reduced energy bills. The Series 2 is designed to provide optimal performance, minimizing fuel consumption while maximizing heat output.

Another innovative aspect of the Series 2 is its user-friendly control system. Equipped with advanced controls, the boiler allows for precise temperature management and can easily be integrated with existing heating systems. This adaptability is crucial for ensuring that the boiler matches the specific heating demands of any space, increasing overall comfort levels.

Installation is straightforward, thanks to the boiler's thoughtful design. The Series 2 features a compact footprint, allowing for flexible placement in various settings. Additionally, Weil-McLain provides comprehensive documentation and customer support, making it easier for technicians to install and maintain the system.

The Series 2 also includes features aimed at ease of maintenance. Its clean-out ports facilitate quick access for servicing, ensuring that the boiler remains in peak operating condition throughout its lifespan. Weil-McLain’s commitment to quality means users can expect reliable performance year after year.

Overall, the Weil-McLain Series 2 stands out as an excellent choice for those seeking a dependable, efficient, and straightforward heating solution. Its combination of durable construction, high efficiency, and user-centric design makes it a leading option in the boiler market, appealing to both homeowners and professionals alike. Whether for a new installation or a replacement, the Series 2 is poised to deliver exceptional heating performance.