Drolet CS1200 manual Procedures In Case Of Fire, Maintenance Of The Chimney

Page 23

MAINTENANCE OF THE CHIMNEY

Whether you have a prefab or masonry chimney, you must conduct a visual inspection at least once a month in order to be sure that it is in good shape and that there is no excessive creosote build-up. If there is the slightest crack, or undulation of the interior or exterior surface of the chimney, repairs or replacements of defective parts must be carried out without delay.

You should do at least one chimney sweeping per year, or more if your visual inspection reveals creosote deposits exceeding 1\4" (6 mm). It is important to remove all creosote which has been detached with the sweeping brush, in order to prevent if from igniting when you start your next fire.

PROCEDURES IN CASE OF FIRE

IN CASE OF FIRE:

POSITION THE AIR INTAKE OF THE STOVE AT THE MINIMUM TO DEPRIVE IT FROM OXYGEN.

CALL IMMEDIATELY THE FIRE DEPARTMENT.

IF YOU HAVE A FIRE EXTINGUISHER, USE IT.

IF THE FIRE AND THE SMOKE PREVENT YOU FROM APPROACHING THE STOVE, TELL ALL THE OCCUPANTS OF THE HOUSE TO IMMEDIATELY GO OUTSIDE AND LEAVE THE HOUSE.

23

Image 23
Contents 29/08/2005 1700, Léon-Harmel Québec Qc Canada G1N 4R9 Tel FaxWOOD STOVE MANUAL STOVE BUILDER INTERNATIONALTHE DROLET WOOD STOVE MANUAL TABLE OF CONTENTSINSTALLATION OF YOUR DROLET WOOD STOVE BAFFLE BRICK INSTALLATION SAWMAN STOVE ONLYKEEP THIS INSTRUCTION MANUAL FOR FUTURE REFERENCE INTRODUCTION THE DROLET WOOD STOVE MANUALWOOD HEATING THE CONTROLLED COMBUSTION WOOD STOVE4- Bend the heat shield slightly to make it fit between the back legs ASSEMBLING THE STOVE1- Mount the 4 legs using 2 screws per leg 2- Mount the ash lip with two screwsINSTALLING THE FIREBRICKS Models INSTALLATION OF YOUR DROLET WOOD STOVEPOSITIONING THE STOVE FLOOR PROTECTIONBack Wall CLEARANCES TO COMBUSTIBLE MATERIALSCLEARANCES ModelSIDES AND INSTALLATION OF A HEAT RADIATION SHIELDFOR BARON 1880SP & 2000SP USING THE ENVELOPE TYPE OF PROTECTIONChimney STEP BY STEP INSTALLATION OF YOUR CHIMNEYCHIMNEY WALL SUPPORT SYSTEMStove pipe Page CEILING SUPPORT SYSTEM Suitable lengths of stove pipe Page COUPLINGS Page B Floor Connection EXTERIOR AIR INTAKEAIR CIRCULATION SYSTEM A Rear Wall ConnectionBAFFLE BRICK INSTALLATION SAWMAN STOVE ONLY High Energy Yield OPERATING YOUR DROLET WOOD STOVEFUEL AVERAGE ENERGY YIELD OF ONE AIR DRIED CORD OF CUT WOODBefore your first fire IGNITIONHEATING MAINTENANCE OF THE STOVE MAINTENANCE OF THE HEATING SYSTEMCALL IMMEDIATELY THE FIRE DEPARTMENT PROCEDURES IN CASE OF FIREMAINTENANCE OF THE CHIMNEY IN CASE OF FIREWHAT DO THE WORDS “DRAFT” AND “NEGATIVE PRESSURE” MEAN? FREQUENTLY ASKED QUESTIONSDRAWING #1 DRAWING #2 DRAWING #3 DRAWING #4 DRAWING #5 WHEN DO IN NEED TO REPLACE THE FIREBRICKS? CAN I MODIFY MY STOVE TO INSTALL A GLASS DOOR?LABOUR LIMITED LIFETIME WARRANTYWARRANTY APPLICATION PARTS