Weil-McLain 550-110-260/0508 manual Verify Sequence of operation

Page 53

GOLD CGs Gas-Fired Water Boiler — Boiler Manual

11d Troubleshooting — control module lights (cont.)

CHART 7 — Insufficient heat or no heat to system (POWER light on steady)

Electrical shock hazard — Wherever you see TURN OFF POWER , follow the instructions. Failure to follow instructions could result in severe personal injury, death or substantial property damage.

• Has it been at least 5 minutes since setting thermostat to call for heat? If not, wait 5 minutes. Is system heating?

• Is thermostat set to call for heat? Remove thermostat wires at boiler and check continuity across the two wires. If circuit isn't closed, check external thermostat (zone valve, relay, etc.) wiring. Correct problems and retry.

• Reconnect external thermostat wiring at boiler.

Is thermostat circuit closed (continuity across wires)?

No

 

Yes

Is boiler System circulator operating?

No

Yes

Remove CIRCULATOR harness plug from CIRCULATOR plug receptacle (Figure 25, Item 7, page 46). Check with voltmeter across pins of control module receptacle.

Does voltmeter show 120 VAC across pins?

No

Yes

Are all red lights off?

No

Yes

 

 

 

Wait 30 seconds. Are all red lights off?

No

Yes

 

 

 

Replace control module. Retest.

Boiler is in standby.

Set thermostat to call for heat and recheck

operation.

Verify Sequence of operation, Figure 18, page 31.

Replace control

 

Repair/replace

 

module.

 

 

circulator. Retest.

Retest.

 

Repair/replace

 

 

 

 

wiring. Retest.

 

 

 

 

 

 

 

 

 

• Wait 5 minutes.

 

Is FLAME light on?

Yes

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

If you have sufficient heat — boiler should be in normal operating sequence. (See normal sequence of operation, Figure 18, page 31.)

If you have less than sufficient heat —

 

Is LIMIT light on?

No

Yes

Is vent or combustion air piping free of blockage?

No

 

Yes

 

 

 

 

 

 

 

 

 

 

• Correct conditions and

 

Contact your Weil-McLain

recheck operation.

 

sales representative.

See Figure 18, page 31 for normal sequence of operation.

Wait for boiler water to cool to temperature 20 to 30 °F

lower than temperature set on limit switch.

Check limit switch contacts with continuity checker.

Are limit switch contacts

closed?

 

No

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

Replace control module.

Retest.

Check rollout switch continuity — is switch closed?

No

 

 

Yes

 

 

 

 

 

Are limit switch contacts closed?

 

No

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Boiler water temperature exceeded

 

 

 

 

setting on limit switch with thermostat

 

 

 

 

Replace

 

calling for heat. Boiler is OK. (See normal

 

sequence of operation, Figure 18, p. 31.)

 

limit switch.

 

 

 

• Also check setting on limit switch (should

Retest.

 

 

be above 140°F.).

 

 

 

 

• Replace rollout switch.

If rollout thermal fuse element has opened, determine cause and correct condition. Failure to do so will cause severe personal injury, death or substantial property damage.

Check any other limit controls wired into the limit circuit. If all are OK, then replace control module.

Retest.

