INSTALLATION
Continued
3.Assemble trim kit. See Assembling Trim, page 11.
4.Place trim on the shoulder screws located on the side and top of the fireplace. Firmly snap the trim over the shoulder screws on fireplace (see Figure 14).
5.Place mantel base close to wall in desired fireplace location.
6.Install gas line. See Connecting To Gas Sup- ply, page 15
7.Carefully place fireplace on mantel base and center left to right. Check for gas leaks. See Checking Gas Connections, page 17.
8.Refer to instructions provided with the mantel for permanent attachment to wall.
9.Slide mantel around fireplace. Be careful not to damage wall or mantel.
10.Adjust assembly to remove any gaps. From back side of fireplace, attach two 2" wood screws through base mounting blocks at- tached to bottom sides of mantel into base (see instructions provided with mantel).
11.Attach remaining two 3" wood screws from hardware pack through openings inside of fireplace sides into the mantel. See Figure 13 for screw hole location.
Mantel
Screw
Location
Figure 13 - Removing Hood
Shoulder
Screws
Assembled
Trim
Figure 14 - Attaching Trim to Fireplace
INSTALLING BLOWER ASSEMBLY GA3450T
CAUTION: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and danger- ous operation.
CAUTION: Verify proper op- eration after servicing.
Note: If you are using a mantel with your heater, use the following instructions. If your heater is
1.Screen and hood should be removed from fireplace (see page 9). Remove log set and set aside.
2.Install snap bushings found in hardware kit into both holes in rear of blower control shield (see Figure 15).
3.Make sure the wire harness is firmly con- nected to the terminals on the blower bracket assembly.
4.Note the wire locations on back of AUTO/ OFF/ON switch. Carefully remove red wire from the AUTO terminal and blue wire from the ON terminal. Black wire can remain on the middle or OFF terminal (see Figure 16, page 13).
5.Carefully disconnect green and white wires from power cord harness at their insulated connectors.
6.In top of the heater cabinet, locate the four mounting holes on the outer casing. Align these four holes with those on the blower bracket assembly. Attach blower bracket as- sembly to the outer casing with 4 - #10 screws provided (see Figure 16, page 13).
7.Route the wire harness through the hole to the left side of heat deflector. Pull wire harness through lower opening to the left of the blower control shield. (see Figure 16, page 13).
Blower |
|
Control |
|
Shield | Snap |
| |
| Bushing |
Figure 15 - Installing Snap Bushings
12 | www.desatech.com |