
INSTALLATION
Leg and Bottom Shield Assembly
The instructions below apply to the steel leg, painted cast leg and the gold plated cast leg. It will be easier to attach the legs to the stove if the stove is tipped on its back (preferably on a soft surface to prevent scratching). Ensure to be extremely careful when tipping stove.
1)Remove the 4 bolts from underside of the base of the pedestal and discard. Also remove cover plate and put to the side.
2)Line up the heat shield with the bottom of the unit.
3)Startthreadingtheboltandwasher(supplied with the bottom shield) for about 1/4 of the way through the leg with the washers being underneath the legs. Ensure that the legs are properly aligned with heat shield and tighten the bolts.
4)Level the stove by adjusting the levelling bolts in the bottom of each leg.
5)Reinstall cover plate.
6)Install logo plate onto heat shield by placing in 2 holes as shown in diagram.
If you are installing outside combustion air, bend the tabs out 90 degrees. Pipe fresh air into the bottom shield by using a minimum 4" duct pipe with a mesh grill at the outside termination. At- tach the pipe to the 2 tabs with screws.
STEP-BY-STEP
CHIMNEY AND
CONNECTOR
INSTALLATION:
Note: These are a generic set of chimney in- stallation instructions. Always follow the manufacturers own instructions explicitly. Check Table 1 on page 13 for the Minimum Recommended Flue Heights.
1)With your location already established, cut and frame the roof hole. It is recommended that no ceiling support member be cut for chimney and support box installation. If it is necessary to cut them, the members must be made structurally sound.
2)Install radiant shield and support from above.
3)Stack the insulated pipe onto your fi nish support to a minimum height of 3 feet (.9m) above the roof penetration, or 2 feet (.6m) above any point within 10 feet (3m) meas- ured horizontally. There must be at least 3 feet (.9m) of chimney above the roof level.
Note: Increasing the chimney height above this minimum level will sometimes help your unit to “breathe” better by allowing a greater draft to be created. This greater draft can de- crease problems such as, difficult
4)Slide the roof fl ashing over your chimney and seal the fl ashing to the roof with roofi ng compound. Secure the fl ashing to your roof with nails or screws.
5)Place the storm collar over the fl ashing, sealing the joints with a silicone caulking.
6)Fasten the raincap with spark screens (if required) to the top of your chimney.
7)For optimum effi ciency when installing into a masonry chimney, size accordingly, i.e. the 6" (152mm) fl ue dia. is 28.28 sq.in.
8)Tocompleteyourchimneyinstallation,install the double wall connector pipe from the stove’s fl ue collar to the chimney support device.
9)If you are using a horizontal connector, the chimney connector should be as high as possible while still maintaining the 18" (457mm) minimum distance from the hori- zontal connector to the ceiling.
10)NOTE: Residential Close Clearance and Alcove installations require a listed dou- ble wall connector from the stove collar to the ceiling level.
The diagrams below illustrate one way to in- stall your unit into a standard ceiling or with a horizontal connector. Check with your dealer or installer for information on other options available to you.
Standard Ceiling Installation
Horizontal Installation
10 | Regency Freestanding Woodstove |