A.O. Smith GPVR-50, GPVX-50, GPVH-50 Vent Connections to Blower Assembly, Venting and Installation

Page 15

VENT CONNECTIONS TO BLOWER ASSEMBLY

Figure 15 shows the optimal placement of the 2" to 3" or 3" to 4" reducer; however, the vent can be reduced at any point in the vent system as long as the maximum and minimum vent length requirements are met.

FIGURE 15.

VENTING AND INSTALLATION

Plan the layout of the vent system from the vent termination to the water heater considering all of the 90° and 45° elbows plus the number of feet of pipe that would be needed to install the total vent system. The water heater must be vented to the outdoors as described in these instructions. DO NOT connect this water heater to an existing vent or chimney. It must be vented separately from all other appliances. Nonmetallic vent may be used if it has “Heat Deflection Temperature” (HDT@66 psi) or 455 kPa of at least 157°F or 69°C. Typical nonmetallic vent materials meeting this requirement are: PVC (Schedule 40, ASTM D-1785), Coex Cellular Core (Schedule 40, ASTM F-441), CPVC (Schedule 40, ASTM D-2846), ABS (Schedule 40, ASTM D-2661). The fittings, other than the supplied Vent Termination should be equivalent to the following: PVC (Schedule 40, DWV, ASTM D-2665), CPVC (Schedule 40, DWV, ASTM F-438), ABS (Schedule 40 DWV, ASTM D-2661).

The cement used should be as recommended by the vent pipe manufacturer. See the instructions on pages 18 and 19 for the proper method of cutting and cementing the PVC pipe and fittings.

15

Image 15
Contents Residential GAS Water Heaters Power Vented GAS Models with HOT Surface IgnitionImportant Definitions Safe INSTALLATION, USE and ServiceGeneral Safety Introduction Table of ContentsKeep Clear of ALL Obstructions Propane HOT Surface Igniter & Main Burner Typical InstallationDrain Pan Natural HOT Surface Igniter & Main BurnerMixing Valve Usage Facts to Consider about the Location Locating the NEW Water HeaterInsulation Blankets ALL AIR from Outdoors See Figures 7, 8 ALL AIR from Inside Buildings SeeThermal Expansion Installing the NEW Water HeaterWater Piping Closed Water Systems Valve and Pipe Insulation if supplied TEMPERATURE-PRESSURE Relief ValveGAS Piping GAS Piping with Flexible ConnectorFilling the Water Heater Blower Assembly InstallationSequence of Installation Sediment TrapsVenting and Installation Vent Connections to Blower AssemblyMaximum and Minimum Vent Lengths CondensateVenting Vent Terminal InstallationVertical Vent Through Roof Vertical Vent Termination RestrictionsRecommended BRUSH* Size for Primer Cement Applications Vent Pipe PreparationStep G Step BStep E Step FPage GAS Control Valve Front View Temperature RegulationStart UP Conditions For Your InformationBurner Operation and Inspection Periodic MaintenanceBurner Cleaning Venting System InspectionDraining TEMPERATURE-PRESSURE Relief Valve OperationDrain Valve Washer Replacement Anode ROD InspectionLeakage Checkpoints ServiceNot Shown Optional Repair Parts ListTrouble Shooting Troubleshooting GuidelinesPage Troubleshooting Guidelines Limitation on Implied Warranties Service and Labor ResponsibilityClaim Procedure Conditions and Exceptions