Heart & Home Collectables MHC36, MHR36 manual PRE-INSTALLATION Preparation

Page 8

MHC36 AND MHR36 INSTALLATION INSTRUCTIONS

D. PRE-INSTALLATION PREPARATION

1.Fireplace Locations and Space Requirements

Several options are available to you when choosing a location for your fireplace. This fireplace may be used as a room divider, installed along a wall or across a corner. See Figure 2.

Locating the fireplace in a basement, near frequently opened doors, central heat outlets or returns, or other locations of considerable air movement can affect the performance and cause intermittent smoke spillage from the front of the fireplace. Consideration should be given to these factors before deciding on a location.

CLEARANCES!

A minimum 1 in. air clearance must be maintained at the back and sides of the fire- place assembly except at the nailing flange where the clearance is 1/2 in.

Chimney sections at any level require a 2 in.minimum air space clearance between the framing and chimney section.

Figure 2 - Fireplace Locations

WARNING!

1.Do not install in sleeping rooms.

2.Combustion air needs of a heavily fired fireplace may deplete the available oxygen supply.

CAUTION:

The structural integrity of the manufactured housing floor, wall, ceiling and roof must be maintained.

WARNING!

For all manufactured housing installations the outside air kit, glass door kit and MH842 manufactured housing roof thimble and flashing kit, must be used.

8

31072 Rev G

08/04

Image 8
Contents Installation & Operating Instructions Table of Contents Design and Installation Considerations Listings and Code Approvals Description of the Fireplace SystemHeatilator fireplace system consists of the following Optional Components IncludeSystem Components Fireplace ComponentsChimney Components AS8AS8 PRE-INSTALLATION Preparation Fireplace Locations and Space RequirementsMHC36 and MHR36 Installation Instructions Frame the Fireplace Framing the FireplaceChimney Requirements Sidewalls/SurroundsUsing Offsets and Returns Offset ChartChimney Height Requirements above roof line Number of Sections RequiredFireplace Installation Position the FireplacePlace the Protective Metal Hearth Strips Level the FireplaceInstall the Firestop Spacers Assemble Chimney SectionsSecure the Chimney System Double-check the Chimney AssemblyAttic Insulation Shield MH842 Ceiling/Roof Thimble See Figures 14Install the Outside Air Kit Termination CapComplete the Enclosure Gas Log/Lighter ProvisionsHearth Extension Field Constructed Hearth ExtensionPosition the Hearth Extension Finishing MaterialMantel Glass DoorsFlue Damper Operating InstructionsGeneral Information Outside Air Wood Fuel GrateFirescreen Draft Problems Starting a FireFlue Draft Maintenance Instructions Chimney CleaningDisposal of Ashes Creosote and SootIndex Limited Warranty Replacement Parts AdvantageHow to Obtain Service Heatilator Woodburning Fireplace