Desa (V)T36EP, (V)T36EN Horizontal Termination Configurations, Ground Floor Installation

Page 10

10

VENTING INSTALLATION INSTRUCTIONS

Installation Planning (Cont.)

VENTING INSTALLATION

INSTRUCTIONS

Continued

GROUND FLOOR INSTALLATION

Recommended Applications:

Minimum Pipe

Overlap 11/4"

Direct Vent

Pipe

Wall

Firestop

Maintain 1"

Minimum Air

Space Around

Outer Pipe When

Penetrating a Wall

10" x 10" Framed Opening

Siding Standoff

Screws

High Wind

Termination

Apply Mastic to

Outside Edge of

Standoff

Exterior Wall with Vinyl Siding

Installation using cabinet surrounds

Through the wall using round or square termination (up to 12" horizontal pipe)

NOT FOR CORNER INSTALLATION

Adjustable

45° Elbow

 

 

 

 

Pipe 12" Max.

 

 

 

Horizontal High

 

 

 

Wind Square

 

 

 

Termination

 

 

 

Wall Firestop

 

 

 

 

Square Termination

 

 

Vertical (V)

Horizontal (H)

T32 Series

29" min.

17" max.

T36 Series

32" min.

17" max.

45° Elbow

 

Exterior Portion of Wall

 

 

Wall

Firestop (Round

 

 

Termination Only)

Figure 13 - Typical Horizontal Termination Cap Mounting with Additional Siding Standoff Installed

Horizontal Termination Configurations

Figures 14 through 18 show different configurations and alternatives for venting with horizontal termination. Each figure includes a chart with critical minimum and maximum dimensions which MUST be met. IMPORTANT: Remember that a horizontal run of venting must have a 1/4" rise for every 12" of run toward the termination.

WARNING: Never run vent downward as this may cause excessive temperatures which could cause a fire. Operation of improperly installed and main- tained venting system could result in serious injury, property damage or loss of life.

Firestop

Slide Ring

Round

Termination

Over Elbow to

Cap

Complete

 

Connection

 

Round Termination

(Kit HTK Shown)

Figure 14 - Horizontal Termination Configuration for Square and Round Terminations

For..com

108860-01C

Image 10
Contents For Your Safety For Your Safety What to do if YOU Smell GASTable of Contents Safety InformationLocal Codes Product IdentificationPRE-INSTALLATION Preparation Product FeaturesLocation and Space Requirements Clearances Framing and FinishingLocation of Termination CAP Balcony with Perpendicular Side WallInstallation Planning Venting Installation InstructionsInstallation Precautions Horizontal Termination InstallationVent Pipe Connections Installing Horizontal Vent Cap Horizontal Termination Configurations Ground Floor InstallationCorner and Alternate Installation Venting with Two 90 Elbows Installation for Vertical Termination Flat Ceiling InstallationVertical Termination Configurations High Altitude Installation Vertical VentingInstalling Optional Blower Accessories Fireplace InstallationParts Lists for Venting Kits and Components Check GAS TypeModel BKT Installation Blower Model BKBlower Wiring Diagram Blower Model BKTInstalling GAS Piping to Fireplace Location Installation Items NeededPressure Testing Gas Supply Piping System Connecting Fireplace to GAS SupplyInstallation Items Needed Checking GAS ConnectionsREMOVING/REPLACING Glass Door Pressure Testing Fireplace Gas ConnectionsCleaning Glass Door Removing Louver PanelsInstalling LOGS, Lava Rock and Glowing Embers Installing Rear Brick PanelInstalling Log No Wall Switch Installation Wiring DiagramOptional Remote Control Lighting Instructions For Your Safety Read Before LightingOperating Fireplace To Turn OFF GAS To ApplianceInspecting Burners Operating Optional Blower AccessoryPilot Assembly Burner Flame PatternPilot and Burners Cleaning MaintenanceGlass Door LogsTroubleshooting Observed Problem Possible Cause RemedyObserved Problem Possible Cause Technical Service Replacement PartsService Hints SpecificationsAccessories Illustrated Parts Breakdown Parts List Parts Available not ShownBurner Assembly KEY Part Number Description QTY VT36EPB VT36EPR VT36EPRB For more Visit www Com VT36ENR, VT36ENRB VT36EPR, VT36EPRBKEY Part Number Description QTY Warranty Information