Teledyne 300 Installation and overview, SEE .4 FOR REAR PANEL PNEUMATIC, Connections. Sample Gas Should Only Come

FAQ

What standard equipment is shipped with the Model 300?

The Model 300 is shipped with a power cord and instruction manual.

How much clearance is required for proper ventilation during installation?

A minimum of 4 inches (100mm) of clearance at the back of the instrument and 1 inch (25mm) of clearance on each side is required. Additionally, the clearance below the chassis should be unobstructed by at least the height of the instrument feet.

What should be used for leak checking the fittings on the rear panel?

A soap solution should be used for leak checking all fittings, with a maximum pressure of 5 PSI.