Enviro C-10914 owner manual Conversion instructions Natural Gas

Page 11

Maintenance And Service

Step 8. Install the new pilot injector supplied with this conversion kit. Simply screw the new injector inside the pilot hood and reinstall the hood by placing the hood on the assembly, line up the key way, and snap into place.

Step 9. Remove the main burner orifice with a 1⁄2 inch deep socket.

Step 10. Install the new orifice supplied. Be sure to put a bead of pipe-thread sealant or approved Teflon tape on the orifice before installing into the burner assembly.

Step 11. Re-install burner tray, log set and door. Pay special attention when installing the burner that the venturi adjustment rod is properly installed into the venturi adjustment piece welded to the

burner venturi tube. Also refer to SECONDARY INSTALLATION - INSTALLING LOG SET AND EMBERS.

Step 12. Open the shut-off valve at the gas line to the unit.

Step 13. Use a small brush to apply a warm soapy water solution to all gas connections (use a half dish soap and half warm water). If a gas leak is present, bubbling will occur. Gas leaks can be repaired by using an approved pipe thread sealant or approved Teflon tape. NEVER USE A NAKED FLAME WHEN TESTING FOR LEAKS.

Step 14. Re-light the fireplace to ensure proper operation and proper flame appearance, refer to Figure 55.

Step 15. MAKE SURE that the sticker provided by S.I.T. is installed, to signify that the valve has been converted to a different fuel type. Also, make sure that the rating plate has a conversion label to show this unit has been converted to a different fuel type.

A VISUAL CHECK OF THE REGULATOR KNOB IS NECESSARY TO DETERMINE WHETHER OR NOT THE REGULATOR IS THE CORRECT PART. A 50% TURN DOWN REGULATOR WILL HAVE ONLY ONE CORNER ON THE KNOB

Conversion Kit should contain the following:

(1) 50% turn down HI/LO regulator with three (3) T-20 Torx screws

(1) Pilot injector

Table 1: Orifice Information.

 

Conversion instructions

 

 

 

 

 

 

Natural Gas

 

Propane

Labels to show conversion

 

 

Pilot Orifice

.62 mm

 

.35 mm

 

 

 

Burner Orifice Top

#39 DMS

 

#53 DMS

 

 

 

 

 

 

Venturi Setting

1/16” min.

 

3/16” min.

11

Image 11 Contents
Westport For Your SafetyGeneral Safety PrecautionsTable of Contents Rear Vent DV Codes And ApprovalsTOP Vent DV Dimensions SpecificationsOperating Instructions For Your Safetyread Before Operating Gas valve Electronic Ignition Module Location Maintenance And ServiceHandles for Removing Door To ReplaceStep To be Installed by a Qualified Service Agency onlyConversion instructions Natural Gas Qualified Installers only Initial InstallationManufacturer Trade Name Nominal Sizes Are Permitted to Reach the Outside Vent Termination Run Common Horizontal Installation Pipes and fittings, are Installing Vent Cap with Vinyl Siding Stand Off Do not interfere with the structural integrity of the walls Wall Framing for Hole for Vertical OnceRoof Pitch Minimum Height Feet Meters Multi-Story Vent Pipe Installation KIT Components Installation InstructionsCut away of spacers on Flex Pipe Fire stop Assembly of Venting into a Class ‘A’ Chimney Screws removed in see Figure Turn the elbow to the rear vent position and re-fasten withInstallation for Top Vented Horizontal Termination Corner InstallationWiring Diagram InstallationVenting of a Fireplace Fitted with the Drafthood Adaptor Canadian InstallationsA. Installations General Venting InformationOptional Finishing Automatic Safety Shut DownSpill Switch Replacement To Test Valve Pressures GAS Line ConnectionWiring Diagram For Fan Control Wire Size Max. LengthOptional Blower Fan Installation Secondary InstallationComplete Log Placement Log Placement with Rock Wool Brick panel bracket, slots shown Problem Possible Cause Solution Trouble ShootingReference Number Part Description Part Number Parts List CastCast Leg Each Painted Parts Diagram Cast Reference Part Description Part Number Parts List ComponentsParts List Components Parts Diagram Components To the Dealer WarrantyInstallation Data Sheet