England's Stove Works 55-TRP22E, 55-SHP22E, 25-PDV Illustration 2b Control Board Diagram Wiring

Page 16

Illustration 2b

Control Board

Diagram

(Wiring)

CAUTION: Moving Parts May Cause Injury.

Do NOT Operate with Panel(s) Off.

DANGER: Parts May Be Hot. Risk of Electric Shock.

Disconnect Power Before Servicing Unit.

Notes on termination of Pellet Vent Pipe (see also “FLUE SYSTEM” section of manual):

1.Not less than three (3) feet above any forced air inlet located within ten (10) feet.

2.Not less than four (4) feet below, four (4) feet horizontally from, or one (1) foot above any door, window or gravity air inlet into any building.

3.Not less than two (2) feet from an adjacent building, and not less than seven (7) feet above grade where

located adjacent to public walkways.

The exhaust exit shall be arranged so that the flue gases are not directed so that it will affect people, overheat combustible structures, or enter buildings. Forced draft systems and all parts of induced draft systems under positive pressure during operation shall be installed gastight or to prevent leakage of combustion products into a building. Through-the-wall vents shall not terminate over public walkways, or where condensate or vapor could create hazards or a nuisance.

Be sure to follow local codes and all manufacturer’s instructions (including exhaust pipe). Consult a

professional installer and/or call Customer Service if you have any questions.

IMPORTANT SAFETY NOTE: If the unit or chimney connector pipe “glows” red (or white), the stove is over-fired. This condition could cause a house or chimney fire. Do not operate your unit too hot, or over-firing may result.

Image 16
Contents PDVE, 55-SHP22E, and 55-TRP22E Be maintainedLetter from our Technical Support department Important Information Unit Preparation Page Pellet Vent Pipe Flue SystemThrough the Wall Mobile Home Installation Through the CeilingExisting Flue System Outside Air Outside Combustion Air IntakeFloor Protection Floor and Wall ProtectionWall Protection START- UP Procedure Operating InstructionsHorizontal Feed System Manually Starting Your UnitSHUT-DOWN Procedure CodesDaily Operation Page Maintenance Annual Cleaning Auger Motors Auger Bearings and Auger ShaftsVacuum Switch Convection BlowerCombustion Blower GasketsControl Board Recommended Heat RangesIllustration 2b Control Board Diagram Wiring Accessory Items ThermostatsAC-103, AC-103BN Lip Trim AC-106-P SH-106-P, AC-106-PBN Window TrimReplacement PARTS, Accessories and Options Customer Service DepartmentOptions Box Parts Orders only Monroe, VA Questions 800-245-6489 FaxPellet Stove Exploded View Diagram Hopper LID Latches TROUBLE-SHOOTING Guide Problem Cause SolutionProcedure Five Year PeriodThree Year Period One Year PeriodDealer Information Unit Information
Related manuals
Manual 25 pages 56.18 Kb