Drolet CS1200 manual Stove pipe, Suitable lengths of stove pipe

Page 13
•Suitable lengths of stove pipe

Stove pipe

Suitable lengths of stove pipe

1- Place your stove where you would like it located and use a plumb line to mark the ceiling directly above your stove flue. You will probably have to adjust this position slightly to ensure that your chimney will run between the joists. You can use a stud finder to locate the joists. You also need to take into account the minimum clearances to combustible materials. After you have determined where the chimney will go through the ceiling, use a spoke saw or power jig saw to cut a hole, remembering that you need a minimum 2-inch clearance between the chimney and any combustible materials. Depending on whether you have a one or two story structure, you will need to cut a matching hole through the floor of the attic or second floor living space.

2- Before you install the ceiling support, you need to frame the area.

3- To install the ceiling support, just slide the assembly into the framed opening from below. Once you ensure that the finishing plate is flush with the underside of the ceiling and assembly is level, secure it with screws.

13

Image 13
Contents WOOD STOVE MANUAL 1700, Léon-Harmel Québec Qc Canada G1N 4R9 Tel FaxSTOVE BUILDER INTERNATIONAL 29/08/2005INSTALLATION OF YOUR DROLET WOOD STOVE TABLE OF CONTENTSBAFFLE BRICK INSTALLATION SAWMAN STOVE ONLY THE DROLET WOOD STOVE MANUALWOOD HEATING INTRODUCTION THE DROLET WOOD STOVE MANUALTHE CONTROLLED COMBUSTION WOOD STOVE KEEP THIS INSTRUCTION MANUAL FOR FUTURE REFERENCE1- Mount the 4 legs using 2 screws per leg ASSEMBLING THE STOVE2- Mount the ash lip with two screws 4- Bend the heat shield slightly to make it fit between the back legsINSTALLING THE FIREBRICKS POSITIONING THE STOVE INSTALLATION OF YOUR DROLET WOOD STOVEFLOOR PROTECTION ModelsCLEARANCES CLEARANCES TO COMBUSTIBLE MATERIALSModel Back WallFOR BARON 1880SP & 2000SP USING THE ENVELOPE INSTALLATION OF A HEAT RADIATION SHIELDTYPE OF PROTECTION SIDES ANDCHIMNEY STEP BY STEP INSTALLATION OF YOUR CHIMNEYWALL SUPPORT SYSTEM ChimneyStove pipe Page CEILING SUPPORT SYSTEM Suitable lengths of stove pipe Page COUPLINGS Page AIR CIRCULATION SYSTEM EXTERIOR AIR INTAKEA Rear Wall Connection B Floor ConnectionBAFFLE BRICK INSTALLATION SAWMAN STOVE ONLY FUEL OPERATING YOUR DROLET WOOD STOVEAVERAGE ENERGY YIELD OF ONE AIR DRIED CORD OF CUT WOOD High Energy YieldBefore your first fire IGNITIONHEATING MAINTENANCE OF THE STOVE MAINTENANCE OF THE HEATING SYSTEMMAINTENANCE OF THE CHIMNEY PROCEDURES IN CASE OF FIREIN CASE OF FIRE CALL IMMEDIATELY THE FIRE DEPARTMENTWHAT DO THE WORDS “DRAFT” AND “NEGATIVE PRESSURE” MEAN? FREQUENTLY ASKED QUESTIONSDRAWING #1 DRAWING #2 DRAWING #3 DRAWING #4 DRAWING #5 WHEN DO IN NEED TO REPLACE THE FIREBRICKS? CAN I MODIFY MY STOVE TO INSTALL A GLASS DOOR?WARRANTY APPLICATION LIMITED LIFETIME WARRANTYPARTS LABOUR