GB300 BOILER INSTALLATION AND OPERATION INSTRUCTIONS

e.Test for spillage at the draft hood relief opening after 5 minutes of main burner operation. Use the flame of a match or candle, or smoke from a cigarette, cigar or pipe.

Faire fonctionner le brûleur principal pendant 5 min ensuite, déterminer si le coupe-tirage déborde à l'ouverture de décharge. Utiliser la flamme d'une allunette ou d'une chandelle ou la fumée d'une cigarette, d'un cigare ou d'une pipe.

f.After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers and any other gas-burning appliance to their previous condition of use.

Une fois qu'il a été d éterminé, selon la métode indiquée ci-dessus, que chaque appareil raccordé au système d'évacuation est mis à l'air libre de façor adéquate. Remettre les portes et les fenêtres, les ventilateurs, les registres de cheminées et les appareils au gaz à leur position originale.

g.Any improper operation of the common venting system should be corrected so the installation conforms with the National Fuel Gas Code, ANSI Z223.1/NFPA 54. When resizing any portion of the common venting system, the common venting system should be resized to approach the minimum size as determined using the appropriate tables in Part 11 in the National Fuel Gas Code, ANSI Z223.1/ NFPA 54.

Tout mauvais fonctionnement du systéme d'évacu- tion commun devrait étré corrigé de façor que l'instal- lation soit conforme au National Fuel Gas Code,

ANSI

Z223.1/NFPA 54 et (ou) aux codes d'installation CSA-B149. Si la grosseur d'une section du système d' évacuation doit étré modifiée, le système devrait étré modifié pour respecter les valeurs minimales des tableaux pertinents de l'appendice F du National Fuel Gas Code, ANSI Z223.1/NFPA 54 et (ou) des codes d'installation CSA-B149.

Figure 2A

Vertical Venting Using A Metal Chimney System And Inside Air(GB300 Series)

2 FT 0.6 m

10 FT 3.4 m

3 FT 0.9 m

3 FT 0.9 m

Image 7
Contents Natural or Propane GAS Boiler QUE Faire SI Vous Sentez UNE Odeur DE GAZ ContentsBefore YOU Start Boiler Location Boiler Ratings & CapacitiesConcrete Block Base Construction 500 Combustion AIR & VentilationAll Air From Inside The Building All Air From Outside The BuildingVent Outlet, Equivalent Breeching & Chimney Size Chimney & Vent Pipe ConnectionsVent Connections Chimney Inspection & SizingCommon Vent Systems Ansi Dual Flue Outlets And Inside Air GB300 Series Common Vents And Inside Air GB300 Series CAP 1/4 IN. PER Foot 20MM/M of RUN to Horizontal Venting And Inside Air GB300Burner Base Box Boiler AssemblyBurner Base Assembly General Instructions X1 Box 72700 toBurner Base Side Panels, 5 Burner Base Assembly 5 through 12 SectionsRefractory Retension Bracket X7 Box Base Rear Channel Front base splice channel, Figure Manifold AttachmentsPlumbing Base Burner Base Splice Insulation Boards Burner Base Splice Panel BracketCast Iron Section Assembly Ceramic Blanket InstallationCeramic Blanket Adhesive Application Trimming Ceramic Rope Front View Even Numbered Models Rear View Odd Numbered ModelsUpper Port Seal Placement Draw Rod Torquing 30 ft/lbs, 42 Nm Flue Collector Box 63203 toFlue Collector Bracket Installation Bolt InstallationCast Iron Pressure Test Ceramic Blanket Placement 5-12 Sect Flue Collector InstallationDraft Hood Attachment 13 to 21 Sections Clean Out Cover Insulation Clean Out CoversManifold Installations MANIFOLD, Burner and Pilot Installation FigureBurner Tube Through Rear Base Panel Follow all applicable local codesRear Jacket Bracket Attachment Jacket InstallationFigures Remove the left and right jacket side panels from Box Figures 80 Front Top Jacket Panel, 5 through Rear Top Jacket Panel, 5 throughSplice Panel Brackets Front Access Panel 13 21 Sect Front Access Panel 5 12 SectGrill Assembly Splice Grill AssemblyGas Train Assemblies Pilot AssemblyWater Boiler Piping Connections Heating System PipingPiping For Use With Cooling Units Boiler Model Supply Size Return SizeSteam Boiler Piping Connections Water Boilers in Battery Typical Steam Piping Gravity Return for Multiple Boilers Gas Pipe Capacity Equivalent Pipe Length ChartGAS Supply Piping Boiler Model Risers Equalizer HeaderTransformer Location Electrical WiringElectrical Power Connections Gas Supply PipingWater Boilers Wire Duct and Control BoxThermostat Installation Boiler OperationContinuous Pilot Systems Lighting InstructionsIntermittent Pilot Ignition Systems To Turn Off Gas To Boiler Boiler Checking & Adjustment Pilot AdjustmentPilot Flame Adjustment Gas Pressure AdjustmentLow Water Cutoff Boiler MaintenanceThermostat Adjustment Input RateControls Burner InstallationHeat Exchanger Cleaning Vent SystemGB300 Boiler Installation and Operation Instructions Ref # Name of Part 63251 Intermittent Pilot Ignition Controls Water Controls & Trim Page WESTCAST, INC North ELM Street WESTFIELD, MA

GB300 specifications

The Smith Cast Iron Boilers GB300 series is renowned for its robust construction and exceptional performance, making it a preferred choice for commercial and industrial applications. This line of boilers is designed to provide reliable and efficient heating solutions for a variety of facilities, including schools, hospitals, and manufacturing plants.

One of the standout features of the GB300 series is its durable cast iron construction. Built to withstand the demands of heavy-duty operation, the cast iron material ensures longevity and resilience against thermal cycling stresses. This design not only enhances the boiler's lifespan but also ensures that it maintains optimal performance over time, even in rigorous conditions.

The GB300 series is equipped with advanced technologies that contribute to its efficiency and ease of use. For instance, the boilers incorporate a flexible firing system that allows for a range of firing rates. This adaptability ensures that the boiler can efficiently meet varying heating loads. Additionally, the use of a multi-pass heat exchanger design maximizes heat transfer, significantly improving overall efficiency and reducing fuel consumption.

Another key characteristic of the GB300 boilers is the user-friendly control system. The integrated control panel provides operators with real-time monitoring and management capabilities, allowing for precise adjustment of temperature and pressure settings. This feature not only enhances operational efficiency but also aids in maintaining safety standards.

The GB300 series also emphasizes safety, featuring multiple levels of protection, including low water cut-off, high-pressure switches, and safety valves. These safety mechanisms ensure reliable operation and minimize the risk of operational hazards, providing peace of mind for operators and facility managers.

Versatility is another remarkable attribute of the Smith Cast Iron Boilers GB300 series. These boilers can be used in various configurations, whether as a standalone unit or as part of a more extensive heating system. This flexibility makes the GB300 series suitable for diverse applications and facility sizes.

In summary, the Smith Cast Iron Boilers GB300 series is a powerful heating solution that combines durability, efficiency, and advanced technology. Its robust cast iron construction, flexible firing capabilities, and comprehensive safety features make it an ideal choice for those seeking reliable heating systems in demanding environments. The GB300 series stands out as a testament to Smith's commitment to quality and innovation in the boiler industry.