Desa ICBO# 3507 installation manual Chase installations, Installing Flashing on a Metal Roof

Page 10

Venting Installation

Continued

Storm

Overlap

Collar

Shingles Top

Flashing

and Sides Only

Cone

 

Nail Only

 

Outer

 

Perimeter

 

of Flashing

 

Underlap

Shingles

at Bottom

Figure 13 - Flashing Installation

Installing Flashing on a Metal Roof

When installing the flashing on a metal roof, it is required that putty tape be used between the flash- ing and the roof. The flashing must be secured to the roof using #8 x 3/4" screws and then sealed with roof coating to prevent leakage through the screw holes. A roof coating must also be applied around the perimeter of the flashing to provide a proper seal.

Storm Collar Installation (SC2-1)

Place storm collar over pipe and slide down until it is snug against the open edge of the flashing (see Figure 14). Apply waterproof caulk around the perimeter of the collar to provide a proper seal.

Chimney

Waterproof

Pipe

Caulk

Storm

Flashing

Collar

CAUTION: Do not seal open- ings on the rooftop flashing. Fol- low the installation instructions provided with the termination being used.

 

RTL-10D

Stainless

Level of

Inner Flue

Flue Gas

Pipe

Outlet

 

Secure

 

Termination

Waterproof

to Outer

Pipe with 3

Caulking

Screws

Storm

 

Collar

 

Flashing

Overlap

Underlap

Shingles (Top and Sides

Shingles

of Flashing Base)

 

Figure 15 - Termination

Chase installations

Instructions for chase installations are included with the chase style termination chosen. In a multiple chase installation, be sure to provide adequate distance between terminations to prevent smoke spillage from one termination to another. We suggest that terminations be separated at least 24" center to center and stacked at a vertical height difference of 18" (see Figure 16, page 11).

Note: If a decorative shroud is to be installed, contact the manufacturer for specifications.

Figure 14 - Storm Collar

Terminations/Spark Arrestor

The fireplace system must be terminated with the listed round top or chase terminations. In any case, refer to the installation instructions supplied with the termination.

18"

Min.

Typ.

24" Min.

24" Min.

Figure 16 - Multiple Chase Installation

10

www.desatech.com

109493-01K

Image 10
Contents Save this Book Table of Contents Safety InformationSpecifications ModelsRound TOP Termination Minimum clearance to combustibles Fireplace InstallationSelecting location FramingHearth Extension MantelsOptional Outside air Kit Model ak4/ak4f Venting InstallationAssembly and installation of double wall chimney system Chimney PipeUsing Elbow offsets 30E-12DM Elbow SET onlyFirestop Spacers FS-10 Flashing installation v6f-10dm or v12f-10dmPenetrating the roof Chase installations Installing Flashing on a Metal RoofFoot rule Optional Gas Line InstallationFinishing the fireplace Glass Door Installation Installing Door FramesDoor Adjustment Operation Maintenance GuidelinesInstalling glass doors Glass DoorsTechnical Service Outside air and damper handle operationHerringbone Brick Liner Replacement PartsEmber Protector EP-36 Ash Box StandarD Brick Liner Double Wall Pipe 12-12DM AccessoriesBi-Fold Glass Door Offset and Return

ICBO# 3507 specifications

Desa ICBO# 3507 represents a significant milestone in the development of integrated community-based organizations focused on social sustainability and technological empowerment. This community is designed to enhance the quality of life for its residents through innovative technological solutions, seamless connectivity, and a strong emphasis on eco-friendliness.

One of the main features of Desa ICBO# 3507 is its commitment to renewable energy. The community is powered predominantly by solar energy, with rooftop panels installed on most residential and communal buildings. This reduces dependence on traditional energy sources and lowers utility costs for residents. Additionally, energy storage systems are integrated, allowing for efficient energy management and continuous power supply even during peak demand times.

Another key characteristic of Desa ICBO# 3507 is its advanced communication technology infrastructure. The development features high-speed internet access, ensuring that residents remain connected and can effectively work, study, and engage in online activities. Integrated smart home technologies are employed to improve security and energy efficiency, with automated systems for lighting, temperature control, and security monitoring that can be managed remotely.

Sustainable transportation options are also a defining aspect of this community. Desa ICBO# 3507 includes extensive cycling and pedestrian pathways that encourage environmentally friendly travel. Electric vehicle charging stations are strategically placed throughout the area, supporting residents who opt for electric vehicles and contributing to the reduction of carbon emissions.

In terms of social structures, Desa ICBO# 3507 embraces a community-driven approach to governance and decision-making. Regular town hall meetings and digital platforms facilitate active participation from residents in shaping the community’s direction. This participatory governance model fosters a sense of belonging and empowerment among residents, ensuring their voices are heard and valued.

Additionally, green spaces and community gardens are intricately woven into the landscape of Desa ICBO# 3507, promoting biodiversity and providing the community with opportunities for relaxation and social interaction. This emphasis on nature contributes to residents' overall well-being and creates a vibrant atmosphere.

In summary, Desa ICBO# 3507 is a forward-thinking community that integrates cutting-edge technologies and sustainable practices. Its features, including renewable energy, smart home solutions, efficient transportation, and active resident engagement, combine to create a unique living environment that prioritizes both innovation and community.