VACATION TEMPERATURE HOLD:

Press HOLD. Adjust temperature as desired with UP/DOWN. Temperature setting will not change even after next program period begins. To clear, press HOLD again.

SECTION 4

(PUMP RELAY BOX)

For use with the Mermaid Standard 24v Controls.

The Mermaid FX-1 Thermostat requires a different pump relay box. Contact the Mermaid factory for details. The instuctions for the FX-1 Thermostat Relay Box will be included upon the purchase of this product.

A. INTRODUCTION:

1.When two air conditioners are to be cooled using a single water pump, a relay switching box must be used to interface the air conditioners to the pump. Only one air conditioner can be allowed to apply power to the pump at any given time to preclude a doubling of power on the pump. The relay switching box will recognize the first air unit providing power to the pump. Whenever the pump is running, both units will receive water even if the second unit is not in operation. When the second air unit becomes operational the relay switching box will isolate this unit from the pump so double power is not applied, however, if the first air unit reaches temperature and shuts down, the relay switching box will automatically turn control of the pump operation over to the second unit allowing normal operation to continue. The second air unit will maintain control of the pump until it reaches temperature and cycles off, even if the first unit cycles back on while the second unit is operating.

2.A separate 5 amp circuit breaker will be required to be installed in the Main Circuit Breaker Panel to provide 115 (or 220) vac power to the Pump Relay Box.

B. INSTALLATION:

1.Before proceeding further, put the air conditioner(s) circuit breakers in their "OFF" positions and disconnect all AC power from the boat.

WARNING

FAILURE TO DISABLE ALL AC POWER TO THE BOAT COULD RESULT IN

ELECTRICAL SHOCK CAUSING SERIOUS INJURY OR DEATH.

2.Install a 5 amp circuit breaker in the Main Circuit Breaker Panel using 16 gauge boat power cable. Route this cable to the Pump Relay Box which must be mounted in a dry non-explosive environment adjacent to the pump. Before cutting the cable, leave a

Image 24
Contents Mermaid Marine AIR Conditioning Table of Contents Installation and Operation OverviewAIR Conditioner Installation Installing the Air Conditioner Unit AIR Conditioner Dimensions Unit BTU Width Length HeightCooling water in and out WaterPage Page Water Strainer Pump Water Out Electrical Power Air Ducting and Splitting Return Air Return AIR RequirementsModel BTU SQ. Inches of Return High Pressure Switch Access Condensation RemovalPage Putting it all together Making contact with the hullSee Warning below Wire Connections Power System OperationPriming The Pump Checking Out The System Setting the Current DAY and Time IntroductionPage Temperature Override and Temperature Hold Temporary Temperature OverrideNormal Operation Programming the ThermostatVacation Temperature Hold InstallationPage Maintenance Water SystemAir System Electrical System WinterizationAir Conditioning Unit and Water Pump Theory of Operation and Trouble Shooting Clean AIR ACT Amendments of 1990 Title VI C-1Theory of Operation General Heating Options ElectricalTrouble Shooting Cooling WaterStandard 24v Thermostat In Cool Position No Operation Page Compressor Runs Fan Does Not No Water OutEvaporator Freezing Condensation Pan OverflowsHigh Pressure Switch Activates In Cooling Mode High Pressure Switch Activates In Heating ModeNo Heat Electric Heat Unit Fan Runs No Heat Reverse Cycle Unit Compressor And Fan RunOUR Normal Procedure for a Warranty Issue is AS Follows