Desa V36EP-A SERIES, V36EN-A SERIES, VV36EPB(1) SERIES, VV36ENB(1) SERIES Clearances

Page 5

PRE-INSTALLATION PREPARATION

Clearances

Framing and Finishing

5

PRE-INSTALLATION

PREPARATION

Continued

CLEARANCES

Minimum clearances to combustibles for the fireplace are as follows:

Back, and sides

0"/mm

Perpendicular walls

6" (152mm)

Floor

0"/mm

Ceiling to louver opening

42" (1067mm)

Front

36" (914mm)

Top

0"/mm

Vent

(See venting instructions for

 

specific venting clearances.)

Combustible material with a maximum thickness of 5/8" may be

15"B

35A3/4"

E

10D 3/8"

C

5

 

49

/8"

133/4"

F41"

41G 1/4"

 

Nailing Tabs

 

68H 1/2"

flush with the top front of fireplace .

NOTICE: This fireplace is intended for use as supple- mental heat. Use this fireplace along with your pri- mary heating system. Do not install this fireplace as your primary heat source. If you have a central heat- ing system, you may run system’s circulating blower while using fireplace. This will help circulate the heat throughout the house. In the event of a power outage, you can use this fireplace as a heat source.

FRAMING AND FINISHING

Figure 4 shows typical framing of this fireplace. Figure 5 shows framing for corner installation. All minimum clearances must be met.

For available accessories for this fireplace, see Accessories on page

37.If you are using a separate combustible mantel piece, refer to Figure 6 for proper installation height. You can install noncombus- tible mantels at any height above the fireplace. Note: Noncombus- tible mantels may discolor!

361/8"

411/4"

231/2"

Figure 5 - Framing Clearances for Corner Installation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

Wall

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C

 

 

 

 

 

 

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Top of Louver Opening

 

 

 

 

 

 

 

Ref.

Mantel Depth

Ref.

Mantel from Top

 

 

 

 

 

 

 

 

 

 

 

 

of Louver Opening

 

 

 

1

14" (356mm)

 

A

 

 

 

16" (406mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

12" (305mm)

 

B

 

 

 

14" (356mm)

 

 

 

3

10" (254mm)

 

C

 

 

 

12" (305mm)

 

 

 

4

8" (203mm)

 

D

 

 

 

10" (254mm)

 

 

 

5

6" (152mm)

 

E

 

 

 

8" (203mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

4" (101mm)

 

F

 

 

 

6" (152mm)

 

 

 

7

2" (51mm)

 

G

 

 

 

4" (101mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 6 - Clearances for Combustible Mantels

Figure 4 - Framing Clearances for Installation Against an Exterior

Wall

For morevisit www..com

111253-01C

Image 5 Contents
For Your Safety What to do if YOU Smell GAS OWNER’S Operation Installation ManualFor Your Safety Safety Information Table of ContentsLocal Codes Product IdentificationLocation and Space Requirements Product FeaturesPRE-INSTALLATION Preparation Framing and Finishing ClearancesBalcony with Perpendicular Side Wall Location of Termination CAPInstallation Precautions Venting Installation InstructionsHorizontal Termination Installation Installation PlanningInstalling Siding Standoff Combustible Exterior Ground Floor Installation Horizontal Termination ConfigurationsCorner Installation Venting with Two 90 Elbows Flat Ceiling Installation Installation for Vertical TerminationVertical Termination Configurations Desa 5/8 Pipe & Vent Kits High Altitude InstallationParts Lists for Venting Kits and Components Installing Optional Blower Accessory Fireplace InstallationModel BK Installation Check GAS TypeAttaching Speed Control to Firebox Model BKT InstallationInstallation Items Needed Installing GAS Piping to Fireplace LocationBlower Wiring Diagram Gas Connection Connecting Fireplace to GAS SupplyChecking GAS Connections Pressure Testing Gas Supply Piping SystemPressure Testing Fireplace Gas Connections REMOVING/REPLACING Glass Door Cleaning Glass DoorRemoving Louver Panels Removing Glass DoorInstalling Rear Brick Panel Installing LOGS, Lava Rock and Glowing EmbersInstalling Log No Installing Log No Optional Remote Control Wiring DiagramWall Switch Installation Operating Fireplace For Your Safety Read Before LightingLighting Instructions To Turn OFF GAS To AppliancePilot Assembly Operating Optional Blower AccessoryInspecting Burners Burner Flame PatternGlass Door Cleaning MaintenancePilot and Burners LogsObserved Problem Possible Cause Remedy TroubleshootingGas leak. See Warning statement at Models Illustrated Parts BreakdownVV36EPSB1 VV36EPHB1 Description QTY Parts ListBurner Assembly for Models KEY Part Number Description QTY Service Hints Replacement PartsTechnical Service SpecificationsOwners Registration Form Postage Required Accessories Warranty Information