Hearth and Home Technologies NDV3630L, NDV4236IL Install Floor Cover, Close the Screen Assembly

Page 58

M. Install Floor Cover

Install the floor cover as shown in Figure 14.10.

Figure 14.10 Installing Floor Cover

Note: The floor cover in the bottom front of the fireplace may be covering the UL labels. It is loose and can be removed/

replaced.

N. Fixed Glass Assembly

Removing Fixed Glass Assembly

WARNING! Risk of Asphyxiation! Handle fixed glass assembly with care. Inspect the gasket to ensure it is undamaged and inspect the glass for cracks, chips or scratches.

DO NOT:

Strike, slam or scratch glass

Operate fireplace with glass removed, cracked, broken or scratched.

Replace fixed glass assembly as a complete assembly.

Remove screen.

Pull the four (30/33/36 in. appliances) or seven (42 in. appliance) glass assembly latches out of the groove on the glass frame. Refer to Figure 14.11.

Remove the glass assembly from the appliance.

Latches

(both bottom

and top)

Glass

Assembly

Figure 14.11 Glass Assembly

Replacing Fixed Glass Assembly

Set the glass panel on the lower two or four glass assembly latches, ensuring the glass panel is centered in the opening.

Replace screen.

O. Close the Screen Assembly

Rotate the screen closed. See Figures 14.12 and 14.13.

Figure 14.12 Closing Screen

Figure 14.13 Closing Screen

58

Heatilator • Novus NDV Series • 4055-187 Rev F • 06/08

Image 58
Contents What to do if you smell gas Installation and OperationModels Hot glass will cause burnsCongratulations Homeowner Reference InformationInstaller Guide Table of ContentsUser Guide Troubleshooting Gas Appliance Fireplace Limited Lifetime Warranty Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massacusetts Operating Instructions Gas Fireplace SafetyYour Fireplace Fan Kit optional Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceFor Your Safety Read Before Lighting Ignition IPIStanding Pilot IgnitionFrequently Asked Questions After Appliance is LitGlass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlVenting Maintenance Tasks-Service TechnicianGasket Seal and Glass Assembly Inspection LogsEither cobrahead or SIT Getting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardSelect Appliance Location Framing and ClearancesModel Constructing the Appliance Chase ClearancesMantel and Wall Projections Mantels Mantel Legs or Wall ProjectionsTermination Locations Vent Termination Minimum ClearancesMinimum Clearances for Terminations Measuring Standards Vent Information and DiagramsApproved Pipe Vent Table KeyVent Diagrams Top Vent Horizontal Termination Two 45 ElbowsOne Elbow Two Elbows Top Vent Horizontal TerminationMin Max Three Elbows Top Vent Vertical Termination Install Top Vent Flue Visor No Elbow Configura- tionsNo Elbow 12 ft 3.66 m min 60 ft 18.29 m max Rear Vent Horizontal Termination DVP only One 45 ElbowTwo Elbows Three Elbows Total Vert Total Horiz Model Max Min + H 2 + HRear Vent Vertical Termination DVP only One ElbowMin Ft 1.83 m max 12 ft 3.66 m min 60 ft 18.29 m max Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Model Top Vent Rear VentInstall the Ceiling Firestop Installing Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationAppliance Preparation Top VentRear Vent Secure and Level the Appliance Assemble Vent Sections DVP only Installing Vent PipeAttach Vent to the Firebox Assembly Assemble Pipe SectionsAssemble MI Sections DVP only Assemble Vent Sections SLP Pipe OnlyCut from this end Outer Inner Assemble Slip Sections Slip Section Pilot HolesSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing 15 Minimum Height From Roof To Lowest Discharge OpeningInstall RF4-8 SLP-FSInstall Vertical Termination Cap Assemble and Install Storm CollarInstall Heat Shields and Horizontal Termi Nation Cap Heat Shield Requirements for Horizontal Termi- nationInstall Horizontal Termination Cap InteriorGas Pressure Gas InformationFuel Conversion Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsStanding Pilot Ignition System Wiring Optional Accessories RequirementsElectrical Service and Repair WSK-MLT-HTLJunction Box Installation Wall Switch Installation for Fan OptionalFinishing MantelsNoncombustible Facing Diagram Facing MaterialAppliance Setup Place the Vermiculite Place the RockwoolPlace the Lava Rock Remove Screen ProtectorInstall Hood Unpackage the Hood & Floor CoverRemoving Fixed Glass Assembly Install Floor CoverClose the Screen Assembly Replacing Fixed Glass AssemblyAir Shutter Setting 14 Adjusting Air ShutterSymptom Possible Causes Corrective Action TroubleshootingStanding Pilot Ignition System Troubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Will not ignite. If the pilot Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP PipeExtended Heat Shield RF6M RF12MDVP-TVHW DVP-TRAP Horizontal Termination CapDVP-HRC-ZC-SS Effective SLK-SNKD SLP-CCS-BK Service Parts NDV3630 & NDV3630I PartsStanding Pilot Valve IPI ValveService Parts NDV3933 & NDV3933I 187 Service Parts NDV4236 & NDV4236I 4055-187 Service Parts NDV4842 & NDV4842I Stocked Optional Components Model # DescriptionWTB36 This page intentionally left blank This page intentionally left blank Contact Information