8)Slide or walk the assembly into its permanent position. DO NOT DROP.

9)The assembly must be level in both directions and supported around the entire base bottom. Shim and grout under base if necessary.

10)The flame roll-out switch has been mounted to the burner access panel at the factory. On boilers with two access panels the panel with the mounted flame roll-out switch should be located on the right. See Figure 4. The flame roll-out switch is a single use device - do not test with heat - the switch cannot be reset.

11)Remove the immersion well from the Combination Boiler Parts and Control Carton. Insert the immersion well in tapping D. See Figure 4. If a second limit or operating control is used, it is recommended that it be installed in the near boiler supply piping.

Figure 4: Boiler Shipping Arrangement With Tapping Locations

Component Des cription

Tapping

Tapping

Location

S ize (in)

 

Su p p ly Pip in g

A

2

 

 

 

Retu rn Pip in g

B

2

 

 

 

Pres s u re Relief Valv e

C

3/4

Ho n ey well L4080D Limit Co n tro l

D

3/4

 

 

 

Facto ry Plu g g ed

E

3/4

 

 

 

W as h o u t (Facto ry Plu g g ed )

F

3/4

Bo iler Drain Valv e

G

3/4

 

 

 

Co mb in atio n Pres s u re / Temp eratu re / A ltitu d e Gau g e

H

1/4

 

 

 

Ho n ey well L4006E M an u al Res et Limit Co n tro l (By Oth ers )

Bo iler Su p p ly

-

Pip in g

 

 

Lo w W ater Cu t Off (By Oth ers )

Bo iler Su p p ly

-

Pip in g

 

 

Table 4: Tapping Purpose Chart

97

Image 9
Contents Series Page Product Description Table of ContentsII Specifications IV Locating the Boiler III Before InstallingMinimum Clearances to Combustibles Ove r a ll Im u m He ig h t Bo ile r Ro o m Prior To Assembly Knockdown Boiler Assembly InstructionsBoiler Shipping Arrangement With Tapping Locations Tapping Purpose Chart108 Jacket Assembly119 1012 Gas Train Standard Build 1412 Control & Trim Installation1513 VI Air For Combustion and VentilationFor Buildings Of Unusually Tight Construction 16141715 All Air From Outdoors, Ventilated Crawl Space & Attic1816 1917 VII Venting2018 Typical Venting Arrangement For The Series Boiler2119 Blocked Vent Switch Installation Details2220 Removing An Existing Boiler From a Common ChimneyViii System Piping Standard Heating System Piping2321 224 2523 Standard Boiler Piping2624 2725 IX Gas PipingControl System Wiring Sequence of Operation Vent Damper If Used2826 Sequence of Operation Standard Boiler Wiring Sequence of Operation CSD-1 Boiler Wiring2927 3028 Series 16 Standard Boiler Wiring3129 Series 16 CSD-1 Boiler Wiring3230 Safety Control Operation3331 XI Start-up and Checkout3432 3533 Gas Valve Detail Robertshaw 7000DERHC3634 For Your Safety Read Before LightingXII Service and Maintenance On an annual basis3735 3836 Heat Exchanger Cleaning Procedure3937 Xiii PartsExploded View Base Parts & Manifold 4139 Base / Manifold Assembly4240 4341 Base / Heat Exchanger / Flue Collector AssemblyExploded View Jacket Jacket Panel Carton 4543Exploded View Trim & Control Components Control Components Carton 4745PN980416

16-325 500506 specifications

The Crown Boiler 16-325 500506 is a highly reliable heating solution designed for residential and light commercial applications. Known for its robust construction and advanced technologies, this boiler is engineered to deliver efficient heating while ensuring longevity and minimal maintenance.

One of the standout features of the Crown Boiler 16-325 is its durable steel construction, which is essential for handling the high temperatures and pressures involved in heating systems. The boiler is typically equipped with a cast iron heat exchanger, known for its excellent heat retention and distribution capabilities. This ensures that the system heats up quickly and maintains consistent temperatures throughout the space.

The boiler's capacity to produce 325,000 BTUs makes it suitable for larger homes or commercial buildings with significant heating demands. Its high input capacity allows for effective operation in areas where traditional systems may struggle to keep up with heating requirements. The Crown Boiler 16-325 employs a forced hot water system, which circulates water through pipes and radiators, providing uniform heat and comfort in indoor spaces.

A significant technological advancement in this model is its integrated control system. The advanced control module automates burner operation, ensuring optimal performance while minimizing energy consumption. This technology not only enhances efficiency but also helps in reducing operational costs, making it a cost-effective choice for users.

Moreover, the Crown Boiler 16-325 is designed with ease of installation and maintenance in mind. It features convenient access panels that simplify the maintenance process, allowing technicians to perform service checks and repairs without extensive downtime. This attribute is particularly beneficial for property managers or homeowners looking for a hassle-free heating solution.

In terms of safety features, the boiler is equipped with a pressure relief valve and a low-water cutoff switch, ensuring safe operation while protecting against potential hazards associated with overheating or lack of water.

Overall, the Crown Boiler 16-325 500506 is a powerful and efficient heating solution that excels in durability and performance. With its advanced technologies, substantial heating capacity, and user-friendly design, it represents an excellent choice for those seeking a reliable heating system that combines efficiency with long-term operational savings.