VENT PIPE PREPARATION
1.INITIAL PREPARATION
A.Make sure the solvent cement you are planning to use is designed for the specific application you are attempting.
B.Know the physical and chemical characteristics and limitations of the PVC, PVC cellular core, ABS or CPVC piping materials that you are about to use.
C.Know the reputation of your pipe and cement manufacturer and their products.
D.Know your own qualifications or those of your contractor. The solvent welding technique of joining PVC, PVC cellular core, ABS or CPVC pipe is a specialized skill just as any other pipe fitting technique.
E.Closely supervise the installation and inspect the finished job before
F.Contact the manufacturer, supplier, or competent consulting agency if you have any questions about the application or installation of PVC, PVC cellular core, ABS or CPVC pipe.
G.Take the time and effort to do a professional job. Shortcuts will only cause you problems and delays in
2.SELECTION OF MATERIALS
PRIMER
It is recommended that Tetrahydrofuran (THF) be used to prepare the surfaces of pipe and fittings for solvent welding. Do not use water, rags, gasoline or any other substitutes for cleaning PVC cellular core, ABS or CPVC surfaces. A chemical cleaner such as MEK may be used.
CEMENT
The cement should be a bodied cement of approximately 500 to 1600 centipoise viscosity containing
SAFETY PRECAUTION: PRIMERS AND CEMENTS ARE EXTREMELY FLAMMABLE AND MUST NOT BE STORED OR USED NEAR HEAT OR OPEN FLAME. ALSO, USE ONLY IN A
CONTROLS AND SWITCHES
The
contacts are normally open. When the fan increases the pressure in the burner, the pressure switch will allow the electrical contacts to close. The pressure switch is connected to the burner tap by a piece of tygon tubing. This tubing must be connected in order for the switch to change the electrical contacts. The controller requires that the electrical contacts on this air flow switch be open before it will allow the blower to come on. See Figure 13.
BLOCKED OUTLET PROVER SWITCH
The Blocked Outlet Prover Switch is set up to shut the unit off when a
BLOCKED INLET PROVER SWITCH
The Blocked Inlet Prover Switch is set up to shut the unit off when a
LOW GAS PRESSURE SWITCH
The Low Gas Switch (LGS) is a
NOTE: LOW GAS SWITCH IS LOCATED ON INLET SIDE OF GAS VALVE. See Figure 13.
FIGURE 13.
BLOWER PROVER SWITCH | ON/OFF SWITCH |
The Blower Prover Switch is provided on the heater to verify that the fan is operating. It is a positive pressure switch whose electrical
The ON/OFF Switch is a