TOWERS AND DOORS INSTALLATION

STEP 5

Two shut-off valves are provided per water tower. To hook up supply lines, unscrew valves from braided line. Using thread sealant, screw each valve to stub out at bottom of tower. Then reconnect braided line using provided gasket. Do not twist or kink supply lines when connecting. Perform this step for both water towers.

SHUT OFF VALVES (PROVIDED)

COLD HOT

CAULK AROUND SUPPLY

PIPING AND INSIDE TOWER BASE

STEP 4 (WITH AIR FEATURE ONLY)

Attach air supply pipe to air tower plumbing.

10

Jacuzzi Whirlpool Bath© BY82000 03/05

Page 12
Image 12
Jacuzzi BY82000 manual Attach air supply pipe to air tower plumbing