QHT B3-B9 Gas Line Piping, Installation of Sediment Trap and Burner Supply

Page 21

9. Gas Line Piping

Gas supply piping is to be sized and installed properly in order to provide a supply of gas sufficient to meet the maximum demand without undue loss of pressure between the meter and the boiler. Consult with the National Fuel Gas Code ANSI Z223.1 for proper sizing of gas piping for various lengths and diameters.

Locate a drop pipe adjacent to, but not in front of the boiler. Locate a tee in the drop pipe at the same elevation as the gas inlet connection to the boiler. Extend the drop line with a nipple towards the floor and cap to form a sediment trap. Install a shut off valve before the tee with sediment trap and a union after the tee before the combination gas valve.

When installing the boiler, make sure a pipe compound resistant to the action of liquefied petroleum is used. Check piping for leaks. Always check leaks with a water and soap solution. DO NOT USE A FLAME FOR CHECKING GAS LEAKS

The boiler and its individual shut-off valve must be disconnected from the gas supply piping during any pressure testing of that piping at test pressures in excess of 1/2 psi.

INSTALLATION OF SEDIMENT TRAP AND BURNER SUPPLY

 

 

 

 

 

 

Direction of flow

 

 

 

 

To check for gas

 

 

 

 

 

 

 

 

 

 

leaks, use a gas detec-

 

 

 

 

 

 

 

 

 

 

tor or apply a soap

 

 

 

Manual Shutoff Valve

 

solution to the joints.

 

 

 

Height of shutoff valve above ground

 

DO NOT USE AN

 

 

 

level to conform to local codes, if any.

 

 

 

 

Note: Massachusetts state code requires

 

OPEN FLAME!

 

 

 

 

 

 

 

 

 

gas shutoff to be a tee handled gas cock.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pressure Gauge Port

 

 

 

 

 

 

 

 

(1/8” NPT plugged)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1” X 1” X 3/4” Tee

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Male Union 3/4” NPT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MINIMUM3”

 

 

 

 

 

Burner Gas Train

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pipe Cap

 

 

 

 

 

Page 21

Image 21
Contents Phone FAX Manufactured by Biasi S.p.A Verona, Italy Distributed ByPage Table of Contents Please read this page carefully Important InformationPage To Start UP the Appliance Homeowner Information for GasGeneral Information Trim Kit ComponentsGas systems only Do not Over Tighten Draw Rods Boiler Block AssemblyBoiler Location Switch Gas systems only Installation of Boiler Trim ComponentsBoiler Tapping Diagram Installation of Boiler Trim ComponentsPiping the Boiler Safety Relief ValveIntake Venting Figure a Common Exhaust Venting Exhaust VentingBlocked Flue Switch Gas Venting Burner Setup OilGas Burner Manufacturer Oil Burner SetupGas Burner Setup Gas Line Piping Installation of Sediment Trap and Burner SupplyBoiler Jacket Assembly Wiring 7248U Wiring Procedure Oil Burner Wiring Riello OIL BURNER, SR504, Control Wiring with DHW Priority Riello OIL BURNER, AZ-4P, Control Wiring with DHW Priority Carlin OIL BURNER, SR501, Control Wiring with DHW Priority Page Heatwise SU-2A, SR503, Control Wiring with DHW Priority Page Commissioning MaintenanceSystem Checkout Installer NotesPage Page Tear on this Line

B3-B9 specifications

The QHT B3-B9 is a remarkable series of versatile vehicles designed to cater to a wide array of industries, including construction, mining, and heavy-duty logistics. With a focus on durability, efficiency, and innovative technology, the QHT B3-B9 stands out as a preferred choice for demanding tasks.

One of the key features of the QHT B3-B9 series is its robust frame construction, which employs high-strength steel to ensure maximum durability in harsh working conditions. This resilience allows the vehicle to withstand significant payloads while minimizing wear and tear, reducing maintenance costs over the long haul. Additionally, the design includes advanced corrosion resistance treatments, extending the vehicle's lifespan even in challenging environments.

The QHT B3-B9 is powered by a state-of-the-art engine, which adheres to the latest emissions standards while delivering impressive fuel efficiency. This engine utilizes advanced fuel injection technology, optimizing power output without compromising environmental responsibility. The combination of high torque and superior power-to-weight ratio enables the vehicle to perform effectively across various terrains, ensuring stability and control under load.

Another notable characteristic of the QHT B3-B9 series is its emphasis on operator comfort and safety. The cabin is ergonomically designed, featuring adjustable seating, intuitive controls, and enhanced visibility. This focus on user experience not only enhances productivity but also minimizes operator fatigue during long hours of operation. To further improve safety, the vehicle is equipped with comprehensive monitoring systems that provide real-time feedback on performance and potential issues.

Technologically, the QHT B3-B9 integrates advanced telematics, allowing operators and fleet managers to track performance metrics, fuel consumption, and maintenance schedules. This connectivity enables proactive management, reducing downtime and improving overall efficiency.

In conclusion, the QHT B3-B9 series represents a harmonious blend of strength, efficiency, and modern technology, making it an invaluable asset for businesses that require reliable performance in demanding environments. Its innovative features and commitment to operator safety and comfort ensure that it remains a top choice among heavy-duty vehicles in its class.