New Buck Corporation 91 manual Installation Fireplace Insert

Page 9

OPTION (B)

NOTE: Follow installation instruction with Direct Connection Kit.

(Kit sold separately)

SEAL TRIM PANELS

WITH INSULATION /

AND OR HIGHTEM-

PERATURE CAULK

STAINLESS

STEEL

CHIMNEY

CONNEC-

TOR MUST

EXTEND 1’

PAST THE

BLOCK-OFF

PLATE OR

TO THE

FLUE LINER

AIRTIGHT

INSULATED

CLEAN-OUT

REMOVE

DAMPER

OR WIRE IT

OPEN

BLOCK-OFF PLATE

OR DAMPER

ADAPTER

OPTION (C)

NOTE: Follow installation instruction with Positive Connection Kit.

(Kit sold separately)

INSTALL A NON-COMBUSTIBLE COVER PLATE TO PREVENT WATER FROM ENTERING THE CHIMNEY

TRIM PANELS

CAP(PREVENTS

WATER FROM

ENTERING)

FLUE

LINER

THE LINER MUST

BE STAINLESS

STEEL CONNEC-

TOR OR FLEXIBLE

VENT. FOLLOW

THE LINER MANU-

FACTURE’S IN-

STRUCTIONS FOR

INSTALLATION

AND SUPPORT.

AIRTIGHT

INSULATED

CLEAN-OUT

REMOVE

DAMPER

OR WIRE

IT OPEN

INSTALLATION (Fireplace Insert)

Minimum Clearances to Combustible Materials (in inches)

FIGURE 1 FIREPLACE INSERT

 

MANTEL

 

30"

 

20"

20"

15"

 

8"

24"

HEARTH EXTENSION

Image 9
Contents Page Page Page Room Heater Features Safety Standard ComplianceOperating Controls EPA Compliance Status Model 91 Wood Stove IdentificationAchieving Catalytic LIGHT-OFF When Refueling Catalyst WarrantyCatalyst Equipped Proper Fuel SelectionCatalyst Monitoring ASH RemovalCreosote Formation and Need for Removal Option a Installation Fireplace Insert Minimum Clearances Mounting the Trim Panels Positioning the HeaterFinal Check Section Tools for Installation Model 91 BAY Minimum ClearancesFloor Protection Chimney Preparing the Stove for InstallationClose Clearance Installations in inches Rise Per. FT Brick Clear Tested and Listed Wall Protector Helpful Hints Wood Heater SafetyGuide to the Different Burning Qualities of Wood OperationBurn Rates Building a FirePreventive Maintenance / Parts Replacement the Catalysts Door Gasket Replacement Cold Heater Motor Assembly Replacement Wiring Schematic Page