State Industries SBD85500PE, SBD85500NE MULTI-FLUE 4 Units with Vertical Storage Tank

Page 47

LEGEND

MULTI-FLUE (4 UNITS) WITH VERTICAL STORAGE TANK

WARNING: THIS DRAWING SHOWS SUGGESTED PIPING CONFIGURATION AND OTHER DEVICES; CHECK WITH LOCAL CODES AND ORDINANCES FOR ADDITIONAL REQUIREMENTS.

PIPE T&P TO OPEN DRAIN

TEMPERATURE & PRESSURE RELIEF VALVE

PRESSURE RELIEF VALVE

CIRCULATING PUMP

TANK TEMPERATURE CONTROL

DRAIN

HOT WATER

TO FIXTURES

FULL PORT BALL VALVE

CHECK VALVE

TEMPERATURE GAGE

WATER FLOW SWITCH

 

PIPE T&P TO

PIPE T&P TO

PIPE T&P TO

47

OPEN DRAIN

OPEN DRAIN

OPEN DRAIN

 

 

 

HEATER

HEATER

HEATER

HEATER

PIPE T&P TO

 

 

 

OPEN DRAIN

 

 

 

FINISHED FLOOR

STORAGE TANK

HOT WATER

RETURN

ALT. COLD WATER

CONNECTIONCOLD WATER SUPPLY

EXPANSION

TANK

NOTES:

1.Preferred piping diagram.

2.The temperature and pressure relief valve setting shall not exceed pressure rating of any component in the system.

3.Service valves are shown for servicing unit. However, local codes shall govern their usage.

4.The Tank Temperature Control should be wired to and control the pump between the water heater(s) and the storage tank(s).

5.The water heater’s operating thermostat should be set 5 degrees F higher than the Tank Temperature Control.

Image 47
Contents Commercial gas water heaters Table Of Contents Asme CRN Safe Installation, Use and ServiceFire and Explosion Hazard General Safety InformationHydrogen Gas Flammable PrecautionsGrounding Instructions Qualifications IntroductionAbbreviations Used Features and components GAS and Electrical Characteristics Installation considerationsRough In Dimensions TOP View ROUGH-IN-DIMENSIONSModel Right Left Back Ceiling Side Locating the Water HeaterClearances Circulation Pumps Installation On Combustible FlooringInsulation Blanket Hard WaterNatural Gas Installations Propane InstallationsHigh Altitude Installations Gas Pressure Requirements Installation RequirementsPower Supply Water Temperature Controland Mixing ValvesThermal Expansion Temperature-Pressure Relief ValveDishwashing Machines Closed Water SystemsAir Requirements Contaminated AirVent Adapter VENTING InstallationUnconfined Space Confined SpaceOutdoor Air Through One Opening Multiple Heater ManifoldFresh Air Openings For Confined Spaces Outdoor Air Through Two OpeningsAir From Other Indoor Spaces Outdoor Air Through Two Vertical DuctsMultiple Gas Fired Tank-Type Heaters Technical Data VentingValve Discharge Pipe Water heater installationWater Line Connections Code Restrictions Installation Diagrams Top Inlet/Outlet UsageHeater Wiring GAS Supply Pipe Length Feet Gas PipingPurging Gas Pressure RegulatorFilling AdjustmentsGeneral Lighting & Operation Label For Your Safety Read Before OperatingMain Burner Check the Igniter AssemblyIgniter Assembly Check VentingChecking the Input MAINTENANCERemote Storage Tank Temperature Control Temperature-Pressure Relief Valve TestTo Drain the Water Heater Storage Tank Hot Water OdorAnode Rod Inspection Draining and FlushingDeliming Solvents Tank Cleanout ProcedureDeliming Using Flo-Jug Method Chemical Hazard For your information AIR in HOT Water Faucets High Water Temperature Shut OFF SystemSequence of Operation Flow Chart Complaint Cause Remedy User Service Agent Operational checklistWater Piping DiagramsTemperature & Pressure Temperature & Pressure Relief Valve Circulating Pump Multi Flue 2 Units Multi Flue 2 Units with Vertical Storage Tank Multi Flue 2 Units with Vertical Storage Tank Return from Multi Flue 2 Units TWO Temperature Multi Flue 2 Units with Booster TWO Temperature MULTI-FLUE 3 Units MULTI-FLUE 3 Units with Vertical Storage Tank MULTI-FLUE 3 Units with Horizontal Storage Tank Multi Flue Flue 4 Units MULTI-FLUE 4 Units with Vertical Storage Tank MULTI-FLUE 4 Units with Horizontal Storage Tank Manifold Kits Limited Warranty