Smith Cast Iron Boilers GB300 warranty GAS Supply Piping, Boiler Model Risers Equalizer Header

Page 39

Page 39

GB300 BOILER INSTALLATION AND OPERATION INSTRUCTIONS

CAUTION: Make up water connections must be made to the return piping, not directly to the boiler or boiler damage may result.

Locate the boiler blow off preferably opposite the return piping connections. Blow off valves must be sized equal to, or larger than, the steam relief valve. Any discharge piping is to be full size to the point of discharge.

Assemble the control tree and low water cutoff as shown in Figure 99. Use Figure 94 to locate the control tree and low water cutoff on the boiler.

Table 5

Riser, Equalizer & Header Pipe Sizes

Boiler Model

 

Risers

Equalizer

Header

GB300-5 to -9

 

1 @ 3"

1-1/2"

3"

GB300-10 to -15

2 @ 3"

2"

4"

GB300-16 to -21

3 @ 3"

3"

5"

Figure 99

Steam Control Tree

MANUAL RESET

STEAM

HIGH LIMIT

GAUGE

Table 6 should be used to ensure that the gas supply piping is sized properly. If more than one appliance is supplied by the same supply pipe, the piping must be sized based on the maximum possible demand. Do not neglect the pressure drop due to pipe fittings. Table 6 should be used in conjunction with Table 7 to ensure that the supply piping has the capacity to meet the demand.

Table 6Gas Pipe Capacity

Maximum pipe capacity in ft3/hr based on 0.60 specific gravity gas at a pressure of 0.5 psig or less and a 0.3" WC pressure drop.

Nominal

 

 

 

Pipe length in feet

 

 

Iron Pipe

10

20

30

40

50

60

80

100

150

Size, (in)

 

Maximum gas volume of pipe, (ft3/hr)

 

1"

520

350

285

245

215

195

170

150

120

1-1/4"

1050

730

590

500

440

400

350

305

250

1-1/2"

1600

1100

890

760

670

610

530

460

380

2"

3050

2100

1650

1450

1270

1150

990

870

710

2 1/2"

4800

3300

2700

2300

2000

1850

1600

1400

1130

3"

8500

5900

4700

4100

3600

3250

2800

2500

2000

Note:

Multiply the gas volume by 0.62 for propane flow capacity in ft3/hr. Multiply the propane flow capacity by 2500 Btu/ft3 to determine the propane Btu/hr capacity for a given pipe size and length.

PET COCK

SYPHON

OPERATIG

CONTROL

SYPHON

GAUGE

GLASS

L.W.C.O.

(OPT.)

GAS SUPPLY PIPING

WARNING: Check the boiler rating plate to make sure that the boiler is for the type of gas that will be used. If it isn’t, do not connect the boiler to the gas supply. Failure to comply with this warning can result in extensive property damage, severe personal injury or death!

The GB300(S,W) boiler comes from the factory ready to be piped to the gas supply. If for any reason the boiler is not for the type of gas available at the installation site, call the nearest Smith Cast Iron Boiler distributor to resolve the problem.

Table 7

 

Equivalent Pipe Length Chart

Nominal

 

Type of pipe fitting

 

Iron Pipe

90 Elbow

Tee1

Gate Valve2

Gas Cock2

Size, (in)

 

Equivalent pipe length, (ft)

 

1"

2.6

5.2

0.6

1.5

1-1/4"

3.5

6.9

0.8

1.9

1-1/2"

4.0

8.0

0.9

2.3

2"

5.2

10.3

1.2

3.0

2-1/2"

6.2

12.3

1.4

3.7

3"

7.7

15.3

1.8

4.5

Notes: 1. For flow through branch. 2. For flow at full open.

Figure 100 depicts the proper way to connect the boiler to the gas supply piping. The manual shut-off valve MUST be installed in the supply piping. It should be approximately 5 feet above the floor. Provide a sediment trap at the bottom of the vertical section of the gas supply pipe upstream of the gas controls. A ground joint union should be installed between the boiler gas controls and the supply piping. Each of these items are needed to ensure long life and ease of servicing. Always use a pipe sealant that is suitable for use with LP gas.

CAUTION: Always use a wrench on the gas valve body when making gas connections to it. Never over- tighten the piping entering the gas valve body or gas valve failure may result!

