New Buck Corporation 91 manual Option a

Page 8

OPTION (A)

STARTER PIPE

SEAL TRIM PANELS WITH INSULA-

TION / AND OR HIGH TEMPERATURE

CAULK

NOTE: New Buck Corporation grants no warranty, implied or stated, for the installation or maintenance of your appliance, and assumes no responsibility of any consequential damage

AIRTIGHT INSU-

LATED CLEAN-

OUT

REMOVE

DAMPER

OR WIRE IT OPEN

Image 8
Contents Page Page Page Operating Controls Room Heater FeaturesSafety Standard Compliance Model 91 Wood Stove Identification EPA Compliance StatusCatalyst Warranty Achieving Catalytic LIGHT-OFF When RefuelingCatalyst Equipped Proper Fuel SelectionCreosote Formation and Need for Removal Catalyst MonitoringASH Removal Option a Installation Fireplace Insert Minimum Clearances Positioning the Heater Mounting the Trim PanelsFinal Check Section Floor Protection Tools for InstallationModel 91 BAY Minimum Clearances Preparing the Stove for Installation ChimneyClose Clearance Installations in inches Rise Per. FT Brick Clear Tested and Listed Wall Protector Wood Heater Safety Helpful HintsOperation Guide to the Different Burning Qualities of WoodBuilding a Fire Burn RatesPreventive Maintenance / Parts Replacement the Catalysts Door Gasket Replacement Cold Heater Motor Assembly Replacement Wiring Schematic Page