QHT B3-B9 installation instructions Intake Venting

Page 13

6.Intake Venting

1.Be certain adequate air is available for combustion and ventilation.

a.) Boiler located in unconfined space:

Installation in large areas, such as basements, can usually be assumed to provide sufficient air.

b.) Boiler located in confined space : (See Figure A.)

If all air for combustion and ventilation is to come from within the building:

Two (2) openings shall be provided with one (1) opening commencing within 12 inches of the ceiling and one (1) opening commencing within 12 inches of the floor of the enclosure. These openings shall not be located closer than 3 inches from either the top or bottom of the enclosure and shall be open to areas connecting freely with the outdoors. The area of each opening shall not be less than one square inch per 1000 BTU/HR. of total input rating of all appliances within the enclosure; with a minimum of 100 square inches for each opening.

If all the air for combustion and ventilation is to come from outside the building: Two (2) openings shall be provided with one opening commencing within 12 inches of the top and an opening commencing within 12 inches of the bottom of the enclosure. These openings shall not be located closer than 3 inches from either the top or bottom of the enclosure, and shall connect directly or by ducts with the outdoors. The area of each opening shall be equal to one square inch per 4000 BTU/HR of total input rating. If ducts are used to convey the air, vertical ducts require areas of one square inch per 4000 BTU/hr. Horizontal ducts require one square inch per 2000 BTU/hr. Ducts shall have the same cross sectional area as the full area of the louver openings.

The upper opening is essential for maintenance of proper air circulation with the boiler and of reasonable ambient temperature to maintain proper control temperatures. When a duct is used for ventilation, check for louver free net area and correct for screen resistance to ensure that the sufficient ventilation area has been satisfied. DO NOT INSTALL THE BOILER UNTIL PROPER COMBUSTION AIR HAS BEEN ARRANGED.

Page 13

Image 13
Contents Phone FAX Manufactured by Biasi S.p.A Verona, Italy Distributed ByPage Table of Contents Please read this page carefully Important InformationPage To Start UP the Appliance Homeowner Information for GasTrim Kit Components General InformationGas systems only Do not Over Tighten Draw Rods Boiler Block AssemblyBoiler Location Switch Gas systems only Installation of Boiler Trim ComponentsBoiler Tapping Diagram Installation of Boiler Trim ComponentsPiping the Boiler Safety Relief ValveIntake Venting Figure a Common Exhaust Venting Exhaust VentingBlocked Flue Switch Gas Venting Oil Burner SetupGas Burner Manufacturer Oil Burner SetupGas Burner Setup Gas Line Piping Installation of Sediment Trap and Burner SupplyBoiler Jacket Assembly Wiring 7248U Wiring Procedure Oil Burner Wiring Riello OIL BURNER, SR504, Control Wiring with DHW Priority Riello OIL BURNER, AZ-4P, Control Wiring with DHW Priority Carlin OIL BURNER, SR501, Control Wiring with DHW Priority Page Heatwise SU-2A, SR503, Control Wiring with DHW Priority Page Commissioning MaintenanceSystem Checkout Installer NotesPage Page Tear on this Line

B3-B9 specifications

The QHT B3-B9 is a remarkable series of versatile vehicles designed to cater to a wide array of industries, including construction, mining, and heavy-duty logistics. With a focus on durability, efficiency, and innovative technology, the QHT B3-B9 stands out as a preferred choice for demanding tasks.

One of the key features of the QHT B3-B9 series is its robust frame construction, which employs high-strength steel to ensure maximum durability in harsh working conditions. This resilience allows the vehicle to withstand significant payloads while minimizing wear and tear, reducing maintenance costs over the long haul. Additionally, the design includes advanced corrosion resistance treatments, extending the vehicle's lifespan even in challenging environments.

The QHT B3-B9 is powered by a state-of-the-art engine, which adheres to the latest emissions standards while delivering impressive fuel efficiency. This engine utilizes advanced fuel injection technology, optimizing power output without compromising environmental responsibility. The combination of high torque and superior power-to-weight ratio enables the vehicle to perform effectively across various terrains, ensuring stability and control under load.

Another notable characteristic of the QHT B3-B9 series is its emphasis on operator comfort and safety. The cabin is ergonomically designed, featuring adjustable seating, intuitive controls, and enhanced visibility. This focus on user experience not only enhances productivity but also minimizes operator fatigue during long hours of operation. To further improve safety, the vehicle is equipped with comprehensive monitoring systems that provide real-time feedback on performance and potential issues.

Technologically, the QHT B3-B9 integrates advanced telematics, allowing operators and fleet managers to track performance metrics, fuel consumption, and maintenance schedules. This connectivity enables proactive management, reducing downtime and improving overall efficiency.

In conclusion, the QHT B3-B9 series represents a harmonious blend of strength, efficiency, and modern technology, making it an invaluable asset for businesses that require reliable performance in demanding environments. Its innovative features and commitment to operator safety and comfort ensure that it remains a top choice among heavy-duty vehicles in its class.