Image 39
Contents Natural or Propane GAS Boiler Contents QUE Faire SI Vous Sentez UNE Odeur DE GAZBefore YOU Start Boiler Ratings & Capacities Boiler LocationConcrete Block Base Construction 500 Combustion AIR & VentilationAll Air From Inside The Building All Air From Outside The BuildingVent Outlet, Equivalent Breeching & Chimney Size Chimney & Vent Pipe ConnectionsVent Connections Chimney Inspection & SizingCommon Vent Systems Ansi Dual Flue Outlets And Inside Air GB300 Series Common Vents And Inside Air GB300 Series CAP 1/4 IN. PER Foot 20MM/M of RUN to Horizontal Venting And Inside Air GB300Burner Base Box Boiler AssemblyBurner Base Assembly General Instructions X1 Box 72700 toBurner Base Assembly 5 through 12 Sections Burner Base Side Panels, 5Refractory Retension Bracket X7 Box Base Rear Channel Manifold Attachments Front base splice channel, FigurePlumbing Base Burner Base Splice Insulation Boards Burner Base Splice Panel BracketCeramic Blanket Installation Cast Iron Section AssemblyCeramic Blanket Adhesive Application Trimming Ceramic Rope Front View Even Numbered Models Rear View Odd Numbered ModelsUpper Port Seal Placement Draw Rod Torquing 30 ft/lbs, 42 Nm Flue Collector Box 63203 toBolt Installation Flue Collector Bracket InstallationCast Iron Pressure Test Ceramic Blanket Placement 5-12 Sect Flue Collector InstallationDraft Hood Attachment 13 to 21 Sections Clean Out Cover Insulation Clean Out CoversManifold Installations MANIFOLD, Burner and Pilot Installation FigureBurner Tube Through Rear Base Panel Follow all applicable local codesRear Jacket Bracket Attachment Jacket InstallationFigures Remove the left and right jacket side panels from Box Figures 80 Front Top Jacket Panel, 5 through Rear Top Jacket Panel, 5 throughSplice Panel Brackets Front Access Panel 13 21 Sect Front Access Panel 5 12 SectGrill Assembly Splice Grill AssemblyGas Train Assemblies Pilot AssemblyWater Boiler Piping Connections Heating System PipingBoiler Model Supply Size Return Size Piping For Use With Cooling UnitsSteam Boiler Piping Connections Water Boilers in Battery Typical Steam Piping Gravity Return for Multiple Boilers Gas Pipe Capacity Equivalent Pipe Length ChartGAS Supply Piping Boiler Model Risers Equalizer HeaderTransformer Location Electrical WiringElectrical Power Connections Gas Supply PipingWater Boilers Wire Duct and Control BoxThermostat Installation Boiler OperationLighting Instructions Continuous Pilot SystemsIntermittent Pilot Ignition Systems To Turn Off Gas To Boiler Boiler Checking & Adjustment Pilot AdjustmentPilot Flame Adjustment Gas Pressure AdjustmentLow Water Cutoff Boiler MaintenanceThermostat Adjustment Input RateControls Burner InstallationHeat Exchanger Cleaning Vent SystemGB300 Boiler Installation and Operation Instructions Ref # Name of Part 63251 Intermittent Pilot Ignition Controls Water Controls & Trim Page WESTCAST, INC North ELM Street WESTFIELD, MA

GB300 specifications

The Smith Cast Iron Boilers GB300 series is renowned for its robust construction and exceptional performance, making it a preferred choice for commercial and industrial applications. This line of boilers is designed to provide reliable and efficient heating solutions for a variety of facilities, including schools, hospitals, and manufacturing plants.

One of the standout features of the GB300 series is its durable cast iron construction. Built to withstand the demands of heavy-duty operation, the cast iron material ensures longevity and resilience against thermal cycling stresses. This design not only enhances the boiler's lifespan but also ensures that it maintains optimal performance over time, even in rigorous conditions.

The GB300 series is equipped with advanced technologies that contribute to its efficiency and ease of use. For instance, the boilers incorporate a flexible firing system that allows for a range of firing rates. This adaptability ensures that the boiler can efficiently meet varying heating loads. Additionally, the use of a multi-pass heat exchanger design maximizes heat transfer, significantly improving overall efficiency and reducing fuel consumption.

Another key characteristic of the GB300 boilers is the user-friendly control system. The integrated control panel provides operators with real-time monitoring and management capabilities, allowing for precise adjustment of temperature and pressure settings. This feature not only enhances operational efficiency but also aids in maintaining safety standards.

The GB300 series also emphasizes safety, featuring multiple levels of protection, including low water cut-off, high-pressure switches, and safety valves. These safety mechanisms ensure reliable operation and minimize the risk of operational hazards, providing peace of mind for operators and facility managers.

Versatility is another remarkable attribute of the Smith Cast Iron Boilers GB300 series. These boilers can be used in various configurations, whether as a standalone unit or as part of a more extensive heating system. This flexibility makes the GB300 series suitable for diverse applications and facility sizes.

In summary, the Smith Cast Iron Boilers GB300 series is a powerful heating solution that combines durability, efficiency, and advanced technology. Its robust cast iron construction, flexible firing capabilities, and comprehensive safety features make it an ideal choice for those seeking reliable heating systems in demanding environments. The GB300 series stands out as a testament to Smith's commitment to quality and innovation in the boiler industry.