1e Prepare boiler location — air openings

Combustion air opening location and sizing requirements depend on the clearances around

the boiler. Check the boiler placement compared to

Figure 1, page 7.

If all clearances are at least equal to Figure 1, page 7, apply the sizing and placement of openings given on pages 10 and 11.

If ANY clearance is less than Figure 1, page 7, you must provide air openings sized and located as shown in Figure 2, page 7. DO NOT apply the sizing and location information shown on page 10 or 11. The Figure 2 air openings are required even if the boiler is direct vented (outside air piped to the boiler air intake as described in this manual). These openings ensure adequate air circulation around the boiler for cooling, even if the boiler does not use inside air for combustion.

Combustion air options

Using inside air — direct exhaust vent

The CGs boiler can use inside air if no contaminants are present in the boiler space. If contaminants are likely to be present, install the CGs boiler as a direct vent appliance, using the appropriate vent supplement and the instructions in this manual.

Using outside air — direct vent

Combustion air can be ducted directly from outside to the CGs boiler air intake fitting. This method is defined as direct vent (also referred to as sealed combustion). Refer to the appropriate vent supplement and the instructions in this manual. Two options are available: sidewall or vertical direct vent. Each requires a special vent component kit.

Sizing air openings

Air openings provide for ventilation (as well as combustion air) to prevent overheating of the boiler controls and boiler space. Air is also needed for other appliances located in the same space.

Use Figure 3, page 11, selecting the appropriate installation conditions. Note that the sizing given in Figure 3 applies only to CGs installations with clearances no smaller than shown in Figure 1, page 7 of this manual. For smaller clearances, regardless of how the air openings are arranged, two openings providing free area of 1 square inch per 1,000 Btuh input of all appliances in the space are required.

Air openings must be sized to handle all appliances and air movers (exhaust fans, etc.) using the air supply.

The sizing given in Figure 3 is based on the National Fuel Gas Code, ANSI Z223.1, allowing adequate air opening for gravity-vented gas appliances (Category I). The CGs boiler is rated Category III or IV (pressurized vent), and has different requirements for combustion and ventilation air, reflected by the special sizing instructions given in Figure 3. The air openings recom-

mended in Figure 3 will allow adequate ventilation and combustion air provided the boiler room is not sub- jected to negative pressure due to exhaust fans or other mechanical ventilation devices. Refer to the National Fuel Gas Code for dealing with other conditions.

Louver allowance

The free area of openings means the area after reduc- tion for any installed louvers or grilles. Be sure to consider this reduction when sizing the air openings.

Special considerations

Tight construction

ANSI Z223.1 defines unusually tight construction where:

1.Walls and ceilings exposed to the outside atmo- sphere have a continuous water vapor retarder with a rating of 1 perm or less with openings gasketed, and . . .

2.Weather-stripping has been added on openable windows and doors, and . . .

3.Caulking or sealants are applied to areas such as joints around windows and door frames, between sole plates and floors, between wall-ceiling joints, between wall panels, at penetrations for plumbing, electrical, and gas lines, and in other openings.

For buildings with such construction, provide air open- ings into the building from outside, sized per the ap- propriate case in Figure 3 if appliances are to use inside air for combustion and ventilation.

Exhaust fans and air movers

The appliance space must never be under a negative pressure unless all appliances are installed as direct vent. Always provide air openings sized not only to the dimen- sions required for the firing rate of all appliances, but also to handle the air movement rate of the exhaust fans or air movers using air from the building or space.

Motorized air dampers

If the air openings are fitted with motorized dampers, electrically interlock the damper to:

Prevent the boiler from firing if the damper is not fully open.

Shut the boiler down should the damper close dur- ing boiler operation.

To accomplish this interlock, wire an isolated contact (proving the damper open) in series with the thermo- stat input to the boiler. The boiler will not start if this contact is open, and will shut down should it open during operation.

