www.tradeplumbing.co.uk Call Sales On 08708034288 | |
2.7 CONNECTION OF MAINS | For floor standing models: |
WATER SUPPLY | On the front of the unit there is a label to identify the connection ports. |
| Please check this before making any connection to the unit. |
ST PROTECH 50-80-100
PRESSURE + TEMPERATURE
RELIEF VALVE
COLD
15mm
EXPANSION
VESSEL
COMBINATION
VALVE
HOT SUPPLY
15/22mm
EXPANSION
RELIEF
PIPE
TUNDISH
For units up to 300 litres it is recommended that all mains cold water supply pipe work is a minimum of 22mm, with the exception of model ST 50 ProTech where 15mm can be used. For 500 litre models the supply should be 28mm. An isolating valve should be installed between the cold water supply and the cylinder for servicing. ALL PIPEWORK MUST BE FLUSHED TO AVOID DAMAGE TO THE CONTROL VALVES.
Please refer to FIGS. 2.1, 2.2, 2.3, 2.4, 2.5 for a suggested installation layout.
22mm
MAX. 100mm
FIG. 2.1
STD PROTECH 100
STD/STD PROTECH/ITD 125-150-210-300 DIRECT
| COLD |
| |
COMBINATION | 22mm |
| |
VALVE |
|
| EXPANSION |
| VESSEL |
| PRESSURE + TEMPERATURE |
| RELIEF VALVE |
HOT SUPPLY |
|
22mm |
|
EXPANSION RELIEF |
|
PIPE |
|
SECONDARY |
|
RETURN |
|
TUNDISH |
|
22mm |
|
DRAIN |
|
MAX. 100mm
www.tradeplumbing.co.uk Call Sales On 08708034288FIG. 2.2
6