D.Install Vent Pipe, General.

1.Start at vent connector. Work toward vent terminal.

2.Use ¾ inch pipe strap to support horizontal runs, maintain vent location and slope, and prevent sags. Do not restrict thermal expansion movement. Maximum support spacing is 5 feet.

3.Provide minimum 5 inch clearance to combustible materials. Use thimble when penetrating combustible wall.

a.203PV and 204PV - Single wall thimble, Burnham Part No. 8116116. Other wall thimble manufacturers are American Metal Products, Hart & Cooley, and Metal Fab.

b.205PV and 206PV - Double wall thimble, Burnham Part No. 8116115 (accomodates 5" to 8¾" wall thickness). Another wall thimble manufacturer is Hart & Cooley.

4.Cut pipe to length using hacksaw with minimum 32 teeth per inch or circular saw with metal abrasive wheel. Remove bead end only - bell end accepts next fitting or pipe. Cut must be square with pipe. Scrape off burrs with sharp edged tool.

Note: If remaining pipe (less bell) must be used, beaded end of mating pipe/fitting must be crimped.

5.Seal all joints using Dow Corning Silastic 732 RTV, Dow Corning Silastic 736 RTV, Polybac #500 RTV, or Sil-bond RTV 4500 (Acetoxy). Do not use other adhesives or sealants.

6.Procedure for joining pipe and fittings. See Figure 8.

a.Clean pipe or fitting. Remove all dirt and grease.

b.Slip locking band over pipe/fitting bell.

c.Apply continuous ¼ inch bead of sealant around bead end of pipe/fitting no more than 1/8 inch from end.

d.Insert pipe/fitting into bell. Smooth sealant for continuous seal around gap between bead and bell. Apply additional sealant if necessary.

e.Slip locking band over joint and tighten. Do not secure joint with sheet metal screws or pop rivets.

E.Horizontal (Through Wall) Vent Installation.

1.Maintain minimum ¼ inch per foot slope in horizontal runs. Slope pipe down toward vent terminal.

CAUTION

Moisture and ice may form on surfaces around vent terminal. To prevent deterioration, surfaces should be in good repair (sealed, painted etc.)

2.Vent terminal location restricted per following:

a.Minimum 12 inches above grade plus normally expected snow accumulation level, or 7 feet above grade if located adjacent to public walkway. Do not install over public walkway where local experience indicates condensate or vapor from Category III appliances creates a nuisance or hazard.

Figure 8: Typical Joint Detail

b.Minimum 3 feet above any forced air inlet located within 10 feet.

c.Minimum 4 foot below, 4 foot horizontally from, or 1 foot above any door, window, or gravity air inlet.

d.Minimum 4 feet horizontally from, and in no case above or below, unless a 4-foot horizontal distance is maintained, from electric meters, gas meters, regulators and relief equipment.

e.Minimum 12 inches from overhang or corner.

3.Use wall thimble when passing through combustible outside wall (thimble use optional for noncombustible wall). Insert thimble through wall from outside. Secure outside flange to wall with nails or screws, and seal with adhesive material. Install inside flange to inside wall, secure with nails or screws, and seal with adhesive material.

4.For noncombustible wall when thimble is not used, size opening such that bell with locking band attached cannot pass through.

5.Join vent terminal to vent pipe. Cut vent pipe to locate vent terminal 3 inches (minimum) and 6 inches (recommended) from wall when joined to inside vent piping. See Figure 9. Vent terminal clearance to vinyl wall surfaces is 6 inches.

6.Insert vent pipe through thimble/opening from outside and join to vent system. Apply sealant between vent pipe and opening/thimble to provide weathertight seal.

11

Image 11
Contents 8141775R12-3/01 Price $3.00 Series 2PVTable of Contents Elevation Views Pre-Installation Alternate method for boiler located within confined II. Unpack BoilerIII. Water Piping and Trim Page Connect boiler gas valve to gas supply system IV. Gas PipingRated Input General Guidelines VentingFitting Equivalent Lengths Specific Gravity Correction FactorsBurnham Vent System Components Install Vent ConnectorHorizontal Through Wall Vent Installation Install Vent Pipe, GeneralRecommendations for Thimble and Wall Penetration VI. ElectricalVII. System Start-up Main Burner InstallationPrepare to check operation Gas Valve Pressure TapGas Flow Rate in Cubic Feet per Hour Adjust gas input rate to boiler Natural GasCheck limit Operating Instructions Trouble Shooting Guide Page Page Avoid Breathing Fiber Particulates and Dust Clean Main Burners and Firebox VIII. ServicePilot Burner Location Spark Gap SettingMinimum Suction Pressure Procedure for Measuring Fan Suction PressureBurnham Corporation Regional Offices IX. Repair PartsCanopy/Blower Assembly Section AssemblyBase Assembly Group Manifold and Main Burners Pilot Burner and Gas Valve Jacket Page Vent Accessory Carton

20_PV_I specifications

The Burnham 20_PV_I is a high-efficiency, versatile heating solution designed for residential and commercial applications. Renowned for its performance and reliability, the Burnham 20_PV_I is a notable choice for those seeking an effective way to heat their spaces.

One of the standout features of the Burnham 20_PV_I is its innovative design, which incorporates a range of advanced technologies to maximize thermal efficiency. The boiler operates using a proven cast iron heat exchanger that ensures optimal heat transfer. This not only allows for rapid heating but also contributes to the longevity of the unit. With a heating capacity of 20,000 BTUs, it is well-suited for medium-sized spaces, making it ideal for heating homes or small businesses.

Efficiency is a key attribute of the Burnham 20_PV_I, which boasts an impressive AFUE (Annual Fuel Utilization Efficiency) rating. This high efficiency translates into lower fuel consumption, resulting in reduced energy bills for users. The boiler is designed to operate with various fuel types, accommodating natural gas and propane options, which provides flexibility depending on regional availability and price factors.

Another notable characteristic of the Burnham 20_PV_I is its user-friendly control system. The boiler features an integrated digital control panel that allows users to easily set desired temperatures and monitor system performance. This level of control enhances comfort while also enabling owners to proactively maintain efficiency.

In terms of installation, the Burnham 20_PV_I is designed with convenience in mind. Its compact dimensions allow it to be installed in various locations, including basements and utility rooms, without taking up excessive space. Plus, the unit's lightweight construction facilitates easier handling during the installation process.

Safety is paramount in the design of the Burnham 20_PV_I, which includes multiple safety features such as a high limit temperature control, pressure relief valve, and robust emergency shutoff systems. These features ensure reliable operation and peace of mind for users.

Overall, the Burnham 20_PV_I stands out as a robust, efficient, and user-friendly heating solution. With its advanced technologies, impressive efficiency ratings, and committed focus on safety and reliability, it represents an excellent investment for anyone looking to enhance their heating systems, providing warmth and comfort for years to come.