Desa R installation manual Checking GAS Connections, Pressure Testing gas Supply Piping system

Page 13

INSTALLATION

Continued

 

CSA Design-Certified Equipment

PROPANE/LP

Shutoff Valve With 1/8" NPT Tap*

From External

 

Regulator

 

(11" W.C.**

Approved Flexible

to 14" W.C.

Gas Hose (if allowed

Pressure)

by local codes)

 

NATURAL

 

From Gas

3" Minimum

Meter

(5" W.C.**

 

to 10.5" W.C.

 

Pressure)

Gas Regulator

 

Tee Cap Pipe

Joint Nipple

Sediment Trap

Figure 16 - Gas Connection (Variable Manually-Controlled and Thermostatically-Controlled Models Only)

INSTALLATION

13

Connecting to Gas Supply (Cont.)

Checking Gas Connections

 

 

 

CHECKING GAS CONNECTIONS

WARNING: Test all gas piping and connections for leaks after installing or servicing. Correct all leaks at once.

WARNING: Never use an open flame to check for a leak. Apply a noncorrosive leak detection fluid to all joints. Bubbles forming show a leak. Correct all leaks at once.

CAUTION: Make sure external regulator has been installed between propane/LP supply and heater. See guidelines under Connecting to Gas Supply, page 12.

Pressure Testing gas Supply Piping system

Test Pressures In Excess Of 1/2 PSIG (3.5 kPa)

1.

Disconnect appliance with its appliance main gas valve (control

 

valve) and equipment shutoff valve from gas supply piping sys-

 

tem. Pressures in excess of 1/2 psig will damage heater regulator.

2.

Cap off open end of gas pipe where equipment shutoff valve

 

was connected.

CSA Design-Certified Equipment Shutoff Valve With 1/8" NPT Tap*

Approved Flexible Gas Hose (if allowed by local codes)

3" Minimum

PROPANE/LP - From External Regulator (11" W.C.**

to 14" W.C. Pressure)

NATURAL - From Gas Meter

(5" W.C.**

to 10.5" W.C. Pressure)

3.

Pressurize supply piping system by either opening propane/LP sup-

 

ply tank valve for propane/LP gas or opening main gas valve lo-

 

cated on or near gas meter for natural gas, or using compressed air.

4.

Check all joints of gas supply piping system. Apply noncorrosive

 

leak detection fluid to all joints. Bubbles forming show a leak.

5.

Correct all leaks at once.

6.

Reconnect heater and equipment shutoff valve to gas supply.

 

Check reconnected fittings for leaks.

Test Pressures Equal To or Less Than 1/2 PSIG (3.5 kPa)

1.

Close equipment shutoff valve (see Figure 18, page 14).

2.

Pressurize supply piping system by either opening propane/LP sup-

 

ply tank valve for propane/LP gas or opening main gas valve lo-

Gas Control

Pipe Cap

Tee

Nipple

Joint

 

 

 

 

 

 

 

 

 

 

 

 

 

Sediment Trap

Figure 17 - Gas Connection (Remote-Ready Models Only)

*Purchase the optional CSA design-certified equipment shutoff valve from your dealer. See Accessories, page 36.

**Minimum inlet pressure for purpose of input adjustment.

 

cated on or near gas meter for natural gas, or using compressed air.

3.

Check all joints from gas meter to equipment shutoff valve for

 

natural gas or propane/LP supply to equipment shutoff valve

 

for propane/LP (see Figure 19, page 14). Apply noncorrosive

 

leak detection fluid to all joints. Bubbles forming show a leak.

4.

Correct all leaks at once.

