State Industries SBD85500PE, SBD85500NE instruction manual MULTI-FLUE 3 Units

Page 43

MULTI-FLUE (3 UNITS)

WARNING: THIS DRAWING SHOWS SUGGESTED

PIPING CONFIGURATION AND OTHER DEVICES;

CHECK WITH LOCAL CODES AND ORDINANCES

FOR ADDITIONAL REQUIREMENTS.

HOT WATER

TO FIXTURES

43

PIPE T&P TO

OPEN DRAIN

PIPE T&P TO

PIPE T&P TO

OPEN DRAIN

OPEN DRAIN

NOTES:

1.Preferred piping diagram.

2.The temperature and pressure relief valve setting shall not exceed pressure rating of any component in the system.

3.Service valves are shown for servicing unit. However, local codes shall govern their usage.

LEGEND

TEMPERATURE & PRESSURE

RELIEF VALVE

PRESSURE RELIEF VALVE

CIRCULATING PUMP

TANK TEMPERATURE CONTROL

DRAIN

COLD WATER

SUPPLY

EXPANSION

TANK

FULL PORT BALL VALVE

CHECK VALVE

TEMPERATURE GAGE

WATER FLOW SWITCH

HOT WATER

RETURN

Image 43
Contents Commercial gas water heaters Table Of Contents Asme CRN Safe Installation, Use and ServiceFire and Explosion Hazard General Safety InformationGrounding Instructions PrecautionsHydrogen Gas Flammable Abbreviations Used IntroductionQualifications Features and components GAS and Electrical Characteristics Installation considerationsRough In Dimensions TOP View ROUGH-IN-DIMENSIONSClearances Locating the Water HeaterModel Right Left Back Ceiling Side Circulation Pumps Installation On Combustible FlooringInsulation Blanket Hard WaterHigh Altitude Installations Propane InstallationsNatural Gas Installations Gas Pressure Requirements Installation RequirementsPower Supply Water Temperature Controland Mixing ValvesThermal Expansion Temperature-Pressure Relief ValveDishwashing Machines Closed Water SystemsAir Requirements Contaminated AirVent Adapter VENTING InstallationUnconfined Space Confined SpaceOutdoor Air Through One Opening Multiple Heater ManifoldFresh Air Openings For Confined Spaces Outdoor Air Through Two OpeningsAir From Other Indoor Spaces Outdoor Air Through Two Vertical DuctsMultiple Gas Fired Tank-Type Heaters Technical Data VentingWater Line Connections Water heater installationValve Discharge Pipe Code Restrictions Installation Diagrams Top Inlet/Outlet UsageHeater Wiring GAS Supply Pipe Length Feet Gas PipingPurging Gas Pressure RegulatorGeneral AdjustmentsFilling Lighting & Operation Label For Your Safety Read Before OperatingMain Burner Check the Igniter AssemblyIgniter Assembly Check VentingChecking the Input MAINTENANCERemote Storage Tank Temperature Control Temperature-Pressure Relief Valve TestTo Drain the Water Heater Storage Tank Hot Water OdorAnode Rod Inspection Draining and FlushingDeliming Using Flo-Jug Method Tank Cleanout ProcedureDeliming Solvents Chemical Hazard For your information AIR in HOT Water Faucets High Water Temperature Shut OFF SystemSequence of Operation Flow Chart Complaint Cause Remedy User Service Agent Operational checklistWater Piping DiagramsTemperature & Pressure Temperature & Pressure Relief Valve Circulating Pump Multi Flue 2 Units Multi Flue 2 Units with Vertical Storage Tank Multi Flue 2 Units with Vertical Storage Tank Return from Multi Flue 2 Units TWO Temperature Multi Flue 2 Units with Booster TWO Temperature MULTI-FLUE 3 Units MULTI-FLUE 3 Units with Vertical Storage Tank MULTI-FLUE 3 Units with Horizontal Storage Tank Multi Flue Flue 4 Units MULTI-FLUE 4 Units with Vertical Storage Tank MULTI-FLUE 4 Units with Horizontal Storage Tank Manifold Kits Limited Warranty