England's Stove Works 55-TRP22E, 55-SHP22E, 25-PDVE operation manual

Page 5

touch pad. This will start the upper auger, bottom auger and exhaust

blower. The room air blower will start later as the stove reaches the pre-set blower temperature (see “Control Board” section for further explanation).

5. Check to be sure both augers and the exhaust blower are operating before connecting the unit to the flue system. Be sure to “dry run” your unit for 20 minutes

before connecting it to the flue (it should stop automatically after 20 minutes).

Proper Impingement (Baffle) Plate Placement

in Pellet Stove Firebox

Occasionally in shipping, the impingement (baffle) plate may shift out of its proper position. If this is the case with your stove, follow these instructions to return the plate to its proper position.

1.Remove the plate from the stove, holding the plate by its tab handle, with the cutout notch facing upwards.

2.Turn the notched end into the doorway (as shown above), and lift the plate up to allow the bottom of the plate to fit in the doorway.

3.Let the bottom of the plate rest on the firebox, and then push the bottom of the plate flush against the back wall of the firebox. At this point, the plate will lean forward (toward the front of the stove) slightly, and will come in contact with the front of the stove above the door.

4.Finally, center the plate on the firebox, so that it will be centered above the fire when the stove is in operation.

Customer Service: (800) 245-6489

www.englandsstoveworks.com

Image 5
Contents Be maintained PDVE, 55-SHP22E, and 55-TRP22ELetter from our Technical Support department Important Information Unit Preparation Page Through the Wall Flue SystemPellet Vent Pipe Through the Ceiling Mobile Home InstallationExisting Flue System Outside Air Outside Combustion Air IntakeWall Protection Floor and Wall ProtectionFloor Protection Operating Instructions START- UP ProcedureHorizontal Feed System Manually Starting Your UnitCodes SHUT-DOWN ProcedureDaily Operation Page Annual Cleaning MaintenanceAuger Motors Auger Bearings and Auger ShaftsConvection Blower Vacuum SwitchCombustion Blower GasketsRecommended Heat Ranges Control BoardIllustration 2b Control Board Diagram Wiring Thermostats Accessory ItemsAC-103, AC-103BN Lip Trim AC-106-P SH-106-P, AC-106-PBN Window TrimCustomer Service Department Replacement PARTS, Accessories and OptionsOptions Box Parts Orders only Monroe, VA Questions 800-245-6489 FaxPellet Stove Exploded View Diagram Hopper LID Latches Problem Cause Solution TROUBLE-SHOOTING GuideFive Year Period ProcedureThree Year Period One Year PeriodUnit Information Dealer Information
Related manuals
Manual 25 pages 56.18 Kb