QHT B3-B9 installation instructions Boiler Block Assembly, Do not Over Tighten Draw Rods

Page 8

2. Boiler Block Assembly

All QHT BIASI B10 Series Boilers are shipped from the factory in assembled boiler blocks. If, however, the block needs to be split into sections for ease of delivery, please read the following:

To assemble split blocks, move sections into parallel and facing each other. Sections may be slid along boards placed underneath the sections. Inspect nipple ports for damage or burrs. Remove any burrs by scraping the port very lightly. Wipe the push nipples and nipple ports with a clean cloth. Apply a film of nipple compound to both the nipple and port. Install the nipple in the port and then seal by hitting with a hammer cushioned with a block of wood. Apply section sealant to one section only and slide sections together. Install the four draw rods and draw the sections together evenly (measure with yardstick). Draw the sections together until sections make iron-to-iron contact at a point around the top and bottom ports of each section.

DO NOT OVER TIGHTEN DRAW RODS

NOTE: When cutting off excess length of draw rods, allow enough length to install boiler jacket on the draw rods.

Boiler Components & Parts

BIASI B - Series

Boiler Block Assembly:

1Front Section

2Rear Section

3Intermediate Section

4Steel Push Nipples

5Tie Rod

6Tie Rod Nut

7Tie Rod Washer

81 1/2" X 3/4” Bushing

9Plug gasket

101/2" X 1 1/2" Bushing

11Boiler Swing Door

12Front Door Upper Insulation

13Front Door Upper Gasket

14Front Door Upper Plate

15Front Door Lower Insulation

16Front Door Stud (Qty 7)

17Front Door Lower Gasket

183/4" Plug (Sight Hole)

19Boiler Door Hinge (4 pieces)

20Hinge Pin (Qty 6)

21Boiler Body Hinge Bolts (Qty 2)

22Door Hinge Mounting Bolts (Qty 2)

236 inch Boiler Breeching

24Upper Front Fixed Door

Page 8

Image 8
Contents Manufactured by Biasi S.p.A Verona, Italy Distributed By Phone FAXPage Table of Contents Important Information Please read this page carefullyPage Homeowner Information for Gas To Start UP the ApplianceGas systems only General InformationTrim Kit Components Boiler Block Assembly Do not Over Tighten Draw RodsBoiler Location Installation of Boiler Trim Components Switch Gas systems onlyInstallation of Boiler Trim Components Boiler Tapping DiagramSafety Relief Valve Piping the BoilerIntake Venting Figure a Exhaust Venting Common Exhaust VentingBlocked Flue Switch Gas Venting Gas Burner SetupOil Oil Burner Setup Burner ManufacturerGas Burner Setup Installation of Sediment Trap and Burner Supply Gas Line PipingBoiler Jacket Assembly Wiring 7248U Wiring Procedure Oil Burner Wiring Riello OIL BURNER, SR504, Control Wiring with DHW Priority Riello OIL BURNER, AZ-4P, Control Wiring with DHW Priority Carlin OIL BURNER, SR501, Control Wiring with DHW Priority Page Heatwise SU-2A, SR503, Control Wiring with DHW Priority Page Maintenance CommissioningInstaller Notes System CheckoutPage Page Tear on this Line

B3-B9 specifications

The QHT B3-B9 is a remarkable series of versatile vehicles designed to cater to a wide array of industries, including construction, mining, and heavy-duty logistics. With a focus on durability, efficiency, and innovative technology, the QHT B3-B9 stands out as a preferred choice for demanding tasks.

One of the key features of the QHT B3-B9 series is its robust frame construction, which employs high-strength steel to ensure maximum durability in harsh working conditions. This resilience allows the vehicle to withstand significant payloads while minimizing wear and tear, reducing maintenance costs over the long haul. Additionally, the design includes advanced corrosion resistance treatments, extending the vehicle's lifespan even in challenging environments.

The QHT B3-B9 is powered by a state-of-the-art engine, which adheres to the latest emissions standards while delivering impressive fuel efficiency. This engine utilizes advanced fuel injection technology, optimizing power output without compromising environmental responsibility. The combination of high torque and superior power-to-weight ratio enables the vehicle to perform effectively across various terrains, ensuring stability and control under load.

Another notable characteristic of the QHT B3-B9 series is its emphasis on operator comfort and safety. The cabin is ergonomically designed, featuring adjustable seating, intuitive controls, and enhanced visibility. This focus on user experience not only enhances productivity but also minimizes operator fatigue during long hours of operation. To further improve safety, the vehicle is equipped with comprehensive monitoring systems that provide real-time feedback on performance and potential issues.

Technologically, the QHT B3-B9 integrates advanced telematics, allowing operators and fleet managers to track performance metrics, fuel consumption, and maintenance schedules. This connectivity enables proactive management, reducing downtime and improving overall efficiency.

In conclusion, the QHT B3-B9 series represents a harmonious blend of strength, efficiency, and modern technology, making it an invaluable asset for businesses that require reliable performance in demanding environments. Its innovative features and commitment to operator safety and comfort ensure that it remains a top choice among heavy-duty vehicles in its class.