TWO HORIZONTAL TANK INSTALLATION

THREE HORIZONTAL TANK INSTALLATION

FIGURE 25

START-UP AND OPERATING

INSTRUCTIONS

WARNING

After placing boiler into operation, the ignition system safety shutoff device must be tested by the following test method.

1.Reset Manual High Temperature Safety Limit Control (High Limit) to the lowest setting. (See figures 3 or 4, pages 5 or 6).

2.Reset System Controller to maximum setting, causing a call for heat and allowing unit to run until High Limit trips.

3.Reset Manual High Temperature Safety Limit Control to original temperature setting.

4.Push the reset button, unit should run.

5.Reset system controller to desired temperature.

If unit fails to run, see "TROUBLESHOOTING" section in this manual.

These units are so constructed that lime removal is simple and complete, see PREVENTIVE MAINTENANCE.

32

Image 32
Contents Installation Operation Maintenance Limited Warranty TM Models DB/DW-720-1810Foreword ContentsReplacement Parts Levelling ROUGH-IN Dimensions CapacitiesInstallation Clearances Pressure Drop Features Safety Relief ValvesManual Reset High Temperature Safety Limit Control Electronic Intermittent Pilot Ignition ControlAutomatic Reset High Temperature Limit Control Safety Flow SwitchThermal Balancer Dual Stage Models only HIGH/LOW OperatorInstallation Instructions Required AbilityLocation AIR RequirementsVent Connection Venting the BoilerDraft Hood Connecting Boiler to a Common Vent GAS ConnectionsPurging Correct GASHigh Altitude Installations Wiring ConnectionsConventional Installations ExampleSystems Equipment Installation Circulating Pump Circulating Pump Must be Properly Sized for Your ApplicationSystem Installation Tank Temperature ControlConventional Space Heating Installation LOW Water CutoffDB Installation Installation AS Boiler ReplacementPage LINEAR-TEMP Space Heating Installations LINEAR-TEMP Space Heating ApplicationsDuraMax Pump Performance Requirements Safety Flow Switch Thermometer Pressure GaugeONE Boiler LINEAR-TEMP System Page Page Page Page Page Page Hard Water Conditions ONE DURA-MAX Model DW Commercial Boiler with Vertical TankONE DURA-MAX Model DW Commercial Boiler with Horizontal Tank NPT NPT Manifolding of Model TJV-120M & TJV-200M Tanks START-UP and Operating Instructions For Your Safety Read Before Operating Precautions Checking and Adjusting the InputInternal Contaminants Pilot BurnerPRE-TROUBLE-SHOOTING TROUBLE-SHOOTINGNo Spark AT Pilot Burner YESSpark AT Pilot Burner but Pilot will not Light Pilot Burner Lights but Main Burner does not Light General Maintenance Venting MaintenanceHeat Exchanger Preventive Maintenance Relief ValveDeliming Solvents Removing Light Deposits of ScaleMechanical Removal of Deposits Removal of AN Existing Boiler from a Common Venting SystemDURA-MAX Limited Warranty Page Page Replacement Parts