England's Stove Works 55-TRP22E, 55-SHP22E, 25-PDVE operation manual Important Information

Page 3

IMPORTANT INFORMATION

1.Check local installation codes for your area. Call your Homeowner’s Insurance representative for inspection of your stove’s installation.

2.Read and comply with the instructions in this manual.

3.This unit should be tested (dry run) before loading pellets for 20 minutes. The stove should automatically shut itself off after the 20-minute dry run.

4.Your stove is designed to burn Premium Pellets. Pellets with high ash content will burn dirty and require the unit to be cleaned more often.

5.Be sure your pellets are not damp or wet. Keep sawdust out of the unit.

6.Use three-inch (3”) U.L.-approved PELLET VENT TWIST-LOCK PIPE when installing this stove and follow the manufacturer’s specifications for installation and clearances (we highly recommend Simpson Dura-Vent pellet twist-lock pipe). Even though this pipe interlocks, it is a good idea to seal all connections with high temperature silicone. Use at least three screws to secure the pipe to this unit’s exhaust blower. Also, if you do not use U.L.-approved twist-lock pellet pipe, be sure to use U.L.-approved Pellet Vent pipe, and fasten each joint of the pipe with at least three screws.

7.Outside combustion air is mandatory for these units to work properly. Make this connection using a 1 7/8” I.D. metal pipe (steel, aluminum or copper) and coupler. Be sure to secure the pipe to the unit with a clamp or aluminum tape. The outside end should be covered (screened) to prevent any foreign matter from entering the system. Try to keep the number of bends in this pipe to a minimum. Our Part Number PU-OAK (Outside Air Kit with flex pipe) can be used. It can be purchased from your dealer, or by calling (800) 516-3636 or logging on to www.englandsstoveworks.com . NOTE: If an older unit, measure the opening to determine what size pipe to use. NOTE: If the total run of the connection exceeds 6’, use 3” metal pipe and coupler instead.

8.Regularly inspect the burn pot area and, if any crust forms, remove it with a poker.

9.The ash in the burn pot should be removed regularly, depending on your burn rate. The area to the right and left of the burn pot is for ash storage; keep the air holes in the burn pot clean for a more efficient burn. Check your exhaust system frequently. Refer to “Ash Removal and Disposal” section.

10.Keep pellets and all other combustible materials a safe distance from the unit.

11.This unit will require floor protection if installed on a combustible surface. The

minimum floor protector for this unit is 36” x 36” which should give you at least six inches (6”) of protection at the rear and each side, and six inches (6”) minimum in the front

of the unit.

12.Horizontal runs should not exceed four feet (4’) with a maximum vertical flue height

of thirty five feet (35’). At fifteen feet (15’), the pipe should be increased to four inch (4”) pellet vent pipe.

IMPORTANT NOTICE: This unit must be properly installed to prevent the possibility of a house fire or “smoke-back.” The instructions must be strictly adhered to.

Do not use makeshift methods or material which may compromise the installation.

Your unit requires periodic maintenance and cleaning (refer to manual). Failure to maintain your unit may lead to a variety of problems, including but not limited to smoke spillage into the home. England’s will not be liable for consequential or indirect damages to property or persons resulting from the use of this product.

Image 3
Contents Be maintained PDVE, 55-SHP22E, and 55-TRP22ELetter from our Technical Support department Important Information Unit Preparation Page Flue System Pellet Vent PipeThrough the Wall Outside Air Outside Combustion Air Intake Mobile Home InstallationThrough the Ceiling Existing Flue SystemFloor and Wall Protection Floor ProtectionWall Protection Manually Starting Your Unit START- UP ProcedureOperating Instructions Horizontal Feed SystemCodes SHUT-DOWN ProcedureDaily Operation Page Auger Bearings and Auger Shafts MaintenanceAnnual Cleaning Auger MotorsGaskets Vacuum SwitchConvection Blower Combustion BlowerRecommended Heat Ranges Control BoardIllustration 2b Control Board Diagram Wiring AC-106-P SH-106-P, AC-106-PBN Window Trim Accessory ItemsThermostats AC-103, AC-103BN Lip TrimBox Parts Orders only Monroe, VA Questions 800-245-6489 Fax Replacement PARTS, Accessories and OptionsCustomer Service Department OptionsPellet Stove Exploded View Diagram Hopper LID Latches Problem Cause Solution TROUBLE-SHOOTING GuideOne Year Period ProcedureFive Year Period Three Year PeriodUnit Information Dealer Information
Related manuals
Manual 25 pages 56.18 Kb