10

Part number 550-110-260/0508

Image 10
Contents Gold CGs How it works Gold CGs Gas-Fired Induced-Draft Water Boiler Contents Please read before proceeding InstallerUser Installations must follow these codes 1a Prepare boiler location codes & checklistBefore locating the boiler, check the following 1b Prepare boiler location clearances CGs special vent system When removing boiler from an existing common vent system1c Prepare boiler location vent system Vent system1d Prepare boiler location contamination Products to avoidSizing air openings 1e Prepare boiler location air openingsCombustion air options Special considerationsSizing air openings for CGs installations Place boiler/crate near position 2a Prepare boiler placement & setupOrifice replacement procedure Inspect orifices and burnersDrain and remove fittings 2b Prepare boiler pressure testHydrostatic pressure test Prepare boiler for test3a Water piping general information 3b Water piping single-zone system 3c Water piping multiple zones Piping multiple zones3c Water piping multiple zones 3d Piping low temp systems Temperature gaugesValve adjustment Figures 8 and 9 only Primary/secondary preferred bypass piping method3d Piping low temp systems Valve adjustment BOILER-bypass piping methodFigures 8 SYSTEM-bypass piping method Prevent chilled water from entering 3e Water piping refrigeration systemsBoiler Venting and combustion air Use direct vent sealed combustion if combustion airNatural Gas Connecting gas supply piping to boilerGas piping Propane GasWiring connections Field wiringElectrical installation must comply with ThermostatCheck for gas leaks Freeze protection when used7a Start-up preparation Verify water chemistryFinal check before starting boiler 7b Start-up operate boilerInspect system water piping Inspect base insulation Start the boilerCheck for 7c Start-up if boiler doesn’t startCheck burner flames Pilot burner flame FigureCheck-out procedure checklist Installation and service certificate9a Operation sequence 9b Operation wiring diagrams Schematic wiring diagramLadder wiring diagram 9c Operating instructions CGs-3 to CGs-6 9c Operating instructions CGs-3 to CGs-6 9c Operating instructions CGs-3 to CGi-6 10a Service and maintenance schedule Verify Proper Operation After Servicing10b Service & maintenance annual start-up Inducer motor Condensate drain system Burners, base and inlet air boxOiled-bearing circulators 10b Service & maint. annual start-up Boiler relief valve Relief valve, typicalCleaning boiler heating surfaces Review with ownerBefore troubleshooting 11a Troubleshooting procedureCheck the following Check pressure switch setting 11b Troubleshooting air pressure switchAir pressure switch Troubleshooting air pressure readingControl indicator lights NON-LOCKOUT modes 11c Troubleshooting control moduleControl indicator lights Lockout modes Troubleshooting the control moduleControl module connections 11d Troubleshooting control module lights Chart 1 Troubleshooting Power light statusChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Item 8 , Does blower motor operate? Verify Sequence of operation, , 12a Replacement parts Section assembly Base Jacket Trim Controls12b Replacement parts section assembly Item number Description Weil-McLain part numberPage 12c Replacement parts base Description Weil-McLain Part number12d Replacement parts jacket Jacket assemblyBoiler Model Weil-McLain part number 12e Replacement parts trim Part number12f Replacement parts controls Propane gas components13a Dimensions Dimensional drawing13b Ratings DOEHandling ceramic fiber and fiberglass materials Removal of Combustion Chamber Lining or Base Panels

550-110-260/0508 specifications

Weil-McLain is a well-known name in the heating industry, offering a wide range of high-quality boilers and heating systems. Among its impressive lineup, the Weil-McLain 550-110-260/0508 model stands out for its performance, efficiency, and advanced technologies, making it suitable for residential and commercial heating applications.

The 550-110-260/0508 boiler is designed for flexibility and performance, providing an output capacity of 110,000 BTU per hour. This makes it suitable for various heating needs, from single family homes to larger commercial spaces. One of the key features of this model is its high-efficiency design, which allows it to operate at an AFUE (Annual Fuel Utilization Efficiency) rating of up to 95%. This means that a significant portion of the fuel consumed is converted into usable heat, resulting in lower energy bills and reduced environmental impact.

A standout characteristic of the Weil-McLain 550-110-260/0508 is its durable construction. Built with high-quality materials, this boiler is designed to withstand the rigors of daily use and provide reliable service over the years. Additionally, the unit features a compact design, allowing for easy installation in various configurations, whether it be in a basement, utility room, or outdoor setting.

Another impressive technology incorporated in this model is the advanced control system, which allows for precise temperature management and improved energy efficiency. The intuitive control interface enables homeowners and facility managers to easily set and adjust heating schedules, ensuring optimal comfort while minimizing energy consumption.

Safety is also a top priority for Weil-McLain. The 550-110-260/0508 is equipped with multiple safety features, including a pressure relief valve, limit controls, and a low water cutoff, which help to ensure safe and reliable operation.

In conclusion, the Weil-McLain 550-110-260/0508 model boasts a combination of efficient heating, durable construction, advanced control technology, and safety features, making it an excellent choice for those seeking a reliable and effective heating solution. Its versatility and performance make it well-suited for a variety of applications in both residential and commercial settings.