A.O. Smith BTR 151 THRU 201/A warranty

Page 13

TWO TEMPERATURE - ONE HEATER HIGH TEMPERATURE STORAGE

WITH RECIRCULATION OF SANITIZING LOOP

NOTE 1: TOGGLE SWITCH CONTROLS 180°F (82°C) WATER CIRCULATION. INSTALL ON OR CLOSE TO DISHWASHING MACHINE. TOGGLE SWITCH MUST BE CLOSED (ON) DURING THE RINSE OPERATIONAND OPEN (OFF) WHEN DISHWASHER IS NOT OPERATING OR WHEN ON LONG STANDBY.

NOTE 2: INSTALLLINE TEMPERATURE CONTROL INAN UNINSULATED TEE BEYOND THE DISHWASHING MACHINE TAKEOFF IN THE SANITIZING LOOP. CONTROL SHOULD BE SET AT 185°F (85°C).

NOTE 3: ADJUST PLUG COCK SO THE SANITIZING LOOP FLOW RATE DOESNOTCAUSEUNNECESSARYTURBULENCEINTHETANK.

*TEMPERED WATER LOOP, IF USED, CONNECT TO POINT “A”.

**PIPE RELIEF VALVE TO OPEN DRAIN.

INSTALL INACCORDANCE WITH LOCAL CODES.

CAUTION: IF BUILDING COLD WATER SUPPLY HAS A BACKFLOW PREVENTER, CHECK VALVE OR WATER METER WITH CHECK VALVE. PROVISIONS FOR THERMAL EXPANSION OF WATER

IN THE HOTWATER SYSTEM MUST BE PROVIDED.

DANGER

TEMPERATURE SETTING SHOULD NOT EXCEED SAFE USE TEMPERATURE AT FIXTURES. SEE WATER TEMPERATURE CONTROL WARNING ON PAGE 20. IF HIGHER PREHEAT TEMPERATURES ARE NECESSARY TO OBTAIN ADEQUATE BOOSTER OUTPUT, ADD AN ANTI-SCALD VALVE FOR HOT WATER SUPPLIED TO FIXTURES.

13

Image 13
Contents Andnotifyownertokeepforfuturereference PlacetheseinstructionsadjacenttoheaterDivision of A. O. Smith Corporation Recovery Rating Capacities GPH AT Temperature Rise Shown ROUGH-IN-DIMENSIONSForeword Heater Performance DataTable of Contents High Altitude Installations FeaturesExtended NON-USE Periods Insulation BlanketsExhaust Inducer Blower Assembly High Limit SwitchElectronic Ignition Control Circulating PumpUncrating Required AbilityLocating the Heater LevelingTo the Heater and Risk of Fire or Explosion Unconfinedspace VentingConfinedspace Water Line Connections Multiple Heater ManifoldWater Potable Heating Space Heating Relief ValvePurging GAS PipingGAS Pressure Regulator Length Nominal Iron Pipe Sizes Inches FeetSingle Unit Wiring Diagram Heater WiringGeneral Installation DiagramsHorizontal Storage Tank and Forced Circulation Vertical Storage Tank and Forced CirculationPage Circulating Return Line Connection Installation DIAGRAMS-SIDE INLET/OUTLET UsageHeater with Mixing Valve and Recirculated Sanitizing Loop TWO PRE-HEATERS with Booster Heater Horizontal Storage Tank Sequence of Operation OperationWhat to do if YOU Smell GAS For Your Safety Read Before OperatingWater Temperature Control Preventive MaintenanceCheck the Ignitor Assembly Ignitor AssemblyGAS Valves Remote Storage Tank Temperature ControlChecking the Input Venting SystemAnode ROD Inspection HOT Water OdorFlushing DrainingDeliming Using FLO-JUG Method Tank Cleanout ProcedureDeliming Solvents Replacement Parts ServiceSystem Diagnostics Ignition Module SystemYES Sequence of Operation Flow ChartComplaint Cause User Serviceman Operational ChecklistRemedy Claimprocedure ServiceandrepairexpensesKeepthiswarrantypostedadjacenttotheheaterforfuturereference TankSmith Water Products Company