State Industries SBD85500NE, SBD85500PE instruction manual Sequence of Operation Flow Chart

Page 32

Sequence of Operation Flow Chart

Description of this flow chart can be found in the “SEQUENCE OF OPERATION” section found on page 23.

FIGURE 29

32

Image 32
Contents Commercial gas water heaters Table Of Contents Safe Installation, Use and Service Asme CRNGeneral Safety Information Fire and Explosion HazardHydrogen Gas Flammable PrecautionsGrounding Instructions Qualifications IntroductionAbbreviations Used Features and components Installation considerations Rough In DimensionsTOP View ROUGH-IN-DIMENSIONS GAS and Electrical CharacteristicsModel Right Left Back Ceiling Side Locating the Water HeaterClearances Installation On Combustible Flooring Insulation BlanketHard Water Circulation PumpsNatural Gas Installations Propane InstallationsHigh Altitude Installations Installation Requirements Power SupplyWater Temperature Controland Mixing Valves Gas Pressure RequirementsTemperature-Pressure Relief Valve Dishwashing MachinesClosed Water Systems Thermal ExpansionContaminated Air Air RequirementsVENTING Installation Unconfined SpaceConfined Space Vent AdapterMultiple Heater Manifold Fresh Air Openings For Confined SpacesOutdoor Air Through Two Openings Outdoor Air Through One OpeningOutdoor Air Through Two Vertical Ducts Air From Other Indoor SpacesTechnical Data Venting Multiple Gas Fired Tank-Type HeatersValve Discharge Pipe Water heater installationWater Line Connections Installation Diagrams Top Inlet/Outlet Usage Code RestrictionsHeater Wiring Gas Piping PurgingGas Pressure Regulator GAS Supply Pipe Length FeetFilling AdjustmentsGeneral For Your Safety Read Before Operating Lighting & Operation LabelCheck the Igniter Assembly Igniter AssemblyCheck Venting Main BurnerMAINTENANCE Remote Storage Tank Temperature ControlTemperature-Pressure Relief Valve Test Checking the InputHot Water Odor Anode Rod InspectionDraining and Flushing To Drain the Water Heater Storage TankDeliming Solvents Tank Cleanout ProcedureDeliming Using Flo-Jug Method Chemical Hazard For your information High Water Temperature Shut OFF System AIR in HOT Water FaucetsSequence of Operation Flow Chart Operational checklist Complaint Cause Remedy User Service AgentDiagrams Water PipingTemperature & Pressure Temperature & Pressure Relief Valve Circulating Pump Multi Flue 2 Units Multi Flue 2 Units with Vertical Storage Tank Multi Flue 2 Units with Vertical Storage Tank Return from Multi Flue 2 Units TWO Temperature Multi Flue 2 Units with Booster TWO Temperature MULTI-FLUE 3 Units MULTI-FLUE 3 Units with Vertical Storage Tank MULTI-FLUE 3 Units with Horizontal Storage Tank Multi Flue Flue 4 Units MULTI-FLUE 4 Units with Vertical Storage Tank MULTI-FLUE 4 Units with Horizontal Storage Tank Manifold Kits Limited Warranty