Part number 550-110-260/0508

53

Image 53
Contents Gold CGs How it works Gold CGs Gas-Fired Induced-Draft Water Boiler Contents User InstallerPlease read before proceeding Before locating the boiler, check the following 1a Prepare boiler location codes & checklistInstallations must follow these codes 1b Prepare boiler location clearances 1c Prepare boiler location vent system When removing boiler from an existing common vent systemCGs special vent system Vent systemProducts to avoid 1d Prepare boiler location contaminationCombustion air options 1e Prepare boiler location air openingsSizing air openings Special considerationsSizing air openings for CGs installations Orifice replacement procedure 2a Prepare boiler placement & setupPlace boiler/crate near position Inspect orifices and burnersHydrostatic pressure test 2b Prepare boiler pressure testDrain and remove fittings Prepare boiler for test3a Water piping general information 3b Water piping single-zone system Piping multiple zones 3c Water piping multiple zones3c Water piping multiple zones Valve adjustment Figures 8 and 9 only Temperature gauges3d Piping low temp systems Primary/secondary preferred bypass piping method3d Piping low temp systems BOILER-bypass piping method Valve adjustmentFigures 8 SYSTEM-bypass piping method Boiler 3e Water piping refrigeration systemsPrevent chilled water from entering Use direct vent sealed combustion if combustion air Venting and combustion airGas piping Connecting gas supply piping to boilerNatural Gas Propane GasElectrical installation must comply with Field wiringWiring connections Thermostat7a Start-up preparation Freeze protection when usedCheck for gas leaks Verify water chemistryInspect system water piping Inspect base insulation 7b Start-up operate boilerFinal check before starting boiler Start the boilerCheck burner flames 7c Start-up if boiler doesn’t startCheck for Pilot burner flame FigureInstallation and service certificate Check-out procedure checklist9a Operation sequence Schematic wiring diagram 9b Operation wiring diagramsLadder wiring diagram 9c Operating instructions CGs-3 to CGs-6 9c Operating instructions CGs-3 to CGs-6 9c Operating instructions CGs-3 to CGi-6 Verify Proper Operation After Servicing 10a Service and maintenance schedule10b Service & maintenance annual start-up Oiled-bearing circulators Condensate drain system Burners, base and inlet air boxInducer motor 10b Service & maint. annual start-up Relief valve, typical Boiler relief valveReview with owner Cleaning boiler heating surfacesCheck the following 11a Troubleshooting procedureBefore troubleshooting Air pressure switch 11b Troubleshooting air pressure switchCheck pressure switch setting Troubleshooting air pressure readingControl indicator lights Lockout modes 11c Troubleshooting control moduleControl indicator lights NON-LOCKOUT modes Troubleshooting the control moduleControl module connections Chart 1 Troubleshooting Power light status 11d Troubleshooting control module lightsChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Item 8 , Does blower motor operate? Verify Sequence of operation, , Section assembly Base Jacket Trim Controls 12a Replacement partsItem number Description Weil-McLain part number 12b Replacement parts section assemblyPage Description Weil-McLain Part number 12c Replacement parts baseJacket assembly 12d Replacement parts jacketBoiler Model Weil-McLain part number Part number 12e Replacement parts trimPropane gas components 12f Replacement parts controlsDimensional drawing 13a DimensionsDOE 13b RatingsRemoval of Combustion Chamber Lining or Base Panels Handling ceramic fiber and fiberglass materials

550-110-260/0508 specifications

Weil-McLain is a well-known name in the heating industry, offering a wide range of high-quality boilers and heating systems. Among its impressive lineup, the Weil-McLain 550-110-260/0508 model stands out for its performance, efficiency, and advanced technologies, making it suitable for residential and commercial heating applications.

The 550-110-260/0508 boiler is designed for flexibility and performance, providing an output capacity of 110,000 BTU per hour. This makes it suitable for various heating needs, from single family homes to larger commercial spaces. One of the key features of this model is its high-efficiency design, which allows it to operate at an AFUE (Annual Fuel Utilization Efficiency) rating of up to 95%. This means that a significant portion of the fuel consumed is converted into usable heat, resulting in lower energy bills and reduced environmental impact.

A standout characteristic of the Weil-McLain 550-110-260/0508 is its durable construction. Built with high-quality materials, this boiler is designed to withstand the rigors of daily use and provide reliable service over the years. Additionally, the unit features a compact design, allowing for easy installation in various configurations, whether it be in a basement, utility room, or outdoor setting.

Another impressive technology incorporated in this model is the advanced control system, which allows for precise temperature management and improved energy efficiency. The intuitive control interface enables homeowners and facility managers to easily set and adjust heating schedules, ensuring optimal comfort while minimizing energy consumption.

Safety is also a top priority for Weil-McLain. The 550-110-260/0508 is equipped with multiple safety features, including a pressure relief valve, limit controls, and a low water cutoff, which help to ensure safe and reliable operation.

In conclusion, the Weil-McLain 550-110-260/0508 model boasts a combination of efficient heating, durable construction, advanced control technology, and safety features, making it an excellent choice for those seeking a reliable and effective heating solution. Its versatility and performance make it well-suited for a variety of applications in both residential and commercial settings.