A.O. Smith BTX-80 SERIES 100 Chisel an opening approximately one half inch 1.3 cm larger

Page 23

may be easier to mark both the inside and outside wall. Align holes by

bead of caulking (not supplied) around the gap between the pipe and

drilling a hole through center of the template from the inside through to

cover plate. Apply enough to fill some of the gap between the pipe

the outside. The template can now be positioned on the outside wall

and wall. Place some of the caulking on the back of the plate to hold it

using the drilled hole as a centering point for the template.

against the wall after installation. If the vent pipe is installed up to the

 

wall, with a coupling on the end against the wall opening, the pipe with

3. A) MASONRY SIDE WALLS

the vent terminal can be prepared for gluing before inserting through

Chisel an opening approximately one half inch (1.3 cm) larger

the wall. Slide the pipe through the wall and insert into the coupling on

the other side of the wall, making sure that the vent terminal ends up

than the marked circle.

pointed in the correct position, see Figure 18.

 

B) WOODEN SIDE WALLS

 

Drill a pilot hole approximately one quarter inch (0.64 cm) outside

 

of the marked circle. This pilot hole is used as a starting point

 

for a saws-all or sabre saw blade. Cut around the marked circle

 

staying approximately one quarter inch (0.64 cm) outside of the

 

line. (This will allow the vent to easily slide through the opening.

 

The resulting gap will be covered up by the Vent Terminal cover

 

plate.) Repeat this step on inside wall if necessary.

 

SEQUENCE OF INSTALLATIONS, FIGURE 18

 

Cut a length of PVC pipe about 3.5 inches (8.9 cm) longer than wall

 

thickness at the opening. Glue vent terminal to this section of pipe. Slide

 

the wall plate over the pipe to stop against the vent terminal. Place a

VENT TERMINATION - FIGURE 18.

CAUTION

LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING CONTROLS. WIRING ERRORS CAN CAUSE IMPROPER AND DANGEROUS OPERATION. VERIFY PROPER OPERATION AFTER SERVICING.

POWER VENT WIRING SCHEMATIC - FIGURE 19.

23

Image 23
Contents 197086-004 Power Vented GAS Models W/HOT Surface IgnitionWhenever maintenance adjustment or service is required PrintedImportant Definitions Safe INSTALLATION, USE and ServiceApprovals General Safety Information General Safety Information Introduction Table of ContentsExemptions Installation of Carbon Monoxide DetectorsApproved Carbon Monoxide Detectors SignageElbow Access Door Typical InstallationReplacement Parts and Deliming Products Condensate Hose and Drain PAN Mixing Valves Recovery capacity based on 90% thermal efficiency ROUGH-IN-DIMENSIONSRough-In-Dimensions Capacity and Gas and Electrical CharacteristicsFacts to Consider About the Location Locating the NEW Water HeaterAir REQUIREMENTs Insulation BlanketsOutdoor Air Through Two Openings Unconfined SpaceConfined Space Fresh Air Openings For Confined SpacesAIR from Other Indoor Spaces Outdoor AIR Through TWO Horizontal DuctsOutdoor AIR Through TWO Vertical Ducts Space Heating and Potable Water System Installing the NEW Water HeaterChemical Vapor Corrosion Water PipingValve and Pipe Insulation if supplied Temperature-Pressure Relief ValveThermal Expansion Gas Piping High Altitude InstallationContact qualified installer or service agency Per square inch 3.5 kPa Sediment TrapsFilling the Water Heater Venting Vent Pipe AssemblyVent Pipe Termination Termination Clearances Sidewall Power VentBreathing Hazard Carbon Monoxide Gas Planning the Vent SystemCondensate Vent Terminal INSTALLATION, Sidewall Blower Assembly InstallationInstallation of Vent System Pointed in the correct position, see Figure Power Vent Wiring Schematic FigureChisel an opening approximately one half inch 1.3 cm larger Than the marked circleInstallation of Vertical Vent System Installation of Vent SYSTEM, SidewallVertical VAA Installations Recommended Vent Attenuation Assembly InstallationVent attenuation assembly Flexible tubing Instruction sheet Inch vent Vertical VAA Installations Recommended BRUSH* Size for Primer Cement Applications Vent Pipe PreparationStep G Step BStep E Step FDo not TRY to Light the Burner by Hand Power Before ServicingDo not try to light the burner by hand What to do if YOU Smell GASD E F Temperature RegulationTemperature Indicators Temperature Adjustment Buttons DisplayOperational Conditions For Your InformationStart UP Conditions Anode ROD Inspection Periodic MaintenanceOpen the water heater drain valve to flush the storage tank Temperature-Pressure Relief Valve TestKeep hands clear of drain To Flush the Water Heater Storage TankLeakage Checkpoints ServiceTrouble Shooting Troubleshooting GuidelinesUnplug ignitor assembly plug from control. Check resistance Ensure the flame sensor is clean use ultra fine steelTurn off power to the water heater Assembly if damaged or defectiveCheck vent temperature limit switch if it is determined Unplug the ignitor assembly plug from the control. CheckResistance of the black resistor wire between pins Assembly .2 If the reading taken is less than 100,000Troubleshooting Guidelines ALL Other Parts Service and Repair ExpensesClaim Procedure Tank

BTX-80 SERIES 100 specifications

The A.O. Smith BTX-80 Series 100 is a cutting-edge heating solution designed for effective and efficient water heating. This model is particularly well-suited for residential applications, offering an impressive balance of performance and energy efficiency.

One of the standout features of the BTX-80 Series 100 is its innovative design, which incorporates a high-efficiency condensing technology. This allows the unit to capture and utilize heat that would otherwise be lost in traditional systems, thereby maximizing energy usage and reducing overall operating costs. With an impressive energy factor (EF) rating, this water heater contributes to lower utility bills while promoting environmental sustainability.

The BTX-80 is equipped with a powerful 80-gallon tank, providing ample hot water for households of varying sizes. Its large capacity ensures that multiple appliances can operate simultaneously without running out of hot water, making it an ideal choice for families with high demand. The model also incorporates a robust heating element that ensures rapid recovery and maintains consistent water temperatures.

Safety and convenience are paramount in the design of the BTX-80. It features a comprehensive digital control system that allows users to set precision temperature settings according to their needs. The intuitive interface simplifies adjustments and monitoring, while safety mechanisms like temperature and pressure relief valves provide peace of mind during operation.

A.O. Smith has also prioritized quality and durability in the construction of the BTX-80 Series 100. The tank is made from high-quality materials and comes with a robust enamel coating that resists corrosion and extends its lifespan. Additionally, the unit is backed by a lengthy warranty, reflecting the manufacturer's confidence in its longevity.

Installation and maintenance are straightforward with the BTX-80, as it is designed to fit seamlessly into existing plumbing configurations. Furthermore, the unit operates quietly, ensuring minimal disruption in the home environment.

In conclusion, the A.O. Smith BTX-80 Series 100 stands out in the market as a reliable, energy-efficient, and user-friendly water heating solution. With its advanced technologies and emphasis on safety and durability, it proves to be a smart investment for any household looking to improve their hot water system.