Delta 78-904, 78-907) Fence Operation, Figs and 25, in the up position when moving the fence

Page 10

FENCE OPERATION

IMPORTANT: Before operating fence, make sure the fence is adjusted parallel to the miter gage slot, as explained later on in this manual.

1.To move the fence along the guide rail, simply lift up clamp lever (A) as shown in Fig. 24, slide fence to desired position on rail, and push down on clamp lever

(A) as shown in Fig. 25, to lock fence in position. NOTE: A magnet (E) Fig. 25, is provided to hold clamp handle

(A) Figs. 24 and 25, in the up position when moving the fence.

2.The distance the fence is positioned away from the blade is indicated by the witness line (B) Fig. 26, located on the cursor (C). If it is necessary to adjust the cursor (C), make a test cut with the fence locked in position. Measure the width of the finished cut and adjust the cursor (C) by loosening the two screws (D), adjusting the cursor (C) until the witness line (B) is aligned with the same marking on the scale as the finished cut. Then tighten the two screws (D).

A

Fig. 24

E

A

Fig. 25

D

C B

Fig. 26

Image 10
Contents Instruction M a N U a L Introduction PackingPage Assembly Instructions Disconnect the S AW F R O M the P O W E R SourcePage As a template Page Page GL G BL K Figs and 25, in the up position when moving the fence Fence OperationAdjusting Fence Parallel to Miter Gage Slots Adjusting Clamping Action O F Fence Locking HandlePARTS, Service or Warranty Assistance Lubrication