A.O. Smith BTR 151 THRU 201/A warranty Sequence of Operation Flow Chart, Yes

Page 25

SEQUENCE OF OPERATION FLOW CHART

Description of this flow chart can be found in the “SEQUENCE OF OPERATION” section found on page 18.

Switch power on

Ignition

 

 

Control Board

 

 

to unit.

opens Gas

 

 

 

Valve.

 

 

Thermostat calls

Ignition Control

 

 

Board shuts off

 

 

for heat.

Silicon Nitride

 

 

 

Ignitor after

 

 

 

3 seconds

 

 

Ignition Control

Ignition Control

 

 

Board performs

Board waits 3 more

 

 

diagnostic check on

seconds to

 

 

components

monitor Flame

 

 

 

Sensor.

 

 

Ignition Control

 

 

 

Board sends power

 

 

 

to Exhaust Inducer

 

 

Ignition Control

 

Did Main

 

 

NO

Board shuts off Gas

 

Burner Light?

 

Valve and allows the

 

 

 

Exhaust Inducer to

 

 

 

purge appliance for

 

 

 

20 seconds.

Exhaust Inducer

 

 

 

engages Prover

 

 

 

Switch

 

 

 

 

YES

 

 

 

Ignition Control

 

 

Ignition Control

Board monitors

 

 

units until T’Stat

 

 

Board provides

is satisfied.

 

 

power to Silicon

 

 

 

Nitride Ignitor

 

 

 

Silicon Nitride

 

 

 

Ignitor

 

 

 

warms up for

 

 

 

20 seconds

 

 

 

 

25

 

 

Image 25
Contents Andnotifyownertokeepforfuturereference PlacetheseinstructionsadjacenttoheaterDivision of A. O. Smith Corporation Recovery Rating Capacities GPH AT Temperature Rise Shown ROUGH-IN-DIMENSIONSForeword Heater Performance DataTable of Contents High Altitude Installations FeaturesExtended NON-USE Periods Insulation BlanketsExhaust Inducer Blower Assembly High Limit SwitchElectronic Ignition Control Circulating PumpUncrating Required AbilityLocating the Heater LevelingTo the Heater and Risk of Fire or Explosion Unconfinedspace VentingConfinedspace Water Line Connections Multiple Heater ManifoldWater Potable Heating Space Heating Relief ValvePurging GAS PipingGAS Pressure Regulator Length Nominal Iron Pipe Sizes Inches FeetSingle Unit Wiring Diagram Heater WiringGeneral Installation DiagramsHorizontal Storage Tank and Forced Circulation Vertical Storage Tank and Forced CirculationPage Circulating Return Line Connection Installation DIAGRAMS-SIDE INLET/OUTLET UsageHeater with Mixing Valve and Recirculated Sanitizing Loop TWO PRE-HEATERS with Booster Heater Horizontal Storage Tank Sequence of Operation OperationWhat to do if YOU Smell GAS For Your Safety Read Before OperatingWater Temperature Control Preventive MaintenanceCheck the Ignitor Assembly Ignitor AssemblyGAS Valves Remote Storage Tank Temperature ControlChecking the Input Venting System Anode ROD Inspection HOT Water Odor Flushing DrainingDeliming Using FLO-JUG Method Tank Cleanout ProcedureDeliming Solvents Replacement Parts ServiceSystem Diagnostics Ignition Module SystemYES Sequence of Operation Flow ChartComplaint Cause User Serviceman Operational ChecklistRemedy Claimprocedure ServiceandrepairexpensesKeepthiswarrantypostedadjacenttotheheaterforfuturereference TankSmith Water Products Company