Desa (V)T32EN installation manual Installing Logs No and No

Page 21

Fireplace Installation

Continued

3.Place log #3 (crossover log) onto the rear and front logs. Make sure it is seated properly on the smooth surface on the front log and on the pin on the back log as shown in Figure 42.

4.Place log #4 (right log) on the pin on the right side of front log as shown in Figure 43.

5.Place log #5 (base log) onto the front left part of the grate making sure the notches fit over the prongs of the grate). See Figure 44.

6.Place log #6 (left log) onto two pins on the left side of back and front log. See Figure 44.

7.Place lava rock along sides and front of firebox bottom in areas that are visible only. It is not necessary to use all of the lava rock provided.

NOTICE: Do not put lava rock on burner or under burner. Placing lava rock on burner will cause performance problems.

8.Pull ember material apart into pieces no larger than a dime. Place these pieces loosely and sparingly directly onto the ex- posed section of the front burner and along the space between the burner and grate prongs (see Figure 45). This will create the glowing ember appearance as the flame touches the ember material. Do not block air slots by using too much ember material in one area. It is not necessary to use all of the ember material provided.

9.Close glass door, lock door latches, replace screen and close louvers (see steps 5 and 7 of Removing/Replacing Glass Door, page 19).

WARNING: The glass door must be securely in place before running this fireplace. Do not run this fireplace if glass is missing or broken.

3

Figure 42 - Installing Log No. 3

4

Figure 43 - Installing Log No. 4

6

5

Figure 44 - Installing Logs No. 5 and No. 6

Ember Material

Figure 45 - Placing Ember Material on Burner

108860-01D

www.desatech.com

21

Image 21
Contents What to do if YOU Smell GAS For Your SafetySafety Information Table of ContentsProduct Features Product IdentificationLocal Codes Pre-Installation Preparation Location and space requirementsClearances Framing and finishing Framing Clearances for Installation Against an Exterior WallTermination CAP AIR Supply Inlet GAS Meter Location of Termination CapInstallation Precautions Venting Installation InstructionsInstallation Planning Horizontal Termination InstallationVent Pipe Connections Installing Siding Standoff Square Termination Horizontal Termination ConfigurationsVenting with Two 90 Elbows Snorkel Termination InstallationOffset with Wall Strap and 45 Elbows Flat Ceiling InstallationVertical Venting Vertical Termination ConfigurationsHigh Altitude Installation Fireplace InstallationParts lists for venting kits and components Installing optional blower accessoriesBlower Model BK Model BKT InstallationInstalling Gas Piping to Fireplace Location Blower Wiring DiagramInstallation Items Needed Installation Items Needed Connecting Fireplace to GAS Supply Pressure Testing Fireplace Gas Connections Pressure Testing Gas Supply Piping System Checking GAS Connections Test Pressures In Excess Of 1/2 Psig 3.5 kPaUnplug fireplace. Let cool before installing brick liner Cleaning Glass DoorRemoving/Replacing Glass Door Removing Louver PanelsInstalling Log No Installing logs, lava rock and glowing embersInstalling Logs No and No Wiring Diagram Wall Switch InstallationOptional Remote control Installation model WRC Operating Fireplace For your safety read Before lightingLighting Instructions To Turn OFF GAS To AppliancePilot assembly Operating optional Blower accessoryInspecting Burners Burner Flame PatternGlass Door Cleaning MaintenancePilot and burners LogsTo clean pilot. This can damage pilot unit TroubleshootingTop above Gas leak. See Warning statement atService Hints Replacement PartsTechnical Service SpecificationsAccessories Illustrated Parts Breakdown VT32EPRB Parts List109 Parts List 23-5 23-3 23-4 23-2 23-1 VT36ENR 109 2917 KEY Description Keep this Warrant Warranty Information