TOWERS AND DOORS INSTALLATION

THESE INSTRUCTIONS ARE FOR SUMMER RAIN

 

 

 

UNITS WITH AND WITHOUT AIR FEATURE OPTION.

WATER TOWER DETAIL

 

 

REFER TO COMPONENT IDENTIFICATION ON PAGE

 

 

 

4 TO HELP IDENTIFY PARTS.

FLOW

 

 

All wall finish tiling, trim, and sealing should be

SWITCH

 

 

CABLE*

 

 

completed before beginning this part of the installa-

BOLT (5/16")

 

 

tion.

 

 

STEP 1

WASHER

 

 

 

 

 

Position each tower on mounting pad on base. For the

 

 

 

shower towers, feed hot and cold supply line through

SHOWER

 

 

appropriate holes in bottom of tower. For air feature,

 

 

TOWER (2X)

 

 

 

 

feed air line through large hole on bottom cap of the air

 

 

 

tower. Check with a level when attaching towers to base.

 

 

 

Tighten tower base bolts after leveling (1 bolt per shower

COLD

HOT

tower and 2 bolts for air tower).

* ONLY WITH AIR TOWER UNITS

STEP 2 (WITH AIR FEATURE ONLY)

Route control panel cable up through air tower and connect to control panel.

CONTROL

PANEL CABLE

BOLT 5/16" (2)

WASHER (2)

 

 

 

AIR

AIR SU

PPY

PIPE

TOWER

BLACK LEAD

REAR OF CONTROLLER

STEP 3 (WITH AIR FEATURE ONLY)

Route flow switch cables up through water towers and connect to flow switch on both shower towers.

FLOW

SWITCH

FROM

CONTROL

BOX

8

Jacuzzi Whirlpool Bath© BY82000 03/05

Page 10
Image 10
Jacuzzi BY82000 manual Towers and Doors Installation, With AIR Feature only