INSTALLATION REQUIREMENTS

FLOOR PROTECTION

The American Harvest Multifuel Stove may be installed on a combustible floor, with proper floor protection, or on a masonry hearth. The hearth or non-combustible floor protector must extend a minimum of (6) inches (152mm)in front and (6) inches (152mm) from each side of the ash removal door.

CLEARANCES TO COMBUSTIBLES

The stove must be installed with the following minimum clearances to side and back wall combustible materials. NOTE: These are minimum clearances to combustible walls established by the testing lab. The amount of room needed on the left side of the unit to access the electrical panel is (6) six inches (152mm).

PARALLEL - A -

Left Sidewall to Top Edge of Unit

6 in./152mm

B -

Sidewall to Flue

6 in./152mm

C -

Backwall to Flue

3 in./75mm

D -

Backwall to Unit

9 in./228mm

E -

Right Sidewall to Top Edge of Unit

2 in./50mm

CORNER - F -

Adjacent Wall to Flue

3 in./75mm

G -

Adjacent Wall to Unit

4 in./100mm

BACK WALL

SIDE WALL

BACK WALL

SIDE WALL

Alcove / Backwall / Sidewall

 

Parallel / Alcove Installation

Corner Installation

USSC

5

Image 5
Contents 6033 Congratulations SpecificationsBurning Solid Fuels Safety StepsBurning Solid Fuels Clearances to Combustibles Installation RequirementsGuidelines for Exhaust Venting Systems Design Clearances to CombustiblesGuidelines for Exhaust Venting Systems Design Design Guidelines for Outside Combustion AIR Connection Mobile Home Installation Requirements Installation ConfigurationsALCOVE-THROUGH the Wall Installation Requirements Alcove Installation RequirementsCorner Installation Outside Wall TerminationHorizontal Exhaust Termination Freestanding Stove Installation RequirementsInside Vertical Pipe with Roof Termination Ussc Removal of Broken or Damaged Ceramic Glass Glass MAINTENANCE, Removal and ReplacementCleaning the Glass Stove Controls Damper Control Function Lighting InstructionsDisposal of Ashes Disposal of AshesCircuit Board Functions Soot and Flyash Formation and Need for Removal Setting the DraftMaintenance Instructions Spring Cleaning Maintenance InstructionsRear View Side View Automatic Safety FeaturesHopper Auger Safety Switch Location Fuel Additive Thermostat InstallationUnplug stove before preforming any maintenance work Trouble ShootingTrouble Shooting Opening with latex or an inexpensive Wiring Diagram Repair Repair Parts LIST-6033 HOW to Order Repair Parts