State Industries SBD85500PE, SBD85500NE instruction manual Heater Wiring

Page 21

Heater Wiring

All electrical work must be installed in accordance with the latest version of the National Electrical Code ANSI/NFPA No. 70 and must conform to all local code authority having jurisdiction. AN ELECTRICAL GROUND IS REQUIRED TO REDUCE RISK OF ELECTRICAL SHOCK OR POSSIBLE ELECTROCUTION.

If any of the original wire as supplied with the appliance must be replaced, use only type 105°C thermoplastic or equivalent and 2500C type F must be used for the flame sensor and igniter leads.

The controls of this water heater are polarity sensitive. Be certain to properly wire the hot and neutral connections.

FIGURE 20

21

Image 21
Contents Commercial gas water heaters Table Of Contents Asme CRN Safe Installation, Use and ServiceFire and Explosion Hazard General Safety InformationPrecautions Grounding InstructionsHydrogen Gas Flammable Introduction Abbreviations UsedQualifications Features and components Rough In Dimensions Installation considerationsTOP View ROUGH-IN-DIMENSIONS GAS and Electrical CharacteristicsLocating the Water Heater ClearancesModel Right Left Back Ceiling Side Insulation Blanket Installation On Combustible FlooringHard Water Circulation PumpsPropane Installations High Altitude InstallationsNatural Gas Installations Power Supply Installation RequirementsWater Temperature Controland Mixing Valves Gas Pressure RequirementsDishwashing Machines Temperature-Pressure Relief ValveClosed Water Systems Thermal ExpansionAir Requirements Contaminated AirUnconfined Space VENTING InstallationConfined Space Vent AdapterFresh Air Openings For Confined Spaces Multiple Heater ManifoldOutdoor Air Through Two Openings Outdoor Air Through One OpeningAir From Other Indoor Spaces Outdoor Air Through Two Vertical DuctsMultiple Gas Fired Tank-Type Heaters Technical Data VentingWater heater installation Water Line ConnectionsValve Discharge Pipe Code Restrictions Installation Diagrams Top Inlet/Outlet UsageHeater Wiring Purging Gas PipingGas Pressure Regulator GAS Supply Pipe Length FeetAdjustments GeneralFilling Lighting & Operation Label For Your Safety Read Before OperatingIgniter Assembly Check the Igniter AssemblyCheck Venting Main BurnerRemote Storage Tank Temperature Control MAINTENANCETemperature-Pressure Relief Valve Test Checking the InputAnode Rod Inspection Hot Water OdorDraining and Flushing To Drain the Water Heater Storage TankTank Cleanout Procedure Deliming Using Flo-Jug MethodDeliming Solvents Chemical Hazard For your information AIR in HOT Water Faucets High Water Temperature Shut OFF SystemSequence of Operation Flow Chart Complaint Cause Remedy User Service Agent Operational checklistWater Piping DiagramsTemperature & Pressure Temperature & Pressure Relief Valve Circulating Pump Multi Flue 2 Units Multi Flue 2 Units with Vertical Storage Tank Multi Flue 2 Units with Vertical Storage Tank Return from Multi Flue 2 Units TWO Temperature Multi Flue 2 Units with Booster TWO Temperature MULTI-FLUE 3 Units MULTI-FLUE 3 Units with Vertical Storage Tank MULTI-FLUE 3 Units with Horizontal Storage Tank Multi Flue Flue 4 Units MULTI-FLUE 4 Units with Vertical Storage Tank MULTI-FLUE 4 Units with Horizontal Storage Tank Manifold Kits Limited Warranty