RECOMMENDED BRUSH* SIZE FOR PRIMER

 

AND CEMENT APPLICATIONS

 

Nominal Pipe

 

Size Brush Width

 

(IPS)

 

(INS.)

 

2

 

1-1/2

 

3

 

1-1/2 - 2-1/2

 

*USE ONLY NATURAL BRISTLE

 

3. MAKING THE JOINT

 

A. Cutting

Pipe must be squarely cut to allow for the proper interfacing of the pipe end and the fitting socket bottom. This can be accomplished with a miter box saw or wheel type cutter. Wheel type cutters are not generally recommended for larger diameters since they tend to flare the corner of the pipe end. If this type of cutter is used, the flare on the end must be completely removed.

NOTE: Power saws should be specifically designed to cut plastic pipe.

STEP A

B.Deburring

Use a knife, plastic pipe deburring tool, or file to remove burrs from the end of small diameter pipe. Be sure to remove all burrs from around the inside as well as the outside of the pipe. A slight chamfer (bevel) of about 10°-15° should be added to the end to permit easier insertion of the pipe into the end of the fitting. Failure to chamfer the edge of the pipe may remove cement from the fitting socket, causing the joint to leak.

STEP B

C.Test dry fit of the joint

Tapered fitting sockets are designed so that an interfaced fit should occur when the pipe is inserted about 1/3 to 2/3 of the way into the socket. Occasionally, when pipe fitting dimensions are at the tolerance extremes, it will be possible to fully insert dry pipe to the bottom of the fitting socket. When this happens, a sufficient quantity of cement must be applied to the joint to fill the gap between the pipe and fitting. The gap must be filled to obtain a strong, leak-free joint.

D.Inspection, cleaning, priming

Visually inspect the inside of the pipe and fitting sockets and remove all dirt, grease or moisture with a clean dry rag. If wiping fails to clean the surfaces, a chemical cleaner must be used. Check for possible damage such as splits or cracks and replace if necessary.

Depth-of-entry

Marking the depth of entry is a way to check if the pipe has reached the bottom of the fitting socket in Step F. Measure the fitting depth and mark this distance on the pipe O.D. You may want to add several inches to the distance and make a second mark as the primer and cement will most likely destroy your first one.

Apply primer to the surface of the pipe and fitting socket with a natural bristle brush (see chart on page 11). This process softens and prepares the PVC or CPVC for the solvent cementing step. Move quickly and without hesitation to the cementing procedure while the surfaces are still wet with primer.

E.Application of solvent cement

Apply the solvent cement evenly and quickly around the outside of the pipe at a width a little greater than the depth of the fitting socket.

Apply a light coat of cement evenly around the inside of the fitting socket. Avoid puddling.

Apply a second coat of cement to the pipe end.

NOTE: Cans of cement and primer should be closed at all times when not in use to prevent evaporation of chemicals and hardening of cement. They are also very flammable and should be kept away from heat or flame.

STEP E

F. Joint assembly

Working quickly, insert the pipe into the fitting socket bottom and give the pipe or fitting a 1/4" turn to evenly distribute the cement. Do not continue to rotate the pipe after it has hit the bottom of the fitting socket. A good joint will have sufficient cement to make a bead all the way around the outside of the fitting hub. The fitting will have a tendency to slide back while the cement is still wet so hold the joint together for about 15 seconds.

STEP F

11

Image 11
Contents Residential GAS Water Heaters With HOT Surface Ignition Or 3 PVC Vent Capability Replacement Parts and Deliming ProductsLiquid Petroleum Models External DamageChemical Vapor Corrosion Improper CombustionGrounding High Altitude InstallationRequired Ability GeneralGAS Connections Water ConnectionsWater Potable Heating and Space Closed Water SystemVent Pipe Termination Vent Terminal InstallationRelief Valve P-FIG VentingVent Hoods MAY be Extremely HOT During Operation Sequence of InstallationPage Maximum Pipe Installation of Vent SystemVent Pipe Preparation Vertical Vent Through RoofVertical Vent Termination Restrictions Recommended BRUSH* Size for Primer Filling Cleanup and joint movementDo not TRY to Light the Burner by Hand What to do if YOU Smell GASTemperature Setting C Burns on Adult Skin Temperature RegulationMain Burner -FIG High Temperature Limit SwitchMake sure gas and electric power are connected properly Water Heating Ignition SequenceCondensation Blower Assembly MaintenanceVenting System ValveWater Heater Control LED Status Problem Solution Trouble ShootingCondensation HOT WaterVent Pipe TOO HOT Yellow FlameLimitation on Implied Warranties Service and Labor ResponsibilityClaim Procedure Conditions and ExceptionsLindahl Parkway Ashland CITY, TN