Hearth and Home Technologies SC60 owner manual Clearances to Combustible Materials

Page 19

B. Clearances

WARNING! Risk of Fire! You must comply with all minimum air space clearances to combustibles as specified in Fig- ure 6.2. DO NOT pack required air spaces with insulation or other materials.

Storm Collar

Roof Flashing

(attic)

(insulation)

2 in. (51 mm) min.

Shaded areas

represent

2 in. (51 mm) min. air space clearance required around pipe

Attic

Insulation

Shield

(ceiling)

Offset/Return (secured

with hanger straps)

(ceiling)

Ceiling Firestop

Object

to floor

Combustible

 

48 in.

 

1219 mm

 

0 in.

 

 

Must have 2 in. (51 mm)

minimum clearance

to header

0 in. to level of standoffs

1/2 in. (13 mm) to back & sides of appliance, and at nailing flanges

Figure 6.2 Clearances to Combustible Materials

Note: Chimney air kit is not shown, but is required in Canada.

Heatilator • SC60 • 32838 • Rev Y • 11/08 WIP

19

Image 19
Contents Hot screen/mesh and glass doors will cause burns Wood Burning FireplaceFire Risk Grate Listing Label Information/LocationNumber Installer Guide Table of ContentsUser Guide CONDITIONS, Exclusions & Limitation of Liability Hearth & Home Technologies Limited WarrantyHeatilator SC60 32838 Rev Y 11/08 WIP Combustible Materials Listing and Code ApprovalsAppliance Certification Non-Combustible MaterialsYour Fireplace Operating InstructionsHot glass will cause burns Firescreen Seasoned WoodStarting a Fire GrateClear Space Glass DoorsVented Gas Log Sets & Gas Log Lighters Optional ComponentsWood Fuel Creosote Formation and Need for Removal Maintainance and ServiceChimney Inspection/Cleaning Disposal of AshesFrequency As desired Glass CleaningCheck Firebrick Inspect GrateStart Fire Problems Possible Cause Solution Troubleshooting GuideTypical Fireplace System Getting StartedDraft Design and Installation ConsiderationsNegative Pressure Frequently open doors Central heat outlets or returns Locating Fireplace & ChimneyFireplace System Requirements Tools and Supplies NeededInspect Fireplace and Components Select Fireplace Location Framing & ClearancesClearances to Combustible Materials ClearancesFrame the Fireplace Sidewalls/SurroundsPlace Protective Metal Hearth Strips Installation of FireplaceThings to Consider Position the FireplaceFt min. from top of uppermost chimney section to air inlet To service or replace the fan kit Install Outside Air KitChimney Assembly Height of Chimney Components Chimney RequirementsExample Using Offsets/ReturnsInstall Ceiling Firestops Install Chimney Air KitAssemble Chimney Sections Prepare Attic Insulation Shield Install Attic Insulation ShieldCut out Hole in Roof Complete InstallationInstall Flashing Following steps should be skipped if using a chaseFlat Roofs Chimney Termination RequirementsConstruct the Chase Chase InstallationsInstall Chase Top Install Fireplace & ChimneyST375 Square Termination Cap Install Termination CapTS345/TS345P Square Termination Cap Open Top Shroud TR342 caps require radiation shield ShroudsRadiation Shield Field Constructed ShroudsRoofed Style Shroud radiation shield required Mailbox Style Shroud radiation shield requiredHearth Extension Finishing= 1/k x inches of thickness HX3 or HX4 Hearth Ext or equivilent insulation Finishing MaterialCombustible Mantel 13 Side Brick Installation Firebrick InstallationGas Code, Ansi Z223.1 AccessoriesGas Log/Lighter Provision Wood Burning InsertsFireplace Materials1321 mm 406 mm Catalog # Chimney Components14-1/2 10-7/8 276 mm Part number list on following PartsContact Information
Related manuals
Manual 48 pages 59.2 Kb