Bosch Appliances 100 Combi Boiler manual System 4 Setup and Programming, Initial setup

Page 28

28 Bosch Greenstar

Applications Manual

 

 

System 4: Setup and Programming

In this single zone system the FW200 is installed in the living space in a location that represents the conditions of the entire zone. Avoid locations exposed to direct or indirect sunlight, heat sources, draft, etc. that can lead to over compensation.

Initial setup:

See the installation instructions for description of buttons and displays, and for details on setup and programming.

Power up the boiler.

Use the FW200 for programming the heating system.

When commissioning for the first time, set the display language, date and time.

Upon first commissioning the automatic system configuration starts. Wait 60 seconds and follow the instructions displayed. You have the option of using the factory settings or entering custom parameters to better match the individual requirements.

Set up the weekly heating program for the three available temperature levels:

Comfort

Economy

Frost (Frost protection)

Take advantage of using one of the preset programs from the list or enter a custom program.

Program A

Program F

AM weekday worker

PM weekday worker

All day

All day, lunch

Family

All day, early shift

All day, late shift

Seniors

Set the room temperatures for the three specified temperature levels.

Set up the weekly program for DHW tank loading and the DHW recirculation pump (if installed). Separate individual programs can be set up or the hours of op- eration can be linked to the heating program.

Enter the installer menu to configure the heating zone.

Set heating circuit type to Baseboard.

Set the minimum outdoor temperature, building storage capacity, design day temperature, and maximum supply temperature.

Set the room influence followed by the remaining parameters as applicable.

Proceed in the installer menu to configure the solar thermal system. The solar system requires manual configuration.

Run solar system: Yes

Solar system parameters: Standard system.

Set options A2 to E as required.

It is recommended to keep the factory default solar system parameters.

Exit the installer menu.

When done, ensure the mode selector is set to AUTO.

The room temperature will be displayed.

Additional information

The solar thermal system will start harvesting energy once the collector temperature is at least 16°F (9°C) warmer than the bottom of the solar tank. The upper half of the solar tank ("comfort zone") is maintained at temperature as set in the DHW programming. The lower half is available for solar harvesting.

With outdoor reset the boiler will provide the water temperature according to the heating curve adjusted by the level of room influence (if enabled).

The boiler will always attempt to run at its highest efficiency in low fire for as long as necessary.

The boiler will shut down when the target temperature is reached followed by a 3 minute post purge by the pump.

The boiler and the pump will start again when the supply water temperature drops 18°F (10°C) below the set point.

When the demand for hot water is sensed by the flow sensor, the boiler will change to DHW mode. When the DHW demand ends, the boiler will return to heating mode.

Data subject to change

Bosch Thermotechnology Corp.

Image 28 Contents
Bosch Bosch Greenstar Applications Manual Table of Contents Greenstar Heating boilers Boiler types and sizesGreenstar Combi-boilers FW200 Boiler Energy Management System DHWFB100 Remote Control & Room Sensor IPM2 Space Heating Module Combination overviewISM2 Solar Module Combination overviewBasic solar thermal systems System expansionsApplications List of most common applications Boiler pump capacity in single zone systems GPMPump curve of heating boiler System 1 Greenstar Heating Boiler in a single zone system SummaryDetail Required componentsSystem 1 Piping Diagram System 1 Wiring Diagram Initial setup System 1 Setup and ProgrammingAdditional information System 2 Greenstar Combi Boiler in a single zone system System 2 Piping diagram System 2 Wiring diagram System 2 Setup and Programming Summary System 3 Piping diagram System 3 Wiring diagram System 3 Setup and Programming Summary System 4 Piping diagram System 4 Wiring diagram System 4 Setup and Programming System 5 Greenstar Heating Boiler in a single zone system System 5 Piping diagram System 5 Wiring diagram System 5 Setup and Programming System 6 Greenstar Combi Boiler in a single zone system System 6 Piping diagram System 6 Wiring diagram System 6 Setup and Programming Summary System 7 Piping diagram System 7 Wiring diagram System 7 Setup and Programming Summary System 8 Piping diagram System 8 Wiring diagram System 8 Setup and Programming Boiler and FW200 programmingSummary System 9 Piping diagram System 9 Wiring diagram System 9 Setup and Programming Summary System 10 Piping diagram System 10 Wiring diagram System 10 Setup and Programming Summary System 11 Piping diagram System 11 Wiring diagram System 11 Setup and Programming Summary System 12 Piping diagram System 12 Wiring diagram System 12 Setup and Programming Applications Manual Bosch Greenstar Bosch Greenstar Applications Manual Applications Manual Bosch Greenstar