Crown Boiler
BWC225, BWC150
manual
Wall Penetration Clearances for PVC Vent Pipe
Page 14
FIGURE 1.13: WALL PENETRATION CLEARANCES FOR PVC VENT PIPE
FIGURE 1.14: VERTICAL CPVC/PVC VENTING, BWC070/090/120/151 (VENT OPTION 5)
12
Page 13
Page 15
Image 14
Page 13
Page 15
Contents
BWC Series
Page
Page
Vent System Design
Summary of Horizontal Venting Options
Page
Page
Page
Crown CPVC/PVC Venting Components
Crown CPVC/PVC Vent KIT Contents
9c Positioning Vent Terminal Under Overhangs
10 Snorkel Terminal Configuration
12 Summary of Vertical Venting Options
13 Wall Penetration Clearances for PVC Vent Pipe
15 Vertical CPVC/PVC VENTING, BWC070/090/120/151 Vent Option
Assembly of CPVC/PVC Vent Systems
17 Installation of VENT/INTAKE Adaptor BWC070/090/120/151
19 Installation of Standard Horizontal Terminals
20 Installation of Standard Vertical Terminals
Page
22 Installation of Optional Concentric Terminal Through Roof
Condensate Trap and Drain Line
23 Condensate Piping Arrangement BWC070/090/120/151
Removing an Existing Boiler From a Common Chimney
Page
PN 980034 Rev 10/10
Top
Page
Image
Contents