For morevisit www..com

104415-01H

Image 13
Contents What to do if YOU Smell GAS OWNER’S Operation and Installation ManualSafety Information Table of ContentsOther gases Product IdentificationProduct Features Optional Remote Control AccessoriesLocal Codes UnpackingConfined and Unconfined Space Determining FRESH-AIR Flow for Heater LocationDetermining if You Have a Confined or Unconfined Space Ventilation Air From Inside Building Ventilation AIRVentilation Air From Outdoors Installation and Clearances for VENT-FREE Operation InstallationCheck GAS Type Minimum Noncombustible Material Clearances If Not Using MantelMantel Clearances Determining Minimum Mantel Clearance When Using a HoodFloor Clearances Determining Minimum Mantel ClearanceInstalling Heater Base Assembly Installing Damper Clamp Accessory for Vented OperationInstallation Items Needed Area of Various Standard Round FluesAttaching Base to Fireplace Floor Remote-Ready Models Only External Regulator With Vent Pointing Down Connecting to GAS SupplyChecking GAS Connections Pressure Testing gas Supply Piping systemPressure Testing Heater Gas Connections Installing LogsProng Log Rear Burner Grate Lighting Instructions Operating HeaterTo Turn OFF GAS to Appliance Manual Lighting ProcedureThermostat Control Operation Shutting Off HeaterVariable Control Operation REMOTE-READY Models For Your Safety Read Before LightingControl Knob and Ignitor Button Location Thermostat Control Operation Optional Remote OperationGhrcta Series Operation Ghrc Series OperationPilot Flame Pattern Inspecting BurnersFront Burner Flame Pattern Cleaning Burner Injector Holder and Pilot AIR Inlet Hole Cleaning MaintenanceLogs Observed Problem Possible Cause Remedy TroubleshootingRefer to Air for Combustion and Venti Gas leak. See Warning statement For Masonry and FACTORY-BUILT Metal Fireplace Optional Positioning of Thermostat Sensing BulbThermostat-Controlled Models Only Remote-Ready SpecificationsService Hints Wiring Diagram Replacement PartsTechnical Service Parts Under WarrantyVariable Manually Controlled Split OAK Models Illustrated Parts BreakdownVariable MANUALLY-CONTROLLED Split OAK Models Parts ListVS30NTB and VS30PTB THERMOSTAT-CONTROLLED Models REMOTE-READY Variable Control Parts List Accessories Owners Registration Form Postage Required 104415-01H Warranty Information

R specifications

Desa R is an innovative urban development designed as a model for sustainable living. Located in a prime setting, it combines modern technology with an eco-friendly approach, making it a standout community in today's urban landscape. The main features of Desa R revolve around sustainability, community engagement, and smart city solutions.

One of the cornerstones of Desa R is its commitment to sustainability. The development incorporates extensive green spaces, which not only promote biodiversity but also provide residents with recreational areas. Parks, gardens, and tree-lined streets are thoughtfully distributed throughout the area, encouraging outdoor activities and community gatherings. The design emphasizes walkability, reducing the need for vehicular transportation and promoting healthier lifestyles.

Desa R utilizes advanced technologies to enhance the living experience. Smart home systems are integrated into residential units, allowing for control of lighting, heating, and security through mobile applications. This technology not only contributes to energy efficiency but also provides residents with convenience and peace of mind. Additionally, smart waste management systems are in place, utilizing sensors to optimize waste collection routes and minimize environmental impact.

The development also prioritizes renewable energy sources. Solar panels are installed on rooftops, harnessing sunlight to provide clean energy for homes and shared facilities. This not only reduces energy costs for residents but also contributes to the community's overall carbon footprint reduction.

Community engagement is another integral aspect of Desa R. A variety of communal spaces, such as coworking hubs, community centers, and event venues, facilitate social interaction and collaboration among residents. Regular workshops and events are organized to foster a sense of belonging and encourage skill-sharing among community members.

Transport in Desa R is designed to be efficient and sustainable as well. The area is well-connected with public transport options, including electric buses and cycling paths, making it easier for residents to travel without relying heavily on personal vehicles.

In summary, Desa R embodies the future of urban living, characterized by sustainability, technological integration, and community-oriented design. It serves as a blueprint for future urban developments, demonstrating that modern living can harmonize with the environment and foster strong community ties.