Installation
Getting Started
The sheet metal sides and top are easily removed to reduce the chance of dents and/or scratches in the finish. Simply lift the top off, and that will allow the sides to be pulled away and up, for removal. To
NOTE: The sheet metal top holds the sides in place, thus, no bolts or screws are needed.
Caution: Boiler should not be installed closer than 36 inches (915 mm) to any combustible material
Locating Boiler
Place the boiler as close to the chimney as possible, while still maintaining the above mentioned clearances. Bolt the shaker handle on to the block on the side of the boiler, using the (2) 5/16 X 3/4 in. bolts and
Assembly
Install the Temperature/Pressure Gauge into the pipe stub in the center of the round plate on the front of the boiler (FIG. 1)
Install the A350 sensor wire all the way into the immersion well and screw the well into one of the top hole
Turn the pressure relief valve into the stub on top of the boiler, next to the supply outlet fitting.
NOTE: Use teflon tape to seal the threads on all fittings. Any unused fittings must be plugged
Bolt the two manual draft controls through the holes in the top load door. (FIG.2) The draft control knob should spin freely and open to a distance of approximately 3/8 in. from the door surface, while being able to close against the door surface.
Pressure Relief Valve | Domestic Hot Water |
| Coil Option |
Temp/Pressure |
|
Gauge |
|
Immersion Well |
|
Optional Electric | Johnson |
Controls | |
| Aquastat and |
| Terminal Block |
Shaker Handle |
|
FIG.1 | Automatic Draft Control |
|
3/8 to 1/2 in.
FIG.2
5